LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: Can A project Team Perform that credit
in Schools SSp2: Environmental Site Assessment
52 Larry Sims
Principal
Studio4, LLC
Tue, Dec 17, 2013
RE: LTc1. possible 18 points
in CI-v4: LEED for neighborhood development location
3 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Fri, Dec 13, 2013
I agree Tristan!
in Dear USGBC, Give Us Transparency on LEED Energy Data
4 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Fri, Dec 13, 2013
RE: Utility tariff - an accepted DR strategy?
in Data Centers-NC-v4: Demand response
2 Marcus Sheffer
LEED Fellow
7group
Fri, Dec 13, 2013
RE: Do Requirements Apply?
in Retail–NC-v2009: Low-emitting materials
3 Carly Ruggieri
Senior Sustainability Consultant
Steven Winter Associates, Inc.
Fri, Dec 6, 2013
RE: LEED Data Set - Energy Use Way Too High!
in Energy Star Score of 85 for 450 LEED Buildings in Biggest Data Release Yet
2 Michele Helou
Principal
Sage Design & Consulting
Thu, Dec 5, 2013
RE: Qualifying Third party certification examples?
in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes
8 Christine Robbins-Elrod
Studio Director
5G Studio Collaborative,llc.
Tue, Dec 3, 2013
RE: my experience
in LEED core + shell vs. new construction
8 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Tue, Dec 3, 2013
RE: The role of concensus in green rating systems
in Chemical Industry Touts Anti-LEED Language in Appropriations Bill
19 Paula Melton
Managing Editor
BuildingGreen, Inc.
Tue, Dec 3, 2013
RE: Development Density and Community Connectivity
in NC v2.2 SSc2: Development Density and Community Connectivity
28 Gulcin Tanil
Tue, Dec 3, 2013
RE: LEED for Schools 2007
in NC v2.2 EAc6: Green Power
62 Hernando Miranda
Owner
Soltierra LLC
Mon, Dec 2, 2013
RE: V4 implementation and '09 phase out
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Sun, Dec 1, 2013
RE: Registration for Subsequent Stages
in PIf2: Project Timeline
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, Nov 26, 2013
RE: GHG Emissions in Pilot Credit EAC27
in Pilot Credit 27: Reconcile Projected and Actual Energy Performance
17 Marcus Sheffer
LEED Fellow
7group
Tue, Nov 26, 2013
RE: Bicycle network
in Pilot Credit 13: Bicycle Network, Storage, and Changing Rooms
35 Ann Lubbers
Tue, Nov 26, 2013
RE: Cant find 2.1(b) and c()
in Homes-v2008: Durability management process
4 Batya Metalitz
Manager, LEED Technical Development
USGBC
Mon, Nov 25, 2013
RE: Exterior Lighting
in NC v2.2 EAc5: Measurement and Verification
25 Marcus Sheffer
LEED Fellow
7group
Mon, Nov 25, 2013
RE: S12.2-2010
in Schools 2009 IEQc9: Enhanced Acoustical Performance
32 deborah lucking
associate
fentress architects
Fri, Nov 22, 2013
Eligibility for bicycle network
in Pilot Credit 30: Alternative Transportation
9 Chris Wittig
Fri, Nov 15, 2013
RE: Projects 40 acres or greater
in ND-v2009: Mixed-use neighborhood centers
9 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Thu, Nov 14, 2013
Title Comments Most Recent Post
RE: Homers energy efficiency in Central America
in ND-v2009: Building energy efficiency
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Aug 19, 2013
RE: Metering faucet for Ktchen sink
in Retail–NC-v2009: Water use reduction
5 Richard Manning
Principal
Green Building Services
Tue, Aug 13, 2013
RE: Asbestos abatement for existing building renovation
in CS 2009 SSc3: Brownfield Redevelopment
8 Larry Sims
Principal
Studio4, LLC
Wed, Aug 7, 2013
RE: Proximity to farmers' market
in ND-v2009: Local food production
8 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, Sep 17, 2013
RE: Do bio-based inhibited glycols contribute to LEED certification?
in NC v2.2 MRc6: Rapidly Renewable Materials
25 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Aug 5, 2013
RE: Peak Discharge Rate
in Schools 2009 SSc6.1: Stormwater Design—Quantity Control
6 Nicole Ferrini
via T&M Associates
Fri, Aug 2, 2013
RE: Credit Requirements
in Pilot Credit 61: Material Disclosure and Assessment
8 Melissa Vernon
Director of Sustainable Strategy
Interface
Wed, Jul 31, 2013
RE: LEED ND - outside the US
in ND-v2009: Building water efficiency
5 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Jul 29, 2013
HVAC baseline model
in Retail–CI-v2009: Optimize energy performance - HVAC
1 Francesco Passerini
engineer
leedme.it
Wed, Jul 24, 2013
RE: Indoor AHUs and MERV 13 filters
in EBOM 2009 IEQc1.4: IAQ Best Management Practices—Reduce Particulates in Air Distribution
33 Mech Engineer
LEED AP BD+C
Mon, Jul 22, 2013
RE: SS7.2 question about form
in Schools 2009 SSc7.2: Heat Island Effect—Roof
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 15, 2013
RE: roof deck, roof
in NC v2.2 MRc1.1–1.2: Building Reuse
24 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Jul 11, 2013
RE: Crushed Concrete used
in CS 2009 MRc3: Materials Reuse
16 RIM Architects
RIM Architects
Mon, Jul 8, 2013
RE: LEED 2009 ID+C Study Guide Typo? IEQ C2
in CI 2009 IEQc2: Increased Ventilation
10 Elizabeth Ingram
LEED Green Assoc.
Thu, Jul 4, 2013
RE: Retrofit
in Healthcare-v2009: Hazardous material removal or encapsulation (renovations only)
5 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, Jun 26, 2013
RE: Systems Required in Cx Scope
in Schools-2009 EAp1: Fundamental Commissioning of Building Energy Systems
7 John Glaeser
Fri, Dec 20, 2013
RE: Upper and lower roof
in Healthcare-v2009: Heat island effect - roof
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 31, 2013
RE: Number of testing point
in Healthcare-v2009: Construction IAQ management plan - before occupancy
6 Emil Andersson
Green Certification Coordinator
Skanska Sweden
Fri, May 31, 2013
RE: Pilot credit
in ND-v2009: Innovation and exemplary performance
2 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Thu, May 30, 2013
RE: Regional Credits in Canada?
in Healthcare-v2009: Regional priority
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 3, 2013
Title Comments Most Recent Post
RE: LEED Dynamic Plaque--any thoughts and experiences to share?
in LEED Rating System Selection Q&A
605 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Tue, Sep 2, 2014
Updated documentation and resubmittal in construction phase
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
560 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Tue, Sep 2, 2014
LEED AP - Experience required
in Start a New LEED Discussion Topic
127 Rita Barata
Mon, Sep 1, 2014
Study Guides and Practice Exams for LEED v4
in Got Technical Questions on LEED v4?
56 Cindy Davis
Associate Principal
Callison Architecture
Wed, Aug 27, 2014
RE: ACP Form
in International Projects - alternative compliance path
154 Sean Fish
Project Manager, LEED
U.S. Green Building Council
Wed, Aug 27, 2014
RE: A few comments...
in LEED v4 Public Comment Forum - LEED Takes a New Direction
98 Brian McCallister
Tue, Aug 26, 2014
Cannot upload after review comments
in Living with LEED Online - quirks, bugs and hiccups
136 Robert Wichert
Engineer
Fri, Aug 22, 2014
RE: Campus-Same master site- LEED NC v4 and LEED EBOM 2009
in New LEED Guidance for Campuses and Multiple Buildings
495 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Tue, Aug 19, 2014
RE: CARB and ECO-Certified
in New Rules for Formaldehyde in IEQc4.4
7 Nick _
Architect, LEED AP
Wed, Aug 13, 2014
RE: Thanks Tristan!
in GBCI Invites Direct Inquiries—But Do Your Homework First
19 Megan Ritchie Saffitz
Director of LEED Support
U.S. Green Building Council
Mon, Aug 11, 2014
RE: LEED Interpretation: Effective Date
in Review Comments with Phantom Requirements
89 Hernando Miranda
Owner
Soltierra LLC
Fri, Aug 8, 2014
Defering Design credit
in Defer Credits
4 Stella Stella
Thu, Aug 7, 2014
RE: hotel with restaurant
in Calculating FTEs
184 LEEDme STRATEGIE D'IMPRESA
Mon, Aug 4, 2014
RE: plaque presentation
in 17 critical—and misunderstood—LEED terms
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jul 31, 2014
RE: LEED Volume Program - Submittal Guidance
in Forum for LEED Volume Program Certification
7 Ashley Catlett
USGBC/GBCI
Wed, Jul 30, 2014
RE: LEED AP BD+C V4
in Experience Requirement Loosened for LEED v4 AP Exam
12 Filipe Boni
Brain
Wed, Jul 23, 2014
RE: Project Registration Required
in A New, More Accessible LEED Online for LEED v4
10 Megan Sparks
Manager, Program Integration
U.S. Green Building Council
Wed, Jul 23, 2014
RE: LEED v4 Green Associate
in 10 Tips for Passing the LEED Green Associate Exam
57 Tonima Ferdous
Thu, Jul 17, 2014
RE: Large footage residence and threshold adjustment
in LEED for Homes (LEED-H) Forum
131 Ann Edminster
founder/principal
Design AVEnues LLC
Tue, Jul 8, 2014
RE: Licensed Professional Exemption (LPE) - outside of USA
in Licensed Professional Exemption
19 Sylvain laporte
GASD-Co
Tue, Jul 8, 2014
Title Votes Comments Most Recent Post
RE: Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
80 95 Allison Beer McKenzie
Architect, Director of Sustainability
SHP Leading Design
Fri, Oct 8, 2010
Peak Transients
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
80 239 Marian Keeler
Senior Associate
Thornton Tomasetti / Sustainability
Wed, Jan 27, 2010
RE: LEED Offline Calculator Space Type Definitions/EUI's
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
80 117 Alexa Stone
ecoPreserve: Building Sustainability
Thu, Sep 15, 2011
RE: August 2011 Addenda
in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
80 51 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Sep 12, 2011
RE: Calculating Perimeter views for Non-Inpatient Areas IEQ8.2 ?
in Healthcare-v2009: Daylight and views - views
80 20 Olivier Brouard
Sustainable Energy Engineer
Thu, Apr 11, 2013
RE: M&V Plan - Questions
in CS 2009 EAc5.1: Measurement and Verification—Base Building
80 94 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Wed, Aug 25, 2010
RE: Outside of the US
in CS 2009 EAc6: Green Power
80 68 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Sep 8, 2010
CSI Division 2.0
in NC v2.2 MRc4: Recycled Content
80 148 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Fri, May 25, 2012
Big SOD grass area with no irrigation, can we get 2 points WE1.2
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
80 81 yongmei gao
Mon, Feb 14, 2011
LEED Interpretations
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
80 27 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Mon, Feb 28, 2011
RE: Residental AND Commercial
in Project Information form
80 45 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Sep 13, 2010
LEED EB or NC?
in LEED Rating System Selection Q&A
79 605 Elke Malleier
Dr.
Sustainability & Green Building Consultant
Tue, May 28, 2013
RE: LEED-NC or LEED-CI
in LEED Rating System Selection Q&A
79 605 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Apr 7, 2014
RE: Revise of input load prior to Appeal
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
79 560 Marcus Sheffer
LEED Fellow
7group
Tue, May 28, 2013
VOC Budget - General Question
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
79 376 Jonathan Weiss
Thu, Aug 12, 2010
RE: CASE 2 vegetated roof inclusion subject to earning SSc2?
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
79 207 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Wed, Aug 11, 2010
RE: All ACP for international projects allow Metric Unit submittals
in International Projects - alternative compliance path
79 154 Eric Johnson
Principal Sustainability Project and Cost Manager
Green Future Now
Tue, Nov 29, 2011
Exemplary Performance for EA Cr3 Enhanced Commissioning
in NC-2009 EAc3: Enhanced Commissioning
79 249 deborah lucking
associate
fentress architects
Fri, Sep 24, 2010
Glass Fiber Reinforced Concrete
in NC 2009 MRc5: Regional Materials
79 254 Linda Davisson
Senior Consultant
Sustainable Design Consulting
Fri, Sep 17, 2010
RE: Preventative Maintenance Plan
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
79 98 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Wed, Dec 29, 2010
Title Comments Most Recent Post
USGBC as Code Officials
in USGBC Engages Chemical Supply Chain with New LEED v4 Option
38 Hernando Miranda
Owner
Soltierra LLC
Wed, Mar 20, 2013
What's the surprise new MR option in LEED v4 all about?
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Mar 19, 2013
PC 26 Advanced Energy Metering - Feedback
in Pilot Credit 26: Advanced Energy Metering
17 SOFIA KESIDOU
Mon, Mar 18, 2013
PC 25 Water Metering and Reporting - Feedback
in Pilot Credit 25: Water Metering & Reporting
8 SOFIA KESIDOU
Mon, Mar 18, 2013
Clogging Issues with Low Flow Fixtures
in NC 2009 WEp1: Water Use Reduction—20% Reduction
590 Melissa Perry
Director of Sustainable Operations
Manfred Construction
Fri, Mar 15, 2013
WR p3 and EA p3 Building-Level Monitoring
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Timothy Nabholz
Miljöcertifieringsingenior (Environmental Certification Engineer)
Skanska
Thu, Mar 14, 2013
LEED v4 Sixth Public Comment
in LEED v4 Public Comment Forum - LEED Takes a New Direction
98 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 13, 2013
WR p3 and EA p3 Building-Level Monitoring
in LEED v4 Public Comment Forum - LEED Takes a New Direction
98 Timothy Nabholz
Miljöcertifieringsingenior (Environmental Certification Engineer)
Skanska
Wed, Mar 13, 2013
asbestos roof
in Asbestos Roof
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 11, 2013
MR Credits - Building product disclosure and optimization
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Melissa Wrolstad
Senior Project Manager
CodeGreen Solutions
Mon, Mar 11, 2013
ID&C - EApr1 - preventing ID&C projects from achieving LEED?
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Melissa Wrolstad
Senior Project Manager
CodeGreen Solutions
Mon, Mar 11, 2013
ASHRAE Standard 55 User's Manual in development
in NC 2009 IEQc7.1: Thermal Comfort—Design
194 Lindsay Austrom
Mechanical Engineer
Stantec
Thu, Mar 7, 2013
Integrative process
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Eddy Santosa
Lead Building Performance Analyst
Callison
Wed, Mar 6, 2013
Comments not addressed
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Bill Swanson
PE, LEED AP
Integrated Architecture
Tue, Mar 5, 2013
LEED AP Credentialing Maintenance Procedures
in LEED AP Specialities: Should You Get One?
29 Michelle Diller
Sustainable Design Services Project Manager
HDR Architecture
Fri, Mar 1, 2013
Change in National Membership Organization
in New USGBC Membership Fee Structure
59 Michael Smithing
Director - Green Building Advisory
Colliers International
Thu, Feb 28, 2013
Vehicle Maintenance Facilities - Lighting
in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls
68 Carlton Ross
Thu, Feb 28, 2013
U.S.G.B.C. definiton of residential
in NC 2009 IEQc7.2: Thermal Comfort—Verification
95 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional, Guiding Principles Compliance Professional
Energy Ace
Thu, Feb 21, 2013
LEED CI v2: transfer to v3, EBOM, or can't certificate?
in LEED Rating System Selection Q&A
605 Richard Cuebas
Integra Design Group, Architects & Engineers, PSC
Thu, Feb 21, 2013
the new formaldehyde rule
in NC 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
171 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Feb 21, 2013

Copyright 2014 – BuildingGreen, Inc.