LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: LEED Homes Pilot Credit 29 - Gimme Point
in Pilot Credit 29: Housing & Jobs Proximity
20 Jon Texter
President
Essex General Construction, Inc.
Thu, Jun 14, 2012
RE: Legacy LEED AP
in NC 2009 IDc2: LEED Accredited Professional
35 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Thu, Jun 14, 2012
RE: What should USGBC do with the extra time to ensure success?
in LEED 2012 Postponed to 2013, Renamed LEED v4
28 Larry Sims
Principal
Studio4, LLC
Thu, Jun 14, 2012
RE: LEED Specifications
in Top Six Things LEED Consultants Do Wrong in Specs
5 Hernando Miranda
Owner
Soltierra LLC
Wed, Jun 20, 2012
Dan,
in LEED Submittal Forms, Beta to v3
1 Emily Catacchio
Sustainability Specialist
Wight and Company
Tue, Jun 12, 2012
RE: Required Signatory IEQp2-1 form?
in Schools 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
6 Emily Catacchio
Sustainability Specialist
Wight and Company
Tue, Jun 12, 2012
RE: No new parking in a big campus
in Schools 2009 SSc4.4: Alternative Transportation—Parking Capacity
19 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 4, 2012
RE: 4th edition vs. 3rd edition
in More Money, Less Guesswork: ITE Parking Generation Study and SSc4.4
18 Emily Catacchio
Sustainability Specialist
Wight and Company
Thu, Jun 21, 2012
RE: Residential, Option 3
in Doing the Alternative Commuting Transportation Survey
8 Erin Nuckols
Sustainable Building Associate
Institute for the Built Environment
Mon, Jun 4, 2012
RE: LEED Online Access to Certified Projects
in LEED Online Access to Certified Projects
8 Matt Bartner
Wed, May 30, 2012
RE: 4th comment period open
in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum
107 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Tue, May 15, 2012
RE: Combining Pathways
in Pilot Credit 43: Certified Products
21 Melissa Vernon
Director of Sustainable Strategy
Interface
Mon, May 7, 2012
RE: LEED certification in China
in Hi from China LEED engineer
3 Hernando Miranda
Owner
Soltierra LLC
Sat, May 5, 2012
retaining LEED certification
in Loss of LEED Certification after renovating?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, May 1, 2012
Reference Guide E-Books need to be editable or updated by USGBC
in LEED 2012 Behind the Scenes - follow up conversation
4 Michelle Reott
LEED AP BD+C, ID+C, Managing Principal
Earthly Ideas LLC
Tue, May 1, 2012
RE: Surrounding Density and Diverse Uses
in LEED 2012 – 3rd Public Comment – LT (Location and Transportation) Section
16 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Fri, Apr 27, 2012
RE: Discovered Change in Energy Data
in Webcast: Energy Benchmarking in LEED-EBOM—Avoiding Pitfalls with LEEDuser's Top Expert
6 Jenny Carney
Principal
YR&G
Tue, May 1, 2012
RE: Fundamental Commissioning
in LEED 2012 – 2nd Public Comment – Performance (PF) Section
9 Daniel Forino
Sustainability Engineering
Horizon Engineering Associates
Thu, Apr 19, 2012
RE: PI Form 3 - Daily Occupancy
in Filling out Space Usage Type
17 Tyra Sorensen
Wed, Apr 11, 2012
RE: GSF with demolition
in Demolition of Existing Building
4 Clint Newton
Project Manager
Spillman Farmer Architects
Wed, Apr 11, 2012
Title Comments Most Recent Post
RE: Percantage Make-Up
in Healthcare-v2009: Sustainably sourced materials and products
5 BABAR MEHMOOD
SAUD CONSULT
Sat, May 18, 2013
RE: Casework
in NC 2009 MRc7: Certified Wood
238 Jason Grant
Principal
Jason Grant Consulting
Fri, May 17, 2013
School addition - LEED Boundary
in MPR3: Must use a reasonable site boundary
96 padraic o connell
Fri, May 17, 2013
RE: Recycled Soil and Aggregate
in NC 2009 MRc4: Recycled Content
255 Lyle Axelarris
Civil Engineer, LEED AP BD+C, O+M
Design Alaska
Fri, May 17, 2013
Acoustics study
in NC 2009 IDc1: Innovation in Design
355 Katie Schulze
Project Specialist
Investive Building Projects
Fri, May 17, 2013
RE: Building Envelope Commissioning LEED required test methodology
in NC 2009 EAc3: Enhanced Commissioning
169 Brett Farbstein
Commissioning Engineer
AKF Group
Fri, May 17, 2013
RE: Form Questions
in Healthcare-v2009: Acoustic environment
7 BABAR MEHMOOD
SAUD CONSULT
Fri, May 17, 2013
RE: Entry mat in vestibule w/ tile surround
in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 17, 2013
RE: Meaning of "Ready to Use Products"
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
333 Alicia Silva
CEO
Revitaliza consultores
Fri, May 17, 2013
CS - Residential Building
in MPR6: Must commit to sharing whole-building energy and water usage data
10 CRolim Engenharia
Fri, May 17, 2013
RE: LEV discounted parking
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
209 BABAR MEHMOOD
SAUD CONSULT
Fri, May 17, 2013
RE: Ventilated attic roofs - Baseline Vs Proposed
in CS 2009 EAc1: Optimize Energy Performance
207 Marcus Sheffer
LEED Fellow
7group
Fri, May 17, 2013
RE: Design Respons from GBCI C6.1
in NC 2009 SSc6.1: Stormwater Design—Quantity Control
111 Michael DeVuono
T&M Associates
Fri, May 17, 2013
RE: Educational Program
in CS 2009 IDc1: Innovation in Design
42 Morteza Kasmaei
Principal
Climatic Design Inc.
Fri, May 17, 2013
Vertical addition to a hotel project
in MPR2: Must be a complete, permanent building or space
45 Adam Targowski
Owner
ATsec
Fri, May 17, 2013
RE: Determining FTE, PTE
in PIf3: Occupant and Usage Data
94 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 17, 2013
green roof cover - ivy
in CS 2009 SSc7.2: Heat Island Effect—Roof
83 Mario Pinoli
Fri, May 17, 2013
Room by Room flush-out Calculations
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
124 Lauren Glasscock
Sr. Sustainability Professional
DNV KEMA Energy & Sustainability
Thu, May 16, 2013
Who develops the plan for corrective action?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
61 Nicole Kimoto
Thu, May 16, 2013
RE: Bicycle Storage for a Daycare
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
157 Lauren Fakhoury
Research Assistant
Sustainable Design Consulting, LLC
Thu, May 16, 2013
Title Comments Most Recent Post
Seems like one rack is okay
in CI SS C3.2- Bicycle Storage and Changing Rooms
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Feb 14, 2010
As a CIR?
in Can LEED NC 2009 credits be applied to Schools 2009 certification and vice versa?
1 Joshua Radoff
Principal, LEEDuser Primary Author
YRG sustainability
Sun, Feb 14, 2010
NC2.2 EQc6.1 & EQc6.2 - Do the shared multi-occupant spaces need
in NC2.2 EQc6.1 & EQc6.2 - Do the shared multi-occupant spaces need to match between credits?
1 Shannon Gray
Consultant
YRG sustainability
Sun, Feb 14, 2010
LEED NC2.2 SSc4.3 & AGMBC
in LEED NC2.2 SSc4.3 & AGMBC
1 Steve Loppnow
Sustainability Manager
YR&G
Sun, Feb 14, 2010
Thread in IEQc3.2
in Flush Out & Off Gassing
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jan 5, 2010
RE: re: BIRC
in EBOM 2009 IEQc3.6 IPM - Are the "least toxic" products listed by the BIRC LEED compliant?
2 Drew Johnson
LEED AP O+M
Mon, Dec 28, 2009
LEED CS - Version 2.0
in LEED CS - Version 2.0
1 Shannon Gray
Consultant
YRG sustainability
Wed, Dec 2, 2009
SSc8 is really 3 credits?
in If you could invent a new credit, what would it be?
1 LEEDuser Live from Greenbuild
Wed, Nov 11, 2009
Title Votes Comments Most Recent Post
RE: Current registered project shifts to New Rating Systems
in Comment on the New LEED Rating System Draft to be Released in 2012
59 97 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, May 19, 2011
Tenant area-HVAC system type
in CS 2009 EAc1: Optimize Energy Performance
58 207 Amgad Khattab
LEED Product Manager
Raya Smart Buildings
Fri, Sep 2, 2011
partial renovation / partial expansion EAc1 points
in CS 2009 EAc1: Optimize Energy Performance
58 207 Mary Ann Santos
Tue, May 8, 2012
RE: Daylight Sensors
in CS 2009 EAc1: Optimize Energy Performance
58 207 Marcus Sheffer
LEED Fellow
7group
Tue, Sep 4, 2012
RE: Roof space under the perforated panel
in CS 2009 SSc7.2: Heat Island Effect—Roof
58 83 Mara Baum
Healthcare Sustainable Design Leader
HOK
Wed, Aug 18, 2010
RE: Design Storm Interval
in EBOM 2009 SSc6: Stormwater Quantity Control
58 50 Jenny Carney
Principal
YR&G
Tue, Sep 21, 2010
Documenting Controller Efficiency
in NC 2009 WEc1: Water Efficient Landscaping
58 234 Michael Hill
Mon, Feb 7, 2011
RE: What is the correct way to find the width of the street?
in Pilot Credit 14: Walkable Streets
58 45 Chris Marshall
Manager, LEED Technical Development
U.S. Green Building Council
Thu, Apr 7, 2011
A & B bus lines - do they count separately?
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
58 97 Jill Ziegler
Program Manager for Sustainability Initiatives
Forest City Enterprises, Inc.
Wed, May 25, 2011
RE: Commissioning Agent
in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems
58 53 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Sep 22, 2010
RE: Interior Lighting_24-hour operation project
in NC 2009 SSc8: Light Pollution Reduction
58 395 Eric Dixon
Energy Performance Analyst
HDR Architecture
Mon, Jan 9, 2012
RE: LZ2 - LZ3
in NC 2009 SSc8: Light Pollution Reduction
58 395 Glenn Heinmiller
IALD, LC, LEED AP, Principal
Lam Partners
Thu, Mar 1, 2012
do fire extinguishers and the
in CI 2009 MRc4: Recycled Content
58 122 kelvin duen
Fri, Aug 13, 2010
RE: Ongoing Commissioning Overlap with New Building Commissioning
in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning
58 26 Pierce Holstrom
Director of Engineering
Environmental Building Strategies
Wed, Aug 11, 2010
RE: Outside of the US
in CS 2009 EAc6: Green Power
58 40 Lana Malone
Director of Business Development- Green Building Division
Renewable Choice Energy
Wed, Sep 8, 2010
RE: LEED CI v2.0 EQc4.5 Template
in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
58 102 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Aug 29, 2010
USGBC responses to comments on LEED Interpretations
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
58 27 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Tue, Mar 1, 2011
RE: USGBC responses to comments on LEED Interpretations
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
58 27 Marcus Sheffer
LEED Fellow
7group
Thu, Mar 3, 2011
RE: Existing Equipment
in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances
58 188 Lauren Glasscock
Sr. Sustainability Professional
DNV KEMA Energy & Sustainability
Thu, Aug 12, 2010
RE: Offices building Project Boundary
in LEED Minimum Program Requirements
58 428 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, May 24, 2011
Title Comments Most Recent Post
Aerosol Coating Product ( Spray Paint?)
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
333 John-David Hutchison, LEED AP BD+C, PMP
Sustainability Consultant
CSV Architects
Fri, Feb 10, 2012
Existing Imperviouness
in CS 2009 SSc6.1: Stormwater Design—Quantity Control
20 Markus Henning
M.Eng Facility Management
Alpha Energy & Environment
Fri, Feb 10, 2012
Evapotranspiration rate
in CS 2009 WEc1: Water Efficient Landscaping
37 M K
Fri, Feb 10, 2012
Ashrae 90.1 - Tradable Surfaces
in CS 2009 EAp2: Minimum Energy Performance
516 Angela Saggin
Fri, Feb 10, 2012
Commissioning firm instead of a specific person?
in NC 2009 EAc3: Enhanced Commissioning
169 Veronika Sundberg
Environmental Engineer - Certification
Skanska Sverige AB
Fri, Feb 10, 2012
Pressure Drop Adjustment when no HVAC has been designed
in CS 2009 EAp2: Minimum Energy Performance
516 Santiago Rodriguez
Consultant
REVITALIZA CONSULTORES
Fri, Feb 10, 2012
Team Members Blocked from accessing the Project
in Owner team member and signatories
12 Mairead Morrissey
Principal Environmental Consultant
AWN Consulting Ltd
Fri, Feb 10, 2012
SCS Gold Certificate
in Schools IEQc4.5: Low-Emitting Materials—Furniture and Furnishings
10 Suzanne Allerton
Architect
W2A Design Group
Thu, Feb 9, 2012
ARI Certification for Japanese equipment in LEED-NC 2.2
in NC v2.2 EAp2: Minimum Energy Performance
174 Mauricio Ramirez
Thu, Feb 9, 2012
Residential project
in LEED Rating System Selection Q&A
331 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Thu, Feb 9, 2012
How to address the lighting in a train station?
in NC v2.2 EAp2: Minimum Energy Performance
174 Rosana Correa
Director
Casa do Futuro
Thu, Feb 9, 2012
Strategy changes after construction review
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
332 Michael Smithing
Director - Green Building Advisory
Colliers International
Thu, Feb 9, 2012
Using the centerline as the "site boundary"
in NC 2009 SSc8: Light Pollution Reduction
395 Zachary Guren
LEED AP BD+C
Wed, Feb 8, 2012
Addition to Hospital with Shared HW and CHW Plant
in NC 2009 EAc1: Optimize Energy Performance
812 David Weigel, PE
Managing Member
The Watt Doctors, LLC
Wed, Feb 8, 2012
Charging stations and Calgreen
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
209 deborah lucking
Wed, Feb 8, 2012
PEAK Transients--What makes for PEAK? Not TOTALLY Occupied?
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
157 Brooks Critchfield
Principal
Open Field Designs, Inc.
Wed, Feb 8, 2012
Option 2 with exterior lights on motion sensors
in EBOM 2009 SSc8: Light Pollution Reduction
82 Melinda Shah
Architect
Schooley Caldwell Associates
Wed, Feb 8, 2012
LEED CI
in International Projects - alternative compliance path
116 MARIA GARCIA
Wed, Feb 8, 2012
Community Connectivity - Campus Services
in NC 2009 SSc2: Development Density and Community Connectivity
120 Shannon Terrell
Sustainable Design Director
Walter Robbs Callahan & Pierce Architects
Wed, Feb 8, 2012
IEQp1 required signatory
in NC-2009 IEQp1: Minimum IAQ Performance
467 Anne-Maria Vierinen
Environmental Specialist, M.Sc (Tech.), LEED AP
Vahanen Oy
Wed, Feb 8, 2012

Copyright 2013 – BuildingGreen, Inc.