LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: Stone counter adhesive/filler - problem with VOCs
in Homes-v2008: Environmentally preferable products
2 Ann Edminster
founder/principal
Design AVEnues LLC
Mon, Dec 23, 2013
RE: Key CIR for Registered non-certified LEED-CS v2.0 projects
in Key CIR for Registered non-certified LEED-CS v2.0 projects
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Dec 23, 2013
RE: Recycling in Malaysia
in CI 2009 MRp1: Storage and Collection of Recyclables
57 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Dec 23, 2013
RE: Calculation for recycling storage area
in Healthcare-v2009: Storage and collection of recyclables
10 YP Pierce
Mon, Dec 23, 2013
RE: Change of credits for Regional Priority
in CS 2009 RPc1: Regional Priority
16 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: synergy with SSc5.1
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
81 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: VOC Budget Process - If you make a mistake, you can still get it
in Schools IEQc4.2: Low-Emitting Materials—Paints and Coatings
78 Walter Currin
Project Architect
SHW Group
Fri, Dec 20, 2013
RE: Documentation for DES systems?
in NC v2.2 EAc3: Enhanced Commissioning
51 Scott Bowman
Owner
Integrated Design + Energy Advisors, LLC
Fri, Dec 20, 2013
RE: Does this credit apply for dorms?
in NC v2.2 EQc7.1: Thermal Comfort—Design
26 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: Background Noise Measurements
in Schools 2009 IEQp3: Minimum Acoustical Performance
136 Daniel Hicks
Daniel Hicks, E.I., INCE
Geiler & Associates
Thu, Dec 19, 2013
RE: Building reuse for parking deck?
in Healthcare-v2009: Building reuse - maintain existing walls, floors and roof
3 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Dec 19, 2013
RE: Previously developed?
in ND-v2009: Preferred locations
11 Michael DeVuono
Senior Staff Designer
T&M Associates
Thu, Dec 19, 2013
RE: Can A project Team Perform that credit
in Schools SSp2: Environmental Site Assessment
52 Larry Sims
Principal
Studio4, LLC
Tue, Dec 17, 2013
RE: LTc1. possible 18 points
in CI-v4: LEED for neighborhood development location
3 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Fri, Dec 13, 2013
I agree Tristan!
in Dear USGBC, Give Us Transparency on LEED Energy Data
4 Scott Bowman
Owner
Integrated Design + Energy Advisors, LLC
Fri, Dec 13, 2013
RE: Utility tariff - an accepted DR strategy?
in Data Centers-NC-v4: Demand response
2 Marcus Sheffer
LEED Fellow
7group
Fri, Dec 13, 2013
RE: Do Requirements Apply?
in Retail–NC-v2009: Low-emitting materials
3 Carly Ruggieri
Senior Sustainability Consultant
Steven Winter Associates, Inc.
Fri, Dec 6, 2013
RE: LEED Data Set - Energy Use Way Too High!
in Energy Star Score of 85 for 450 LEED Buildings in Biggest Data Release Yet
2 Michele Helou
Principal
Sage Design & Consulting
Thu, Dec 5, 2013
RE: Qualifying Third party certification examples?
in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes
8 Christine Robbins-Elrod
Studio Director
5G Studio Collaborative,llc.
Tue, Dec 3, 2013
RE: my experience
in LEED core + shell vs. new construction
8 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Tue, Dec 3, 2013
Title Comments Most Recent Post
RE: Construction EQ Management Plan
in Healthcare-v2009: Construction IAQ management plan - during construction
7 Bruce Maine
Sustainable Design Specifier
Retired
Tue, Sep 10, 2013
RE: Simpson Diversity Index score
in ND-v2009: Mixed-income diverse communities
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Wed, Sep 4, 2013
RE: Project Threshholds
in Pilot Credit 15: Parking Reduction
8 Devani PERERA
Green Building Consultant
ELAN
Mon, Sep 2, 2013
RE: outpatient exam rooms and consult rooms
in Healthcare-v2009: Controllability of systems - lighting
7 Kathy Wislocky
Project Manager
Isgenuity LLC
Thu, Aug 29, 2013
RE: Compliance documents upload
in ND-v2009: Recycled content in infrastructure
13 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Thu, Aug 29, 2013
RE: SEED evaluator tool
in ND-v2009: Community outreach and involvement
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Aug 26, 2013
RE: All Interior finishes qualify based on IEQ 4.1-4.4, still pursue
in Pilot Credit 21: Low-Emitting Interiors
45 Michael Lingerfelt
Fri, Aug 23, 2013
RE: Housing Densities and FAR
in ND-v2009: Compact development
3 Colin Day
Sustainable Building Associate, LEED GA
The Institute for the Built Environment
Wed, Aug 21, 2013
RE: Homers energy efficiency in Central America
in ND-v2009: Building energy efficiency
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Aug 19, 2013
RE: Metering faucet for Ktchen sink
in Retail–NC-v2009: Water use reduction
5 Richard Manning
Principal
Green Building Services
Tue, Aug 13, 2013
RE: Asbestos abatement for existing building renovation
in CS 2009 SSc3: Brownfield Redevelopment
8 Larry Sims
Principal
Studio4, LLC
Wed, Aug 7, 2013
RE: Proximity to farmers' market
in ND-v2009: Local food production
8 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, Sep 17, 2013
RE: Do bio-based inhibited glycols contribute to LEED certification?
in NC v2.2 MRc6: Rapidly Renewable Materials
25 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Aug 5, 2013
RE: Peak Discharge Rate
in Schools 2009 SSc6.1: Stormwater Design—Quantity Control
6 Nicole Ferrini
via T&M Associates
Fri, Aug 2, 2013
RE: Credit Requirements
in Pilot Credit 61: Material Disclosure and Assessment
8 Melissa Vernon
Director of Sustainable Strategy
Interface
Wed, Jul 31, 2013
RE: LEED ND - outside the US
in ND-v2009: Building water efficiency
5 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Jul 29, 2013
HVAC baseline model
in Retail–CI-v2009: Optimize energy performance - HVAC
1 Francesco Passerini
engineer
leedme.it
Wed, Jul 24, 2013
RE: Indoor AHUs and MERV 13 filters
in EBOM 2009 IEQc1.4: IAQ Best Management Practices—Reduce Particulates in Air Distribution
33 Mech Engineer
LEED AP BD+C
Mon, Jul 22, 2013
RE: SS7.2 question about form
in Schools 2009 SSc7.2: Heat Island Effect—Roof
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 15, 2013
RE: roof deck, roof
in NC v2.2 MRc1.1–1.2: Building Reuse
24 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Jul 11, 2013
Title Comments Most Recent Post
Mid-review clarification tab in new leedonline
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
573 jane kane
Wed, Sep 17, 2014
25 projects?
in Forum for LEED Volume Program Certification
8 April Rice
Sustainability Director
RDG Planning & Design
Mon, Sep 15, 2014
RE: NC 2009 or v4 Multifamily Midrise
in LEED Rating System Selection Q&A
608 Asa Foss
LEED for Homes Techincal Development
US Green Building Council
Fri, Sep 12, 2014
LEED for Healthcare: Lessons Learned - by Mara Baum
Wed, Sep 10, 2014
Discuss the LEED Dynamic Plaque - by Tristan Roberts
Wed, Sep 10, 2014
RE: Switching to LEED V4
in Got Technical Questions on LEED v4?
57 Jeslin Varghese
GBRI
Mon, Sep 8, 2014
Calculating FTE for a Dorm
in Calculating FTEs
186 Nena Elise
Mon, Sep 8, 2014
SSp1 in case of campus projects
in New LEED Guidance for Campuses and Multiple Buildings
496 Mónika Egyed
Fri, Sep 5, 2014
RE: LEED IEQ Cr5
in LEED Canada Forum
37 Peak Longhorn
Thu, Sep 4, 2014
LEED AP - Experience required
in Start a New LEED Discussion Topic
127 Rita Barata
Mon, Sep 1, 2014
RE: ACP Form
in International Projects - alternative compliance path
154 Sean Fish
Project Manager, LEED
U.S. Green Building Council
Wed, Aug 27, 2014
RE: A few comments...
in LEED v4 Public Comment Forum - LEED Takes a New Direction
98 Brian McCallister
Tue, Aug 26, 2014
Cannot upload after review comments
in Living with LEED Online - quirks, bugs and hiccups
136 Robert Wichert
Engineer
Fri, Aug 22, 2014
RE: CARB and ECO-Certified
in New Rules for Formaldehyde in IEQc4.4
7 Nick _
Architect, LEED AP
Wed, Aug 13, 2014
RE: Thanks Tristan!
in GBCI Invites Direct Inquiries—But Do Your Homework First
19 Megan Ritchie Saffitz
Director of LEED Support
U.S. Green Building Council
Mon, Aug 11, 2014
RE: LEED Interpretation: Effective Date
in Review Comments with Phantom Requirements
89 Hernando Miranda
Owner
Soltierra LLC
Fri, Aug 8, 2014
Defering Design credit
in Defer Credits
4 Stella Stella
Thu, Aug 7, 2014
RE: plaque presentation
in 17 critical—and misunderstood—LEED terms
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jul 31, 2014
RE: LEED AP BD+C V4
in Experience Requirement Loosened for LEED v4 AP Exam
12 Filipe Boni
Brain
Wed, Jul 23, 2014
RE: Project Registration Required
in A New, More Accessible LEED Online for LEED v4
10 Megan Sparks
Manager, Program Integration
U.S. Green Building Council
Wed, Jul 23, 2014
Title Votes Comments Most Recent Post
Laundry drain water
in Pilot Credit 10: Sustainable Wastewater Management
82 54 Wei Jiang
Fri, Jun 22, 2012
RE: PIEACP compliance path
in Schools IEQc4.3: Low-Emitting Materials—Flooring Systems
82 28 Lauren Sparandara
Sustainability Manager
Google
Mon, Jul 25, 2011
All weather pathways?
in Pilot Credit 9: Street Network
82 67 Cory Benson
Managing Director
Made Sustainable
Mon, Sep 27, 2010
leakage rate
in EBOM 2009 EAp3: Fundamental Refrigerant Management
82 63 Pablo Fortunato Suarez
Principal ESD Consultant/Architect
GreenArc Sustainable Building & Architecture
Sun, Aug 15, 2010
Off-site sorting and land clearing debris
in CS 2009 MRc2: Construction Waste Management
82 62 mark peternell
Tue, Sep 28, 2010
RE: fire dampers
in NC v2.2 MRc4: Recycled Content
82 148 Susan Walter
Sr Project Architect
Wilmot/Sanz
Tue, Jul 17, 2012
sample letter to subcontractors notifying them of LEED reqmts
in NC v2.2 MRc4: Recycled Content
82 148 kelly saunders
project engineer
57 builders ltd
Tue, Sep 25, 2012
SRECs
in NC v2.2 EAc2: On-Site Renewable Energy
82 43 Michelle Cottrell
President
Design Management Services
Thu, Aug 26, 2010
RE: SRECs
in NC v2.2 EAc2: On-Site Renewable Energy
82 43 Shillpa Singh
Senior Sustainability Manager
YR&G
Mon, Aug 30, 2010
LEED Interpretations
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
82 27 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Mon, Feb 28, 2011
RE: Where is the O+M 4th public comment draft?
in LEED 2012 - 4th Public Comment and Ballot Forum
82 191 Chrissy Macken
Assistant Project Manager, LEED v4
U.S. Green Building Council
Mon, Jun 11, 2012
RE: WEc2 Form
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
82 51 Paul C
Mon, Sep 20, 2010
Combined Stalls
in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
81 291 Curt Pascoe
P.E., LEED AP BD+C
Ryan Companies US, Inc.
Tue, Feb 7, 2012
RE: printer rooms in tenant scope of work
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
81 86 Susie Spivey-Tilson
Project Management Sustainability Services
CBRE
Mon, Aug 30, 2010
Negative Pressure Differential Requirement
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
81 86 Omar Katanani
Tue, Jun 21, 2011
RE: LEED EBOM 2009 EA Prerequisite 2 & Credit 1 - ACP
in International Projects - alternative compliance path
81 154 Eric Johnson
Principal Sustainability Project and Cost Manager
Green Future Now
Mon, Nov 14, 2011
In house audit
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
81 98 Ryan Tinus
Tishman Speyer
Tue, May 3, 2011
RE: leakage rate
in CS 2009 EAc4: Enhanced Refrigerant Management
81 42 Daniel LeBlanc
Senior Sustainability Manager
YR&G
Thu, Jun 2, 2011
Bio-based building materials - foam for use under concrete
in NC 2009 MRc6: Rapidly Renewable Materials
81 49 Charles Fritzemeier
Architect
Tetra Tech Architecture and Engineering, Inc.
Fri, Apr 13, 2012
RE: definition of "bus line" vs. "bus stop"
in CI 2009 SSc3.1: Alternative Transportation—Public Transportation Access
81 43 Simon S.
SL+A International, Taipei
Wed, Aug 25, 2010
Title Comments Most Recent Post
Help, please
in International Projects - alternative compliance path
154 Stefanie Hoffmann
HAAGA HELIA OY Ab
Wed, May 22, 2013
Street trees
in Pilot Credit 14: Walkable Streets
76 Roland Le Roux
Green Building Consultant
Wed, May 22, 2013
changing prerequisite completed forms
in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
9 Linda Francis
President
Francis Consulting
Sat, May 18, 2013
Room by Room flush-out Calculations
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
141 Lauren Sparandara
Sustainability Manager
Google
Thu, May 16, 2013
Municipal tertiary treated water transported in on tankers?
in NC 2009 WEc1: Water Efficient Landscaping
356 Natalie Tan
Thu, May 16, 2013
LEED vs Global Green vs The next rating system
in The Hidden Beltway Lobbyists Who Shape Green Building Policy
20 Wyan DeFilippo
LEED AP BD+C
Green Work Experience
Wed, May 15, 2013
Contact your senators!
in The Hidden Beltway Lobbyists Who Shape Green Building Policy
20 Michelle Robinson
Re:Vision Architecture
Wed, May 15, 2013
Pipe Corrosion Rates
in Pilot Credit 17: Cooling Tower Water Use
26 charles chaloeicheep
WSP
Tue, May 14, 2013
Water Efficient Landscaping
in NC 2009 WEc1: Water Efficient Landscaping
356 Sundararaj Subburaman
Director
Ecopro Design Consultancy Private Limited
Tue, May 14, 2013
PI Form 3 occupancy question, transient student vs retail
in PIf3: Occupant and Usage Data
187 Mike Stopka
Director of Sustainability
Solomon Cordwell Buenz
Mon, May 13, 2013
WEc1 Water Efficient Landscaping
in NC 2009 WEc1: Water Efficient Landscaping
356 Brian Kelly
Project Designer
UED
Fri, May 10, 2013
Calculating "Projection Factor" for curtainwall shading devices
in CS 2009 EAp2: Minimum Energy Performance
835 Amit Ahiel
Thu, May 9, 2013
LEED Signage for display inside Gold certified office building
in Start a New LEED Discussion Topic
127 Jeff Zunt
THORSON BAKER & Associates, Inc
Sun, May 5, 2013
Amendnment to existing Lease Agreement
in PIf5: Building System Control
10 Jay Murray
LEED Administrator
Commercial Construction Consulting
Wed, May 1, 2013
Pilot Credit 10
in Pilot Credit 10: Sustainable Wastewater Management
54 Alicia Silva
CEO
Revitaliza consultores
Tue, Apr 30, 2013
Cistern doesn't fulfull need, but there is no-potable backup
in NC 2009 WEc1: Water Efficient Landscaping
356 Sarah Picking
Tue, Apr 30, 2013
Questions
in Pilot Credit 10: Sustainable Wastewater Management
54 Lolita Wu
Sun, Apr 28, 2013
Pilot Credit 10
in Pilot Credit 10: Sustainable Wastewater Management
54 Alicia Silva
CEO
Revitaliza consultores
Fri, Apr 26, 2013
Average Pressure Differential Calculation - Underground Parking
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
86 Nathan Lee
Project Engineer
SGS Korea
Fri, Apr 26, 2013
Greywater recirculated
in NC 2009 WEp1: Water Use Reduction—20% Reduction
598 MM K
Thu, Apr 25, 2013

Copyright 2014 – BuildingGreen, Inc.