LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Separate CxA's for Fundamental and Enhanced Cx?
in NC-2009 EAc3: Enhanced Commissioning
268 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 24, 2015
RE: Pending commissioning completion
in NC-v4: Fundamental commissioning and verification
4 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 24, 2015
RE: Occupant Comfort Survey - draft from LEED User
in EBOM 2009 IEQc2.1: Occupant Comfort—Occupant Survey
57 Alana Fichman
Fri, Apr 24, 2015
RE: What is included in MR Credit 7
in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables
78 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 24, 2015
MR - Ongoing Purchasing and Waste Policy - Food waste (compost)
in LEED for Existing Multifamily Unveiled for Comment
1 Julien Lafond
Altanova, LLC
Fri, Apr 24, 2015
RE: Sports Practice Facility FTEs vs Transients
in Calculating FTEs
191 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, Apr 24, 2015
No LEED ND v4 RP credits on LEED website?
in ND-v4: Regional priority
1 Nate Tsang
Graduate Energy Engineer
Arup
Fri, Apr 24, 2015
Lebanon
Scope of the credit
in EBOM-2009: Sustainable purchasing - electric-powered equipment
1 Frantisek Macholda
Sustainability Consultant
EkoWATT
Fri, Apr 24, 2015
Czech Republic
Task Lights in Scope
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
317 Jonathan Weiss
Thu, Apr 23, 2015
United States
Option 2 "reduction below industry average"
in CI-v4: Building product disclosure and optimization - environmental product declarations
3 Jennifer Rinkus
Thu, Apr 23, 2015
United States
RE: brownfield confusion
in NC-v4: High priority site
2 Theresa Backhus
Sites Technical Specialist, LEED
USGBC
Thu, Apr 23, 2015
RE: 5-year lease + Letter of commitment for another 5 year extension
in CI 2009 MRc1.1: Tenant Space—Long-Term Commitment
38 William Weaver
Sustainability Practice Lead
JLL
Thu, Apr 23, 2015
CoC number not mentioned on Invoice
in NC 2009 MRc7: Certified Wood
434 Deepika Parmar
Ms
Thu, Apr 23, 2015
United Arab Emirates
RE: New Audit (outside performance period)
in EBOM 2009 IEQc3.2: Green Cleaning—Custodial Effectiveness Assessment
69 Michael Smithing
Director - Green Building Advisory
Colliers International
Thu, Apr 23, 2015
RE: Exterior walk-off mats permitted?
in NC-v4: Enhanced indoor air quality strategies
6 Ashwini Arun
Sustainability Coordinator
YR&G
Wed, Apr 22, 2015
RE: Open space definition
in NC 2009 SSc5.2: Site Development—Maximize Open Space
175 Ellen Mitchell
Director of Sustainability
HKS, Inc.
Wed, Apr 22, 2015
Incomplete Space within LEED-CI Multi-Use Building
in PIf1: Minimum Program Requirements
7 Sara Zoumbaris
Sustainable Design Consulting
Wed, Apr 22, 2015
United States
Option 1 - Reduction Combination?
in NC 2009 WEc1: Water Efficient Landscaping
387 Cindy Estrada
LEED AP BD&C
SDS Architects, Inc.
Wed, Apr 22, 2015
United States
RE: Street frontage and an urban setting
in Pilot Credit 14: Walkable Streets
88 Francis Chua
AIA, LEED AP BD+C
Project Architect at NK Architects
Wed, Apr 22, 2015
RE: Marketing materials + Retail items
in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables
102 Haley Duncan
Project Manager
Silver Oak Cellars
Wed, Apr 22, 2015
Title Comments Most Recent Post Location
Task Lights in Scope
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
317 Jonathan Weiss
Thu, Apr 23, 2015
United States
Option 2 "reduction below industry average"
in CI-v4: Building product disclosure and optimization - environmental product declarations
3 Jennifer Rinkus
Thu, Apr 23, 2015
United States
RE: brownfield confusion
in NC-v4: High priority site
2 Theresa Backhus
Sites Technical Specialist, LEED
USGBC
Thu, Apr 23, 2015
RE: 5-year lease + Letter of commitment for another 5 year extension
in CI 2009 MRc1.1: Tenant Space—Long-Term Commitment
38 William Weaver
Sustainability Practice Lead
JLL
Thu, Apr 23, 2015
CoC number not mentioned on Invoice
in NC 2009 MRc7: Certified Wood
434 Deepika Parmar
Ms
Thu, Apr 23, 2015
United Arab Emirates
RE: New Audit (outside performance period)
in EBOM 2009 IEQc3.2: Green Cleaning—Custodial Effectiveness Assessment
69 Michael Smithing
Director - Green Building Advisory
Colliers International
Thu, Apr 23, 2015
RE: Exterior walk-off mats permitted?
in NC-v4: Enhanced indoor air quality strategies
6 Ashwini Arun
Sustainability Coordinator
YR&G
Wed, Apr 22, 2015
RE: Open space definition
in NC 2009 SSc5.2: Site Development—Maximize Open Space
175 Ellen Mitchell
Director of Sustainability
HKS, Inc.
Wed, Apr 22, 2015
Incomplete Space within LEED-CI Multi-Use Building
in PIf1: Minimum Program Requirements
7 Sara Zoumbaris
Sustainable Design Consulting
Wed, Apr 22, 2015
United States
Option 1 - Reduction Combination?
in NC 2009 WEc1: Water Efficient Landscaping
387 Cindy Estrada
LEED AP BD&C
SDS Architects, Inc.
Wed, Apr 22, 2015
United States
RE: Street frontage and an urban setting
in Pilot Credit 14: Walkable Streets
88 Francis Chua
AIA, LEED AP BD+C
Project Architect at NK Architects
Wed, Apr 22, 2015
RE: Marketing materials + Retail items
in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables
102 Haley Duncan
Project Manager
Silver Oak Cellars
Wed, Apr 22, 2015
RE: Liquid hand soaps/body wash
in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
142 Barry Giles
Founder & CEO, LEED Fellow
BuildingWise LLC
Wed, Apr 22, 2015
RE: Reclamation Land
in ND-v2009: Wetland and water body conservation
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Wed, Apr 22, 2015
RE: Regularly occupied: traffic flow spaces in an open floor plan
in EBOM 2009 IEQc2.4: Daylight and Views
69 Jessica Hawley
Sustainability Consultant
EBI Consulting
Wed, Apr 22, 2015
compliance with IS 7730:2005
in NC-v4: Thermal comfort
5 Angelina Ten
Wed, Apr 22, 2015
RE: EA advanced Energy metering credit (LEED v4)
in NC-v4: Advanced energy metering
6 Marcus Sheffer
LEED Fellow
7group
Tue, Apr 21, 2015
Space flexibility
in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
181 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M
Revitaliza Consultores
Tue, Apr 21, 2015
RE: Reporting and metering frequency
in NC-v4: Water metering
2 Melissa Kelly
Sustainability Coordinator
YR&G
Tue, Apr 21, 2015
RE: VOC Budget - Shortcut?
in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings
95 Rick Farrell
Architect & Design Consultant
Woodwright Hardwood Floor Company
Tue, Apr 21, 2015
United States
Title Comments Most Recent Post Location
Slovenia - by LEEDUser Team
Thu, Sep 18, 2014
Vatican City - by LEEDUser Team
Thu, Sep 18, 2014
U.S. and Canada - by LEEDUser Team
Thu, Sep 18, 2014
Canada - by LEEDUser Team
Thu, Sep 18, 2014
United States - by LEEDUser Team
Thu, Sep 18, 2014
Western Europe - by LEEDUser Team
Thu, Sep 18, 2014
Austria - by LEEDUser Team
Thu, Sep 18, 2014
Belgium - by LEEDUser Team
Thu, Sep 18, 2014
France - by LEEDUser Team
Thu, Sep 18, 2014
Germany - by LEEDUser Team
Thu, Sep 18, 2014
Philippines - by LEEDUser Team
Thu, Sep 18, 2014
Singapore - by LEEDUser Team
Thu, Sep 18, 2014
Sri Lanka - by LEEDUser Team
Thu, Sep 18, 2014
Thailand - by LEEDUser Team
Thu, Sep 18, 2014
Timor-Leste - by LEEDUser Team
Thu, Sep 18, 2014
Vietnam - by LEEDUser Team
Thu, Sep 18, 2014
Southern Europe - by LEEDUser Team
Thu, Sep 18, 2014
Albania - by LEEDUser Team
Thu, Sep 18, 2014
Andorra - by LEEDUser Team
Thu, Sep 18, 2014
Bosnia and Herzegovina - by LEEDUser Team
Thu, Sep 18, 2014
Title Comments Most Recent Post Location
Reopening one path of LEED-CI SSc1.2 in Construction Review
in CI 2009 SSc1: Site Selection
215 Susan Di Giulio
Project Manager
Zinner Consultants
Sat, Apr 11, 2015
furniture in building reuse
in CI-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
64 Yaser Al Sharif
Sat, Apr 11, 2015
partial credit?
in CI-v4: Integrative process
2 Dana Piper
Architect
Allbee Romein
Fri, Apr 10, 2015
United States
RE: What if only 2 of 3 stairwells meet daylighting requirement?
in Pilot Credit 78: Design for active occupants
56 Kelly Pimmel
LEED BD+C
Christner Inc.
Thu, Apr 9, 2015
RE: SS Credit 7.1 - Calculating shade
in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
45 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Thu, Apr 9, 2015
Air Quality Testing - Elevator Lobbies in Parking Garage
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
274 Katherine Wilde
Edifice Rx
Thu, Apr 9, 2015
RE: VERTICALLY ATTACHED BUILDINGS
in New LEED Guidance for Campuses and Multiple Buildings
521 Vincent Dupuy
Eng., PA LEED BD+C
Cofely Services - GDF Suez
Thu, Apr 9, 2015
10 existing villas project
in LEED Rating System Selection Q&A
677 Adamantia Zisopoulou
Architect
Thu, Apr 9, 2015
United States
C&S 2009 Retail tenant space
in CS 2009 IEQc6: Controllability of Systems—Thermal Comfort
35 London Huenefeld
Wed, Apr 8, 2015
United States
RE: Area requirements
in NC-2009: Local food production
28 Noriko Yasuhara
Woonerf Inc.
Wed, Apr 8, 2015
Option 1. EPD Question
in NC-v4: Building product disclosure and optimization - environmental product declarations
16 Kai Starn
Sustainability Consultant
Steven Winter Associates
Tue, Apr 7, 2015
Dilution Systems for Multi-use building
in EBOM 2009 IEQc3.1: Green Cleaning—High Performance Cleaning Program
29 Haley Duncan
Project Manager
Silver Oak Cellars
Mon, Apr 6, 2015
Racks for visitors in residential project
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
251 LEED Consultant
Green Building and Alternative Energy
Mon, Apr 6, 2015
Facilities off-site alllowed but cannot be double counted
in NC-v4: Must use reasonable LEED boundaries
2 Nate Tsang
Graduate Energy Engineer
Arup
Mon, Apr 6, 2015
Third Party Data Source
in PIf1: Minimum Program Requirements
2 Erin Cubbison
Regional Sustainable Design Leader
Gensler
Mon, Apr 6, 2015
Integrative process
in Pilot Credit 60: Integrative Process
6 Habitech Distretto Tecnologico Trentino
LEED Services in Europe - Founding Member of GBC Italia
Habitech-Distretto Tecnologico Trentino
Fri, Apr 3, 2015
Can a hotel+residential tower achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
101 Juhi Jain
Project Consultant
Thornton Tomasetti / Sustainability
Thu, Apr 2, 2015
Using EQc4.5 as an ID credit.
in Schools IEQc4.5: Low-Emitting Materials—Furniture and Furnishings
15 Todd Reed
Daylight Designer
7group
Wed, Apr 1, 2015
RE: Bathtubs
in EBOM 2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
271 Trista Little
Sustainability Manager
YR&G
Tue, Mar 31, 2015
Campus road
in MPR3: Must use a reasonable site boundary
209 Susan Di Giulio
Project Manager
Zinner Consultants
Tue, Mar 31, 2015
Title Comments Post date Most Recent Postsort icon Location
recovered wood fiber
in NC 2009 MRc4: Recycled Content
548 Michele Helou
Principal
Sage Design & Consulting
Fri, Apr 17, 2015
2015-04-17 15:56 United States
Furniture - Piano and Ping Pong Table?
in NC-2009: Environmentally preferable interior finishes and furnishings
24 Lea McRoberts
Fri, Apr 17, 2015
2015-04-17 14:19 United States
Tenants Obliged to Share Data with USGBC?
in CS 2009 EAc5.2: Measurement and Verification—Tenant Submetering
91 Ian McCall
Environmental Engineer
Le Sommer Environnement
Fri, Apr 17, 2015
2015-04-17 10:53 France
FSC Wood COC
in NC 2009 MRc7: Certified Wood
434 Andy Prestridge
Project Engineer
R & O Construction Co.
Fri, Apr 17, 2015
2015-04-17 10:40 United States
Baseline heating set-point when no heating system exists
in NC 2009 EAp2: Minimum Energy Performance
2,806 Pedro Ribeiro
Director of Sustainability
Edifícios Saudáveis Consultores
Fri, Apr 17, 2015
2015-04-17 07:00 Portugal
Does restaurant dishwashers qualify as waste water?
in NC 2009 WEc2: Innovative Wastewater Technologies
117 Kristopher Lashley
INVIRO Engineered Systems Ltd.
Thu, Apr 16, 2015
2015-04-16 17:15 Canada
SSc8 Local Ordinance Requirements
in Schools 2009 SSc8: Light Pollution Reduction
62 Christopher Strunk
P.E.
Thu, Apr 16, 2015
2015-04-16 16:28 United States
Open Floor Plan with different Tvis Values
in NC 2009 IEQc8.1: Daylight and Views—Daylight
667 Marisa Picard
Thu, Apr 16, 2015
2015-04-16 13:31 United States
Fueling Capacity - multiple stations
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
379 Garrett Ferguson
ARCH I, LEED Green Associate
Perkins+Will
Thu, Apr 16, 2015
2015-04-16 11:58 United States
outdoor air flow monitoring location
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
57 Lily Li
Thu, Apr 16, 2015
2015-04-16 11:24 United States
Occupancy hours vs. Building Operating Plan
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
104 Jiri Dobias
Thu, Apr 16, 2015
2015-04-16 03:33 Serbia
100% diversion rate utilizing a waste audit
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
94 Samantha Longshore
Sustainability Advisor
Transwestern
Wed, Apr 15, 2015
2015-04-15 20:23 Australia
Leeds case study
in Start a New LEED Discussion Topic
186 Rudrabir Ghanti
Wed, Apr 15, 2015
2015-04-15 11:40 India
Can We Use Both Facility and Site Rates?
in NC 2009 MRc2: Construction Waste Management
371 Sara Zoumbaris
Sustainable Design Consulting
Wed, Apr 15, 2015
2015-04-15 10:08 United States
Prescriptive compliance
in CI-v4: Optimize energy performance
2 Michael Wahjudi
ESD Consultant
Kaer Pte Ltd
Wed, Apr 15, 2015
2015-04-15 05:29 Singapore
aerosol line saver (also posted in IEQc4.1)
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
440 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Tue, Apr 14, 2015
2015-04-14 19:07 United States
aerosol line saver
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
496 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Tue, Apr 14, 2015
2015-04-14 19:06 United States
On-site exercise facilities on a corporate campus
in Pilot Credit 78: Design for active occupants
56 Sara Curlee
BWBR
Tue, Apr 14, 2015
2015-04-14 15:38 United States
construction completion date is outside of performance period
in EBOM 2009 IEQc1.5: IAQ Best Management Practices—IAQ Management for Facility Alterations and Additions
39 Jessica Hawley
Sustainability Consultant
EBI Consulting
Tue, Apr 14, 2015
2015-04-14 14:15 United States
Does CI fit into BD+C?
in LEED Rating System Selection Q&A
677 Sara Greenwood
Green Building Consultant
Cadmus Group
Tue, Apr 14, 2015
2015-04-14 12:43 United States

Copyright 2015 – BuildingGreen, Inc.