LEEDuser Forum

The following discussions are happening right now all around our LEED credit forums. If you don't find what you're looking for below, check our LEED credit menu or the list of hot discussion topics to the right.

Title Comments Most Recent Post Location
RE: Motorcycle parking spaces
in NC-v4: Reduced parking footprint
51 Dana Waters
Air Pollution Specialist
California Air Resources Board
Tue, Apr 18, 2017
RE: Which Standard to use?
in NC-2009 IEQp1: Minimum IAQ Performance
1,085 Andrew Mitchell, P.E.
Principal
Mitchell Gulledge Engineering, Inc.
Tue, Apr 18, 2017
Pressurization requirements in LEED v4
in NC-v4: Environmental tobacco smoke control
9 Judhajit Chakraborty
Building Performance Specialist
WSP Built Ecology
Tue, Apr 18, 2017
belated project registration / certification process feedback
in CS v4: Construction activity pollution prevention
3 Daniela Mendez
Civil Engineer
Tue, Apr 18, 2017
Mexico
Herbicides and Pesticides used during performance period
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
91 Joseph Snider, AIA, LEED Fellow
LEED Architect
SEQUIL Systems, Inc.
Tue, Apr 18, 2017
United States
RE: Blowout toilets in v4
in NC-v4: Indoor water use reduction
42 Ben Roush
Associate
FSi consulting engineers
Tue, Apr 18, 2017
United States
RE: Partitioned office space clarification
in WELL Building Standard Discussion Forum
66 Carina Clark
Interior Designer
HKS
Tue, Apr 18, 2017
Resources Links not working
in NC 2009 SSp1: Construction Activity Pollution Prevention
307 RYAN BEN SABILALA
Tue, Apr 18, 2017
RE: Projects in Europe
in Pilot Credit 102: Legal Wood
22 Jason Grant
Principal
Jason Grant Consulting
Mon, Apr 17, 2017
RE: Confidential space
in CI-v4: Must use reasonable LEED boundaries
7 David Posada
Integrated Design & LEED Specialist
SERA Architects
Mon, Apr 17, 2017
RE: change owner's represnetative name
in Required Signatories in LEED Online Forms
79 mostafa mohamed
Mon, Apr 17, 2017
Calibration
in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering
55 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Mon, Apr 17, 2017
Mexico
RE: Demolished and rebuilt envelope
in NC-v4: Minimum energy performance
183 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 17, 2017
RE: Definition of vegetated open space area
in NC 2009 SSc5.2: Site Development—Maximize Open Space
202 Allison Smith
Sustainable Design Coordinator
HKS Architects
Mon, Apr 17, 2017
RE: Catering Kitchen
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
378 Heather Holdridge
Sustainability Coordinator
Lake/Flato Architects
Mon, Apr 17, 2017
Project size extended in the middle of construction
in MPR4: Must comply with minimum floor area requirements
15 wachira sosaeng
Sat, Apr 15, 2017
Thailand
RE: Points in Addition to Renewable Energy Production?
in NC-v4: Optimize energy performance
41 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 14, 2017
RE: CFR and O&M Plan vs Systems Manual and OMM
in CI-v4: Fundamental commissioning and verification
12 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 14, 2017
Process Water
in Retail–NC-v2009: Water use reduction
6 Donald Green
Operations Manager
ai Design Group
Fri, Apr 14, 2017
RE: Residential applications
in NC-v4: Advanced energy metering
6 Marcus Sheffer
LEED Fellow
7group
Fri, Apr 14, 2017
Title Comments Most Recent Post Location
Herbicides and Pesticides used during performance period
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
91 Joseph Snider, AIA, LEED Fellow
LEED Architect
SEQUIL Systems, Inc.
Tue, Apr 18, 2017
United States
RE: Blowout toilets in v4
in NC-v4: Indoor water use reduction
42 Ben Roush
Associate
FSi consulting engineers
Tue, Apr 18, 2017
United States
Resources Links not working
in NC 2009 SSp1: Construction Activity Pollution Prevention
307 RYAN BEN SABILALA
Tue, Apr 18, 2017
RE: Projects in Europe
in Pilot Credit 102: Legal Wood
22 Jason Grant
Principal
Jason Grant Consulting
Mon, Apr 17, 2017
RE: Confidential space
in CI-v4: Must use reasonable LEED boundaries
7 David Posada
Integrated Design & LEED Specialist
SERA Architects
Mon, Apr 17, 2017
Calibration
in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering
55 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Mon, Apr 17, 2017
Mexico
RE: Demolished and rebuilt envelope
in NC-v4: Minimum energy performance
183 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 17, 2017
RE: Definition of vegetated open space area
in NC 2009 SSc5.2: Site Development—Maximize Open Space
202 Allison Smith
Sustainable Design Coordinator
HKS Architects
Mon, Apr 17, 2017
RE: Catering Kitchen
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
378 Heather Holdridge
Sustainability Coordinator
Lake/Flato Architects
Mon, Apr 17, 2017
Project size extended in the middle of construction
in MPR4: Must comply with minimum floor area requirements
15 wachira sosaeng
Sat, Apr 15, 2017
Thailand
RE: Points in Addition to Renewable Energy Production?
in NC-v4: Optimize energy performance
41 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 14, 2017
RE: CFR and O&M Plan vs Systems Manual and OMM
in CI-v4: Fundamental commissioning and verification
12 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 14, 2017
Process Water
in Retail–NC-v2009: Water use reduction
6 Donald Green
Operations Manager
ai Design Group
Fri, Apr 14, 2017
RE: Residential applications
in NC-v4: Advanced energy metering
6 Marcus Sheffer
LEED Fellow
7group
Fri, Apr 14, 2017
RE: Energy STAR appliances - what counts
in CI-v4: Optimize energy performance
20 emily reese
Sustainability Consultant
Jacobs
Thu, Apr 13, 2017
United States
RE: ENERGY STAR - only newly purchased eligible products?
in CI-v4: Minimum energy performance
22 emily reese
Sustainability Consultant
Jacobs
Thu, Apr 13, 2017
Project size extended in the middle of construction
in NC-v4: Must comply with project size requirements
21 wachira sosaeng
Thu, Apr 13, 2017
Thailand
>10% exemption possible?
in MPR2: Must be a complete, permanent building or space
2 Rasita Masalskyte
Ms
Vesta Consulting
Thu, Apr 13, 2017
Lithuania
RE: Innovation credit on cultural preservation
in NC 2009 IDc1: Innovation in Design
631 emily reese
Sustainability Consultant
Jacobs
Wed, Apr 12, 2017
RE: 1-floor renovation in an 2009 EBOM Certified Building
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
526 Kristina Bach
Sustainability Specialist
HGA Architects and Engineers
Wed, Apr 12, 2017
Title Comments Most Recent Post Location
LEED v4 rating systems being translated to Portuguese
in Portugal
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Mon, Oct 20, 2014
Portugal
Vista Users Out of Luck
in Living with LEED Online - quirks, bugs and hiccups
137 Cynthia Kaplan
Principal
cmk LEED
Thu, Apr 6, 2017
United States
RE: LEEDonline Form Access
in leedonline.com access - is it possible???
18 Cynthia Kaplan
Principal
cmk LEED
Thu, Apr 6, 2017
RE: Need for consistent numbering system across all rating systems
in Poll – Should LEED v4 Credits Have Numbers?
3 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Thu, Sep 25, 2014
Switzerland - by LEEDUser Team
Thu, Sep 18, 2014
Liechtenstein - by LEEDUser Team
Thu, Sep 18, 2014
Luxembourg - by LEEDUser Team
Thu, Sep 18, 2014
Monaco - by LEEDUser Team
Thu, Sep 18, 2014
Netherlands - by LEEDUser Team
Thu, Sep 18, 2014
San Marino - by LEEDUser Team
Thu, Sep 18, 2014
Serbia - by LEEDUser Team
Thu, Sep 18, 2014
Slovenia - by LEEDUser Team
Thu, Sep 18, 2014
Vatican City - by LEEDUser Team
Thu, Sep 18, 2014
U.S. and Canada - by LEEDUser Team
Thu, Sep 18, 2014
Canada - by LEEDUser Team
Thu, Sep 18, 2014
United States - by LEEDUser Team
Thu, Sep 18, 2014
Western Europe - by LEEDUser Team
Thu, Sep 18, 2014
Austria - by LEEDUser Team
Thu, Sep 18, 2014
Belgium - by LEEDUser Team
Thu, Sep 18, 2014
France - by LEEDUser Team
Thu, Sep 18, 2014
Title Comments Most Recent Post Location
Operable Windows
in CI-v4: Thermal comfort
3 Sondra Camis
Mon, Apr 3, 2017
United States
Combined Purchasing
in EBOM 2009 MRp1: Sustainable Purchasing Policy
40 Ryan Hoffman
Heapy Engineering
Mon, Apr 3, 2017
United States
Multi-use project
in Mid-Rise v4: Must use reasonable LEED boundaries
1 Vanessa Toralti
LEED consultant, architecture
AEdifica
Mon, Apr 3, 2017
Canada
RE: Innovation credit on cultural preservation
in NC 2009 IDc1: Innovation in Design
631 emily reese
Sustainability Consultant
Jacobs
Sun, Apr 2, 2017
municipality irrigation line
in CS v4: Outdoor water use reduction
1 Radwa Amin
LEED specialist
Hill International, Africa
Sat, Apr 1, 2017
Egypt
HIT-HY 200-R
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
553 Celimar Fournier
Project Engineer
Turner Construction
Fri, Mar 31, 2017
Temporary Irrigation with v6 Form
in NC 2009 WEc1: Water Efficient Landscaping
471 Michelle Rosenberger
Partner
ArchEcology, LLC
Fri, Mar 31, 2017
RE: Blowout toilets in v4
in NC-v4: Indoor water use reduction
42 Ben Roush
Associate
FSi consulting engineers
Fri, Mar 31, 2017
United States
RE: v4 Demand Response - typical peak load reduction "systems".
in NC-v4: Demand response
17 David Hubka
Director - Operations
Transwestern Sustainability Services
Thu, Mar 30, 2017
RE: v4 Demand Response - typical peak load reduction "systems".
in NC-v4: Demand response
17 David Hubka
Director - Operations
Transwestern Sustainability Services
Thu, Mar 30, 2017
RE: Gross area v. net area in PI Form 3 and IEQ8.1
in PIf3: Occupant and Usage Data
303 Summer Minchew
LEED AP ID+C, O+M
Ecoimpact Consulting
Thu, Mar 30, 2017
HIT-HY 200-R
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
553 Celimar Fournier
Project Engineer
Turner Construction
Wed, Mar 29, 2017
Campus Project
in Pilot Credit 14: Walkable Streets
147 Sara Curlee
Project Architect
BWBR
Wed, Mar 29, 2017
Residential Flush out Requirements
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
358 Rachel Manoguerra
LEED AP
3QC, Inc.
Wed, Mar 29, 2017
Combisteamer water use
in Schools 2009 WEc4: Process Water Use Reduction
70 Aneta Firląg
Wed, Mar 29, 2017
Exterior covered spaces
in Schools 2009 SSc7.1: Heat Island Effect—Nonroof
25 Aneta Firląg
Wed, Mar 29, 2017
Poland
Exterior lighting for group certification
in NC 2009 SSc8: Light Pollution Reduction
647 Mohamed M. Abd Elhameed
Managing Director
WECONSERVE LLC
Mon, Mar 27, 2017
Saudi Arabia
Customer Use of Restrooms
in Retail-CI-v4: Indoor water use reduction
7 John Doe
Les services exp
Mon, Mar 27, 2017
Canada
Stormwater Collected off-site & Reused inside the building
in NC-v4: Rainwater management
104 Charline Seytier
CEO, Co-owner. LEED AP BD+C
ThemaVerde, France
Mon, Mar 27, 2017
UL Product Lens - any USGBC issued acceptance/precedent?
in CI-v4: Building product disclosure and optimization - material ingredients
10 Joanna Switzer
Sustainability Project Manager
Atkins North America
Mon, Mar 27, 2017
United States
Title Comments Post date Most Recent Postsort icon Location
Project Experience for Cont. Ed.
in Q&A on LEED Credential Maintenance
49 Kasandra Martin
Designer
Fri, Apr 7, 2017
2017-04-07 09:33 United States
Qualifications for ID+C rating system
in CI-v4: Must use reasonable LEED boundaries
7 Mercedes Ferreira
Thu, Apr 6, 2017
2017-04-06 19:57 United States
Baseline system for hybrid service hot water system
in NC 2009 EAp2: Minimum Energy Performance
3,967 Vernon Smith
Principal Engineer
Smith Energy Engineers, LLC
Thu, Apr 6, 2017
2017-04-06 19:40 United States
Meeting room ID+C: CI certification
in CI-v4: Must comply with project size requirements
3 Carlos Echeverria
Architect
Studio Domus
Thu, Apr 6, 2017
2017-04-06 12:39 Guatemala
VOC budget calculation success for partially compliant category?
in NC-v4: Low emitting materials
319 Joanna Switzer
Sustainability Project Manager
Atkins North America
Thu, Apr 6, 2017
2017-04-06 11:21 United States
Building's equipment still uncertain
in NC-v4: Advanced energy metering
6 Maria Matos
Thu, Apr 6, 2017
2017-04-06 06:38 Portugal
Tab 6-1 and 6-4
in NC-v4: Minimum indoor air quality performance
71 R2M Solution Srl
R2M Solution Srl
Thu, Apr 6, 2017
2017-04-06 05:54 Italy
Meeting room ID+C: CI certification
in CI-v4: Must use reasonable LEED boundaries
7 Carlos Echeverria
Architect
Studio Domus
Wed, Apr 5, 2017
2017-04-05 20:38 Guatemala
Temporary potable connection to a permanent irrigation system
in Schools 2009 WEc1: Water Efficient Landscaping
31 Bradley Smith
Mithun
Wed, Apr 5, 2017
2017-04-05 17:42 United States
About Existing Building for Retail
in EBOM-v4: Minimum indoor air quality performance
14 Esteban Martinez
LEED Consultant
Green Loop
Wed, Apr 5, 2017
2017-04-05 13:13 Colombia
Concrete Regional and Recyle Content
in NC 2009 MRc5: Regional Materials
384 Rick Alfandre
Principal
Alfandre Architecture
Wed, Apr 5, 2017
2017-04-05 11:09 United States
MRc4 Recycled Content Calculation
in NC 2009 MRc4: Recycled Content
658 Jack Jennings
Wed, Apr 5, 2017
2017-04-05 10:33 United States
Reclaimed water use
in NC-v4: Outdoor water use reduction
28 Ann Runley Carroll
Partner
Brookwater, Inc.
Wed, Apr 5, 2017
2017-04-05 09:39 United States
Factory with a high unregulated energy loads- LEED EAp2
in NC 2009 EAp2: Minimum Energy Performance
3,967 Hanh Truong
Green Building Consultant
Artelia
Wed, Apr 5, 2017
2017-04-05 05:54 Vietnam
Electronic equipment
in CI 2009 MRc2: Construction Waste Management
77 Agata Mozer
GO4IT SP Z OO SP K
Wed, Apr 5, 2017
2017-04-05 05:01 Poland
Toilet Building meet MPR?
in NC-v4: Must comply with project size requirements
21 Harry Flamm
Project Architect and Sustainability Coordinator
Elkus Manfredi Architects
Tue, Apr 4, 2017
2017-04-04 17:38 United States
View Factor 3
in NC 2009 IEQc8.2: Daylight and Views—Views
448 James Bell
Senior Associate
Bohlin Cywinski Jackson
Tue, Apr 4, 2017
2017-04-04 16:15 United States
Reflectance
in NC-v4: Interior lighting
46 Inês Marques
Architect
Greenlab
Tue, Apr 4, 2017
2017-04-04 14:12 Portugal
Reflectance
in NC-v4: Daylight
58 Inês Marques
Architect
Greenlab
Tue, Apr 4, 2017
2017-04-04 14:04 Portugal
Connected underground car parks
in NC-v4: Reduced parking footprint
51 Florian Schmidtchen
EGS-plan International GmbH
Tue, Apr 4, 2017
2017-04-04 11:56 Germany

Copyright 2017 – BuildingGreen, Inc.