LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
note about this forum
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: Addition Project Boundary remote from existing parking
in Schools-NC-v4: Must use reasonable LEED boundaries
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 6, 2014
RE: v4 Demand Response - No on-site Elec Generation
in NC-v4: Demand response
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 6, 2014
RE: CA 01350-compliant bambo flooring isn't NAUF
in Schools IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
23 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Apr 27, 2015
Data Center Energy Calculator Tool
in Data Centers-NC-v4: Optimize energy performance
3 Jack Jenkins
Consultant
rda|hurleypalmerflatt
Thu, Mar 6, 2014
The RPCs have been updated
in Non-U.S. Regional Priority Credits Added to LEED
26 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Mon, Mar 3, 2014
RE: Are filing cabinets included
in NC-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
25 Farah A.
Sat, Mar 1, 2014
RE: Historical Buildings with Protected Facades
in ND-v2009: Minimum building energy efficiency
6 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Fri, Feb 28, 2014
RE: Looking forward to your feedback
in Pilot Credit 12: Reduced Automobile Dependence
47 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 25, 2014
RE: Pilot Credits and LEED v4
in Pilot Credit 18: Appliance & Process Water Use Reduction
36 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 25, 2014
RE: Building with different uses
in MPR5: Must comply with minimum occupancy rates
16 Trista Little
Sustainability Manager
YR&G
Tue, Feb 25, 2014
RE: Calculating Walking Distances
in ND-v2009: Locations with reduced automobile dependence
18 Vita Shklovsky
Wed, Feb 19, 2014
RE: Number of cycles
in EBOM-v4: Cooling tower water use
4 Batya Metalitz
Technical Director, LEED
USGBC
Wed, Feb 19, 2014
RE: Possible Exemption?
in EBOM 2009 IEQc1.3: IAQ Best Management Practices—Increased Ventilation
10 Hannah Bronfman
Sustainability Consultant
YR&G
Mon, Feb 17, 2014
RE: Occupancy Sensors may be replaced
in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls
68 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Fri, Feb 14, 2014
RE: *sensationalism alert*!
in Does LEED v4 Ban PVC?
11 Paula Melton
Managing Editor
BuildingGreen, Inc.
Wed, Feb 26, 2014
RE: a LEED-NC V2.2 three-story mixed use building
in NC v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
54 Michelle Rosenberger
Partner
ArchEcology, LLC
Fri, Feb 13, 2015
Renovate an old school
in Schools-EBOM-v4: Must comply with project size requirements
1 Davide Filippi
Wed, Feb 12, 2014
RE: Commercial buildings?
in EBOM-v4: Environmental Tobacco Smoke Control
3 Jonathan Miller
Mon, Feb 10, 2014
What certifications are accepted by USGBC for v4 low-emissions?
in CI-v4: Low emitting materials
1 Randy Carter
Manager, Global Codes & Approvals
Steelcase Inc.
Wed, Apr 23, 2014
Title Comments Most Recent Post Location
RE: SEED evaluator tool
in ND-v2009: Community outreach and involvement
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Mon, Aug 26, 2013
RE: All Interior finishes qualify based on IEQ 4.1-4.4, still pursue
in Pilot Credit 21: Low-Emitting Interiors
45 Michael Lingerfelt
Fri, Aug 23, 2013
RE: Housing Densities and FAR
in ND-v2009: Compact development
3 Colin Day
Sustainable Building Associate, LEED GA
The Institute for the Built Environment
Wed, Aug 21, 2013
RE: Metering faucet for Ktchen sink
in Retail–NC-v2009: Water use reduction
5 Richard Manning
Principal
Green Building Services
Tue, Aug 13, 2013
RE: Asbestos abatement for existing building renovation
in CS 2009 SSc3: Brownfield Redevelopment
8 Larry Sims
Principal
Studio4, LLC
Wed, Aug 7, 2013
RE: Proximity to farmers' market
in ND-v2009: Local food production
8 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Sep 17, 2013
RE: Do bio-based inhibited glycols contribute to LEED certification?
in NC v2.2 MRc6: Rapidly Renewable Materials
25 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Aug 5, 2013
RE: Peak Discharge Rate
in Schools 2009 SSc6.1: Stormwater Design—Quantity Control
6 Nicole Ferrini
via T&M Associates
Fri, Aug 2, 2013
RE: Credit Requirements
in Pilot Credit 61: Material Disclosure and Assessment
8 Melissa Vernon
Consultant
Wed, Jul 31, 2013
RE: LEED ND - outside the US
in ND-v2009: Building water efficiency
5 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Mon, Jul 29, 2013
HVAC baseline model
in Retail–CI-v2009: Optimize energy performance - HVAC
1 Francesco Passerini
engineer
Wed, Jul 24, 2013
RE: roof deck, roof
in NC v2.2 MRc1.1–1.2: Building Reuse
24 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Jul 11, 2013
RE: Crushed Concrete used
in CS 2009 MRc3: Materials Reuse
16 RIM Architects
RIM Architects
Mon, Jul 8, 2013
RE: Retrofit
in Healthcare-v2009: Hazardous material removal or encapsulation (renovations only)
5 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, Jun 26, 2013
RE: Systems Required in Cx Scope
in Schools-2009 EAp1: Fundamental Commissioning of Building Energy Systems
7 John Glaeser
Fri, Dec 20, 2013
RE: Upper and lower roof
in Healthcare-v2009: Heat island effect - roof
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 31, 2013
RE: Number of testing point
in Healthcare-v2009: Construction IAQ management plan - before occupancy
6 Emil Andersson
Green Certification Coordinator
Skanska Sweden
Fri, May 31, 2013
RE: Pilot credit
in ND-v2009: Innovation and exemplary performance
2 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Thu, May 30, 2013
RE: Regional Credits in Canada?
in Healthcare-v2009: Regional priority
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 3, 2013
RE: Clarifications
in Healthcare-v2009: Construction activity pollution prevention
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Apr 22, 2013
Title Comments Most Recent Post Location
Check MPRs
in LEED Boundary
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
LEED rating system selection policy - schools
in LEED Schools
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
narrow it down
in Leed Consultant Contract
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jun 24, 2010
If we assume there's no
in Major Renovation - Minimum Program Requirements
1 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Thu, Jun 24, 2010
RE: FTE
in Calculating FTEs for a Lobby
8 Shannon Gray
Consultant
YRG sustainability
Wed, Jun 23, 2010
LEED 2009 - Major Renovation of Metal Bldg: Recycle, Reuse, Regional Issues - by Sara LeMone
Wed, Jun 30, 2010
post to EQc8.1 forum
in Daylighting calculation for open areas
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Jun 20, 2010
SSc4.2 Bicycle path minimum width (LEED for Schools) - by Jorge Arismendi
Fri, Jun 18, 2010
RE: Scope of work
in Determining the best rating system for a project
4 Amanda Roelle
Architect
Thu, Jun 17, 2010
RE: alternative path with signatories
in Initials on LEED Credit Forms
2 Leo van Veldhuizen
Outback Building Design
Thu, Jun 17, 2010
RE: Project eligibility
in Implementing LEED NC on a project that has commenced construction
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 14, 2010
Alternative Documentation Paths
in Owner Signatories
1 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
LEED Online troubles
in Credits that were complete are no longer on LEED Online
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
RE: Smaller projects
in MAN-HOUR
5 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Tue, Jun 8, 2010
LEED-NC Application Guide for Multiple Buildings & On-Campus Bu
in 1 Site ... 2 Projects
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 8, 2010
RE: "Passed in 2006 or before and not appearing in LEED AP Directory
in LEED AP for 6 years - but NOT on LEED Online
2 Brian Kaplan
Associate
STUDIOS architecture
Fri, Jun 4, 2010
RE: Which version
in Changing Authorization Levels
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jun 4, 2010
No spreadsheet...
in Accepted local codes and standards in other countries (Sweden)
1 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Thu, Jun 3, 2010
RE: Performance period management
in Shortest Possible Performance Period
2 Jenny Carney
Principal
YR&G
Tue, Jun 1, 2010
Post to credit
in DAYSIM 3.0
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 1, 2010
Title Comments Most Recent Post Location
Clarification
in CI-v4: Quality views
1 Charles Gatins
Tue, Jun 17, 2014
Certify only a few stories
in MPR3: Must use a reasonable site boundary
6 Citlali Mora Bello
Arq.
Grupo Base
Tue, Jun 17, 2014
green cleaning
in CS 2009 IDc1: Innovation in Design
51 Alfonzo Collins
Tue, Jun 17, 2014
United States
USGBC management shake up
in Start a New LEED Discussion Topic
192 Bill Swanson
PE, LEED AP
Integrated Architecture
Mon, Jun 16, 2014
Testing with multiple systems in one space
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
285 Nate Steeber
Project Manager, Sustainability
Sol design + consulting
Fri, Jun 13, 2014
United States
Is this Pilot credit closed?
in Pilot Credit 10: Sustainable Wastewater Management
59 Stella Stella
Thu, Jun 12, 2014
copy paste
in Retail-CI-v4: Reduced parking footprint
1 manuel de jesus gonzalez duron
civil engineer
SYASA
Wed, Jun 11, 2014
USGBC management shake up
in Start a New LEED Discussion Topic
192 Bill Swanson
PE, LEED AP
Integrated Architecture
Tue, Jun 10, 2014
Prefered Parking Requirement
in Healthcare-v2009: Alternative transportation - parking capacity
1 Todd Bundren
Director of Sustainabilty - Architectural Project Manager
Lawrence Group
Tue, Jun 10, 2014
green cleaning
in CS 2009 IDc1: Innovation in Design
51 Alfonzo Collins
Tue, Jun 10, 2014
United States
Hot Humid, Multi Family Compliance
in Mid-Rise v4: Ventilation
1 Jason Biondi
Managing Director
Energy Cost Solutions Group
Mon, Jun 9, 2014
Marking credits as Complete
in Registering Projects
17 kelly ryan
Mon, Jun 9, 2014
RE: Street frontage and an urban setting
in Pilot Credit 14: Walkable Streets
95 Jaspreet Pahwa
Mon, Jun 9, 2014
Natural or mechanical ventilation for Split Units
in NC v2.2 EQp1: Minimum IAQ Performance
61 Nandana Kumar
LEAD Consultancy & Engineering Services
Fri, Jun 6, 2014
India
RE: Appeal Design Credits After Construction Review has begun?
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
699 Garrett Ferguson
ARCH I, LEED Green Associate
Perkins+Will
Thu, Jun 5, 2014
RE: cardboard and paper
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
96 Kimberly Schlaepfer
Sustainability Coordinator LEED AP O+M
YR&G
Wed, Jun 4, 2014
Option1 Electric Vehicle Charging vs. Option2 Liquid/Gas/Battery
in NC-2009: Green vehicles
14 Maggie Pipek
Wed, Jun 4, 2014
RE: LEED for Homes MidRise and Commercial Condo Space
in LEED for Homes (LEED-H) Forum
144 Maureen Mahle
Program Manager, LEED for Homes
Steven Winter Associates, Inc.
Wed, Jun 4, 2014
Reclaim land for more than 40 years
in NC-v4: Must be in a permanent location on existing land
10 Michael Wahjudi
ESD Consultant
Kaer Pte Ltd
Tue, Jun 3, 2014
Singapore
Commissioning with Volume Build Projects
in Retail-CI-v4: Fundamental commissioning and verification
1 Robin Dukelow, LEED AP BD+C
Sustainability Consultant; Project Manager
Henderson Engineers, Inc.; Sustainable Design Consulting, LLC
Mon, Jun 2, 2014
Title Comments Post date Most Recent Postsort icon Location
Pilot Credit 71: EA – Performance of ENERGY STAR for Homes
in Homes-v2008: Performance of ENERGY STAR for Homes
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
2015-01-19 16:04 United States
Pilot Credit 47: EQ – Acoustic Comfort
in Homes-v2008: Acoustic comfort
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
2015-01-19 15:59 United States
MRpc34 Design for Adaptability
in Homes-v2008: Design for adaptability
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
2015-01-19 15:51 United States
Autocontrol vs smart sensor-activated faucets and duration times
in NC-v4: Indoor water use reduction
17 Heather DeGrella
Sustainability Coordinator
Opsis Architecture
Mon, Jan 19, 2015
2015-01-19 14:21 United States
Coat area - regularly occupied?
in NC 2009 IEQc8.2: Daylight and Views—Views
416 Eric White
Mon, Jan 19, 2015
2015-01-19 13:11 Canada
shuttle buses
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
215 Weidong Luo
Ecotech International
Mon, Jan 19, 2015
2015-01-19 12:28 China
Can we write up this plan and use it as the basis for our EBOM?
in Pilot Credit 64: Site Improvement Plan
2 Katherine Carlin
Fri, Jan 16, 2015
2015-01-16 14:56 United States
Steel Extraction Location - Manufacturer Claim
in NC 2009 MRc5: Regional Materials
301 Sara Zoumbaris
Sustainable Design Consulting
Fri, Jan 16, 2015
2015-01-16 14:33 United States
Fire Station FTE
in PIf3: Occupant and Usage Data
230 Deborah Morgan
Fri, Jan 16, 2015
2015-01-16 11:07 United States
LEED Project Boundary for Renovation Projects
in PIf1: Minimum Program Requirements
124 Nicholas Klever
Intern Architect
Bailey Edward Architecture
Fri, Jan 16, 2015
2015-01-16 11:00 United States
Subtraction of utility's renewable energy sources from RECs?
in NC 2009 EAc6: Green Power
169 Erica Downs
Sustainability & LEED Consultant
Thu, Jan 15, 2015
2015-01-15 18:27 United States
following v4 requirements?
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
94 Erica Downs
Sustainability & LEED Consultant
Thu, Jan 15, 2015
2015-01-15 17:08 United States
Innovation point for NCv3?
in NC-v4: Building life-cycle impact reduction
23 Erica Downs
Sustainability & LEED Consultant
Thu, Jan 15, 2015
2015-01-15 17:04 United States
Complex projects benefit from turn-key waste mgmt services
in NC-2009: Construction and demolition waste management
11 Joanna Switzer
Thu, Jan 15, 2015
2015-01-15 14:58 United States
GRI Sustainability Reports
in Pilot Credit 53: Responsible Sourcing of Raw Materials
6 Christine Robbins-Elrod
Studio Director
5G Studio Collaborative,llc.
Thu, Jan 15, 2015
2015-01-15 14:04 United States
Certifying an addition to an existing building with LEED NC
in PIf1: Minimum Program Requirements
124 Veronica Reed
Founder
SDSARCH CIA. LTDA.
Thu, Jan 15, 2015
2015-01-15 11:48 Ecuador
No longer required to complete Design prereqs before review?
in NC 2009 EAp2: Minimum Energy Performance
2,982 Susan Di Giulio
Project Manager
Zinner Consultants
Wed, Jan 14, 2015
2015-01-14 23:32 United States
LEED O&M on a portion of a building
in EBOM-v4: Must comply with project size requirements
4 LEED Consultant
Green Building and Alternative Energy
Wed, Jan 14, 2015
2015-01-14 20:12 Mexico
PIf2
in PIf2: Project Summary Details
196 Shaun Andriano
Project Manager
C2 Design Architecture
Wed, Jan 14, 2015
2015-01-14 17:12 United States
low emitting materials calculator
in NC-v4: Low emitting materials
111 CAROLINE PIN
In charge of environmental certification on a jobsite
EIFFAGE CONSTRUCTION
Wed, Jan 14, 2015
2015-01-14 14:30 France

Copyright 2015 – BuildingGreen, Inc.