LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Innovation Award
in Announcing the LEEDuser Innovation Award
4 Neil Rosen
Director of Sustainability
Northwell Health
Mon, Oct 12, 2015
United States
Feasibility
in CS-2009: Material ingredient optimization
1 Chloe Bendistis
Sustainability Project Manager
The Sheward Partnership, LLC
Mon, Oct 12, 2015
Certify some of multiple fitout floor
in MPR2: Must be a complete, permanent building or space
9 sompoche sirichote
Mon, Oct 5, 2015
Thailand
RE: LEED v4 BD+C - Core and Shell : Renewable energy production
in CS v4: Renewable energy production
4 Marcus Sheffer
LEED Fellow
7group
Wed, Sep 30, 2015
RE: Storage Room between Classrooms
in Schools 2009 IEQc9: Enhanced Acoustical Performance
36 Daniel Hicks
Daniel Hicks, E.I., INCE
Geiler & Associates
Wed, Sep 30, 2015
RE: Does the 5 days/week requirement apply for the project duration?
in NC-2009: Green training for contractors, trades, operators and service workers
15 Trista Little
Sustainability Manager
YR&G
Mon, Sep 21, 2015
What if we are not using comingled recycling?
in Schools-2009: Verified Construction & Demolition Recycling Rates
1 Cynthia Kaplan
Principal
cmk LEED
Mon, Sep 21, 2015
United States
RE: Congrats Paula!
in Why I’m About to Fail the New, Harder LEED v4 AP Exam
10 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Mon, Sep 21, 2015
RE: Do parking garages need to be included in the LEED project?
in LEED Certifications for Parking Garages No Longer Allowed
16 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Wed, Sep 16, 2015
Determining site area on multi building lot
in Locating 2-year, 24-hour rainfall intensity values for EBOM SSc6
9 Phil Vanderloo
President
Hiline Builders Inc.
Sun, Sep 13, 2015
United States
RE: Certification Process for a Green Cleaning Product
in EBOM-v4: Green cleaning policy
8 Candace Pearson
Research Associate
LEEDuser, BuildingGreen Inc.
Fri, Sep 11, 2015
RE: 100% Outside Air systems
in CI 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
27 Dylan Connelly
Mechanical Engineer
Integral Group
Thu, Sep 10, 2015
Map generation for submittals
in Mid-Rise v4: Site selection
1 Phil Vanderloo
President
Hiline Builders Inc.
Sun, Sep 6, 2015
RE: LEED credit achievement
in Credit Achievement Tally
2 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional
JLL
Fri, Sep 4, 2015
RE: MRc4 vs MRc7
in Healthcare-v4: Furniture and medical furnishings
4 Candace Pearson
Research Associate
LEEDuser, BuildingGreen Inc.
Tue, Sep 1, 2015
RE: Transit Service Tables
in PIf3: Project Location and Base Mapping
7 Michael Smithing
Director - Green Building Advisory
Colliers International
Mon, Aug 31, 2015
RE: Water meter broke down during performance period
in EBOM 2009 WEc1: Water Performance Measurement
81 Michael Smithing
Director - Green Building Advisory
Colliers International
Wed, Aug 26, 2015
O+M Starter Kit - Green Cleaning/Site Management
in NC-2009: Indoor air quality procedure - alternative compliance path
3 Kelsey Jensen
Wed, Aug 26, 2015
RE: a one-family House can be LEED EBOM?
in PIf2: Project Summary Details
4 Barry Giles
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
Thu, Mar 17, 2016
RE: Brownfield site
in Hospitality-NC-v4: High priority site
2 Candace Pearson
Research Associate
LEEDuser, BuildingGreen Inc.
Mon, Aug 24, 2015
Title Comments Most Recent Post Location
RE: Equipment which uses NO water
in Healthcare-v2009: Water use reduction - food waste systems
7 Suzanne Painter-Supplee, LEED AP+ID&C
Principal
SEESolutions LLC
Wed, Mar 18, 2015
RE: Help test the Pilot Credits!
in Pilot Credit 35: Environmental Tobacco Smoke
2 Gary Hansen
Sun, Mar 8, 2015
PIlot Credit Reboot
in No Environmental Tobacco Smoke
1 Gary Hansen
Sun, Mar 8, 2015
RE: Pilot Credit 30: No new parking
in Pilot Credit 30: Alternative Transportation
10 Gary Hansen
Sun, Mar 8, 2015
RE: LI ID #10001 (asbestos for SSc3) applicable to LEED-NC v2.2?
in NC v2.2 SSc3: Brownfield Redevelopment
10 Michelle Reott
LEED AP® BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC, a LEED® Proven Provider™
Tue, Mar 22, 2016
RE: Guidance on calculations with multiple inputs
in Schools 2009 MRc4: Recycled Content
28 Esther Kohout
Kohout Woodwork, Inc
Fri, Feb 12, 2016
United States
RE: LEED HC 2009 ID P1 and c3
in Healthcare-v2009: Integrated project planning and design
3 Susan Walter
Specifications Director
Populous
Thu, Feb 12, 2015
RE: Roofing products and adhesives.
in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
148 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Tue, Mar 22, 2016
RE: Structurally Independent Garage - which credits to consider?
in Healthcare-v2009: Heat island effect - nonroof
4 Susan Walter
Specifications Director
Populous
Thu, Jan 29, 2015
RE: MR Credit 3 & 4 form
in NC v2.2 MRc3: Materials Reuse
43 Susie Spivey-Tilson
Senior Program Manager, Global Energy & Sustainability
CBRE
Tue, Mar 22, 2016
Site Management Policy
in NC-2009: LEED O+M Starter Kit
1 Kelsey Jensen
Mon, Jan 26, 2015
United States
RE: Can we write up this plan and use it as the basis for our EBOM?
in Pilot Credit 64: Site Improvement Plan
2 Trista Little
Sustainability Manager
YR&G
Sun, Jan 25, 2015
require future tenant?
in MPR6: Must commit to sharing whole-building energy and water usage data
1 Courtney Royal, LEED AP BD+C
Sr. Sustainability Consultant
Taitem Engineering
Wed, Jan 21, 2015
Pilot Credit 74: EQ – No environmental tobacco smoke
in Homes-v2008: No environmental tobacco smoke
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
United States
Pilot Credit 71: EA – Performance of ENERGY STAR for Homes
in Homes-v2008: Performance of ENERGY STAR for Homes
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
United States
Pilot Credit 47: EQ – Acoustic Comfort
in Homes-v2008: Acoustic comfort
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
United States
MRpc34 Design for Adaptability
in Homes-v2008: Design for adaptability
1 Jonathan Lindstrom
Project Manager
Kramer Marks Architects
Mon, Jan 19, 2015
United States
LEED O&M on a portion of a building
in EBOM-v4: Must comply with project size requirements
4 LEED Pro Consultant
Bioconstruccion & Energia Alternativa
Wed, Jan 14, 2015
Mexico
Metered energy data
in EBOM-v4: Optimize energy performance
1 LEED Pro Consultant
Bioconstruccion & Energia Alternativa
Wed, Jan 14, 2015
IAQ Assessment - Air Testing
in CI-v4: Indoor air quality assessment
1 Harvard University Green Building Services
Tue, Jan 13, 2015
United States
Title Comments Most Recent Post Location
check with GBCI
in Vertically Attached Building
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 12, 2010
work under IDc1
in Construction Waste Management
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 12, 2010
LEED Online roles
in project team administration
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 12, 2010
post to EAp2 or EAc1 forum
in innovation in design credit for reduction in peak energy load
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 12, 2010
see LEED CMP webinar
in CE Hours
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 12, 2010
RE: No hard deadline
in Qualifying Period for LEED certification
2 Grace Ming
Senior ESD Consultant
Tue, Jul 6, 2010
U values and ci for Climate Zone 2
in U values and ci for Climate Zone 2 - This is a tropical country!
1 Christopher Schaffner
Principal & Founder
The Green Engineer, Inc.
Fri, Jul 2, 2010
Check MPRs
in LEED Boundary
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
LEED rating system selection policy - schools
in LEED Schools
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
narrow it down
in Leed Consultant Contract
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jun 24, 2010
If we assume there's no
in Major Renovation - Minimum Program Requirements
1 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Thu, Jun 24, 2010
RE: FTE
in Calculating FTEs for a Lobby
8 Shannon Gray
Consultant
YRG sustainability
Wed, Jun 23, 2010
LEED 2009 - Major Renovation of Metal Bldg: Recycle, Reuse, Regional Issues - by Sara LeMone
Wed, Jun 30, 2010
post to EQc8.1 forum
in Daylighting calculation for open areas
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Jun 20, 2010
SSc4.2 Bicycle path minimum width (LEED for Schools) - by Jorge Arismendi
Fri, Jun 18, 2010
RE: Scope of work
in Determining the best rating system for a project
4 Amanda Roelle
Architect
Thu, Jun 17, 2010
RE: alternative path with signatories
in Initials on LEED Credit Forms
2 Leo van Veldhuizen
Outback Building Design
Thu, Jun 17, 2010
RE: Project eligibility
in Implementing LEED NC on a project that has commenced construction
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 14, 2010
Alternative Documentation Paths
in Owner Signatories
1 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
LEED Online troubles
in Credits that were complete are no longer on LEED Online
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
Title Comments Most Recent Post Location
RE: Separation between patient and staff places of respite
in Healthcare-v2009: Connection to the natural world - places of respite
27 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Mon, Jul 20, 2015
EPR Example
in NC-v4: Building product disclosure and optimization - sourcing of raw materials
85 Jenelle Shapiro
Sr. Sustainability Manager
Webcor Builders
Sun, Jul 19, 2015
RE: SSc2 - Can on-campus uses apply towards "basic services"?
in NC 2009 SSc2: Development Density and Community Connectivity
295 Allison Smith
Sat, Jul 18, 2015
The correct/latest 62MZ & LEED min. IAQ spreadsheet?
in NC-2009 IEQp1: Minimum IAQ Performance
1,056 Aru Sau
Fri, Jul 17, 2015
United States
RE: LEED Dynamic Plaque vs EB Recertification
in LEED for Existing Buildings Recertification Is Here
15 Bharati Karmarkar Bhosale
Operations Manager
Healthy Buildings
Sun, Jul 12, 2015
LEED V4 - TENANT SPACE ENERGY MODELING
in Retail-CI-v4: Minimum energy performance
5 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Fri, Jul 10, 2015
Existing parking lot, new LEED space
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
136 Susan Reid
Architect
Interwork Architects
Fri, Jul 10, 2015
United States
RE: Manufacturer Inventory
in NC-v4: Building product disclosure and optimization - material ingredients
42 Jason Grant
Principal
Jason Grant Consulting
Thu, Jul 9, 2015
EPR Example
in NC-v4: Building product disclosure and optimization - sourcing of raw materials
85 Jenelle Shapiro
Sr. Sustainability Manager
Webcor Builders
Thu, Jul 9, 2015
RE: Industry Wide EPD with slightly different product listed
in NC-v4: Building product disclosure and optimization - environmental product declarations
87 Leanne Conrad
Project Coordinator
Maple Reinders Constructors
Thu, Jul 9, 2015
Re-Appeal for a data center
in Review Appeal
38 Ed Healy
ESD Consultant, LEED AP BD+C
Hurley Palmer Flatt
Wed, Jul 8, 2015
our discussion forums
in Start a New LEED Discussion Topic
217 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jul 7, 2015
RE: CI for Hospital;
in CI 2009 SSc3.1: Alternative Transportation—Public Transportation Access
56 Ajay Kumar
Mon, Jul 6, 2015
India
Open Plan office served by 4 AHUs
in CI-2009 IEQp1: Minimum IAQ Performance
160 Michael Wahjudi
ESD Consultant
Kaer Pte Ltd
Fri, Jul 3, 2015
Singapore
RE: EApc95 - Alternative Energy Performance Metric questions
in NC 2009 EAc1: Optimize Energy Performance
1,311 Jamy Bacchus
Wed, Jul 1, 2015
United States
RE: Intumescent Paint and General Emission Evaluation requirements
in NC-v4: Low emitting materials
247 Leanne Conrad
Project Coordinator
Maple Reinders Constructors
Wed, Jul 1, 2015
RE: Green Educational Program Format
in CS 2009 IDc1: Innovation in Design
64 Trista Little
Sustainability Manager
YR&G
Wed, Jul 1, 2015
please post to more specific forums
in PIf1: Minimum Program Requirements
15 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 30, 2015
RE: Definition of Landfill
in NC 2009 MRc2: Construction Waste Management
476 Michelle Reott
LEED AP® BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC, a LEED® Proven Provider™
Tue, Jun 30, 2015
Meter for Water Use in Laundry
in Healthcare-v2009: Water use reduction - measurement and verification
13 Jon Penndorf
Mon, Jun 29, 2015
United States
Title Comments Post date Most Recent Postsort icon Location
WE Credit 4 requirement question
in Healthcare-v4: Water metering
1 Naten Maniktala
M.E. GROUP
Mon, Jun 13, 2016
2016-06-13 10:23 United States
% of Glazing & Floor Area Base Case vs Project
in CS 2009 EAp2: Minimum Energy Performance
1,135 Dana Guzman
Fri, Jun 10, 2016
2016-06-10 22:36 Mexico
Water Usage for parks and open spaces
in CS 2009 WEp1: Water Use Reduction—20% Reduction
224 deborah lucking
associate
fentress architects
Fri, Jun 10, 2016
2016-06-10 13:11 United States
Trouble finding comparable projects for recycling rates
in CS 2009 MRp1: Storage and Collection of Recyclables
56 Jason Happe
Director of Energy & Sustainability
EBI Consulting
Fri, Jun 10, 2016
2016-06-10 13:04 United States
Getting Started
in NC-v4: Building life-cycle impact reduction
86 Mike Workman
Fri, Jun 10, 2016
2016-06-10 12:07 United States
searching out no voc floor sheathing and mdf
in NC 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
230 Phil Vanderloo
President
Hiline Builders Inc.
Fri, Jun 10, 2016
2016-06-10 12:01 United States
C&S or NC ?
in LEED Rating System Selection Q&A
803 Claire PIMET
S'pace environnement
Fri, Jun 10, 2016
2016-06-10 09:44 France
revolving doors and side entrances
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
117 Agata Mozer
GO4IT SP Z OO SP K
Fri, Jun 10, 2016
2016-06-10 07:51 Poland
System 4 for Data Center
in NC 2009 EAp2: Minimum Energy Performance
3,822 Ameet AA
Fri, Jun 10, 2016
2016-06-10 00:41 New Zealand
Project Building Context - Residence Hall New Jersey
in PIf2: Project Summary Details
252 Anna Lapomme
Sustainability Consulting
Thu, Jun 9, 2016
2016-06-09 15:41 United States
Project Building Activity - Residence Hall
in PIf3: Occupant and Usage Data
290 Anna Lapomme
Sustainability Consulting
Thu, Jun 9, 2016
2016-06-09 15:31 United States
Leed Footprint exceeds leed Boundary
in NC 2009 SSc5.2: Site Development—Maximize Open Space
193 Jorge López de Obeso
Architect / Environmental adviser
EA Energia y Arquitectura
Thu, Jun 9, 2016
2016-06-09 11:33 Mexico
drainage area for sediment basin
in NC 2009 SSp1: Construction Activity Pollution Prevention
299 Hongyun Zhou
Thu, Jun 9, 2016
2016-06-09 11:14 China
LEED recertification process
in PIf5: Building System Control
7 VICTOR MORENO
TECHNICAL DIRECTOR
ISOLANA AHORRO ENERGÉTICO SL
Thu, Jun 9, 2016
2016-06-09 09:25 Spain
Compliance for Corporate Interiors?
in Pilot Credit 78: Design for active occupants
139 Rachel Bannon-Godfrey
Director of Sustainability
RNL design
Thu, Jun 9, 2016
2016-06-09 09:18 United States
access to medical point and massage point
in NC 2009 IDc1: Innovation in Design
620 Agata Mozer
GO4IT SP Z OO SP K
Thu, Jun 9, 2016
2016-06-09 08:50 Poland
All open space that is counted toward this credit will be preser
in NC 2009 SSc5.2: Site Development—Maximize Open Space
193 Agata Mozer
GO4IT SP Z OO SP K
Thu, Jun 9, 2016
2016-06-09 07:53 Poland
Credit Still Open?
in Pilot Credit 12: Reduced Automobile Dependence
50 Rachel Bannon-Godfrey
Director of Sustainability
RNL design
Thu, Jun 9, 2016
2016-06-09 07:31 United States
Credit Still Open?
in Pilot Credit 12: Reduced Automobile Dependence
50 Rachel Bannon-Godfrey
Director of Sustainability
RNL design
Thu, Jun 9, 2016
2016-06-09 07:28 United States
Energy Modeling
in NC 2009 EAp2: Minimum Energy Performance
3,822 Muzamil Rafique
Thu, Jun 9, 2016
2016-06-09 07:18 Pakistan

Copyright 2016 – BuildingGreen, Inc.