LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Are filing cabinets included
in NC-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
25 Farah A.
Sat, Mar 1, 2014
RE: Historical Buildings with Protected Facades
in ND-v2009: Minimum building energy efficiency
6 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Fri, Feb 28, 2014
RE: Looking forward to your feedback
in Pilot Credit 12: Reduced Automobile Dependence
47 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 25, 2014
RE: Pilot Credits and LEED v4
in Pilot Credit 18: Appliance & Process Water Use Reduction
36 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 25, 2014
RE: Building with different uses
in MPR5: Must comply with minimum occupancy rates
16 Trista Little
Sustainability Manager
YR&G
Tue, Feb 25, 2014
RE: Existing constructions and non infiltration water tanks
in ND-v2009: Rainwater management
4 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Fri, Feb 21, 2014
RE: Calculating Walking Distances
in ND-v2009: Locations with reduced automobile dependence
18 Vita Shklovsky
Wed, Feb 19, 2014
RE: Number of cycles
in EBOM-v4: Cooling tower water use
4 Batya Metalitz
Technical Director, LEED
USGBC
Wed, Feb 19, 2014
RE: Possible Exemption?
in EBOM 2009 IEQc1.3: IAQ Best Management Practices—Increased Ventilation
10 Hannah Bronfman
Sustainability Consultant
YR&G
Mon, Feb 17, 2014
RE: Occupancy Sensors may be replaced
in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls
68 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Fri, Feb 14, 2014
RE: *sensationalism alert*!
in Does LEED v4 Ban PVC?
11 Paula Melton
Managing Editor
BuildingGreen, Inc.
Wed, Feb 26, 2014
RE: a LEED-NC V2.2 three-story mixed use building
in NC v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
54 Michelle Rosenberger
Partner
ArchEcology, LLC
Fri, Feb 13, 2015
Renovate an old school
in Schools-EBOM-v4: Must comply with project size requirements
1 Davide Filippi
Wed, Feb 12, 2014
RE: Commercial buildings?
in EBOM-v4: Environmental Tobacco Smoke Control
3 Jonathan Miller
Mon, Feb 10, 2014
What certifications are accepted by USGBC for v4 low-emissions?
in CI-v4: Low emitting materials
1 Randy Carter
Manager, Global Codes & Approvals
Steelcase Inc.
Wed, Apr 23, 2014
RE: LEED-CS sunset date
in Sunset Dates for CI/CSv2.0
3 Usama Eita
Wed, Feb 5, 2014
RE: VOC limits?
in Retail–CI-v2009: Low-emitting materials - ceiling and wall systems
3 Webly Bowles
Associate Principal
Green Building Services
Tue, Feb 4, 2014
RE: LEED -NC 2009 for Retail, MRp1
in Retail–NC-v2009: Storage and collection of recyclables
2 Webly Bowles
Associate Principal
Green Building Services
Tue, Feb 4, 2014
RE: ASTM tests for BECx
in Healthcare-v2009: Enhanced commissioning
4 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Feb 3, 2014
RE: Unclear sound isolation requirements at hallways
in Pilot Credit 24: Acoustics
28 Larissa Oaks
Specialist, LEED
USGBC
Fri, Jan 31, 2014
Title Comments Most Recent Post Location
RE: Proximity to farmers' market
in ND-v2009: Local food production
8 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Sep 17, 2013
RE: Do bio-based inhibited glycols contribute to LEED certification?
in NC v2.2 MRc6: Rapidly Renewable Materials
25 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Aug 5, 2013
RE: Peak Discharge Rate
in Schools 2009 SSc6.1: Stormwater Design—Quantity Control
6 Nicole Ferrini
via T&M Associates
Fri, Aug 2, 2013
RE: Credit Requirements
in Pilot Credit 61: Material Disclosure and Assessment
8 Melissa Vernon
Consultant
Wed, Jul 31, 2013
RE: LEED ND - outside the US
in ND-v2009: Building water efficiency
5 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Mon, Jul 29, 2013
HVAC baseline model
in Retail–CI-v2009: Optimize energy performance - HVAC
1 Francesco Passerini
engineer
Wed, Jul 24, 2013
RE: roof deck, roof
in NC v2.2 MRc1.1–1.2: Building Reuse
24 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Jul 11, 2013
RE: Crushed Concrete used
in CS 2009 MRc3: Materials Reuse
16 RIM Architects
RIM Architects
Mon, Jul 8, 2013
RE: Retrofit
in Healthcare-v2009: Hazardous material removal or encapsulation (renovations only)
5 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, Jun 26, 2013
RE: Systems Required in Cx Scope
in Schools-2009 EAp1: Fundamental Commissioning of Building Energy Systems
7 John Glaeser
Fri, Dec 20, 2013
RE: Upper and lower roof
in Healthcare-v2009: Heat island effect - roof
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 31, 2013
RE: Number of testing point
in Healthcare-v2009: Construction IAQ management plan - before occupancy
6 Emil Andersson
Green Certification Coordinator
Skanska Sweden
Fri, May 31, 2013
RE: Pilot credit
in ND-v2009: Innovation and exemplary performance
2 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Thu, May 30, 2013
RE: Regional Credits in Canada?
in Healthcare-v2009: Regional priority
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 3, 2013
RE: Clarifications
in Healthcare-v2009: Construction activity pollution prevention
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Apr 22, 2013
RE: Recycling Design Guidelines for large projects
in ND-v2009: Solid waste management infrastructure
7 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Apr 16, 2013
RE: Capitol Cost ECMs
in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation
32 Robert Calloway
President
Global Facility Solutions, LLC
Fri, Jan 17, 2014
RE: LEED AP Consultant Fee
in EBOM 2009 IOc2: LEED Accredited Professional
10 Rodney Berry
Mon, Apr 8, 2013
RE: ND standard vs the NC standard
in ND-v2009: Construction activity pollution prevention
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, Mar 28, 2013
PC 26 Advanced Energy Metering - Feedback
in Pilot Credit 26: Advanced Energy Metering
17 SOFIA KESIDOU
Mon, Mar 18, 2013
Title Comments Most Recent Post Location
Check MPRs
in LEED Boundary
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
LEED rating system selection policy - schools
in LEED Schools
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
narrow it down
in Leed Consultant Contract
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jun 24, 2010
If we assume there's no
in Major Renovation - Minimum Program Requirements
1 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Thu, Jun 24, 2010
RE: FTE
in Calculating FTEs for a Lobby
8 Shannon Gray
Consultant
YRG sustainability
Wed, Jun 23, 2010
LEED 2009 - Major Renovation of Metal Bldg: Recycle, Reuse, Regional Issues - by Sara LeMone
Wed, Jun 30, 2010
post to EQc8.1 forum
in Daylighting calculation for open areas
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Jun 20, 2010
SSc4.2 Bicycle path minimum width (LEED for Schools) - by Jorge Arismendi
Fri, Jun 18, 2010
RE: Scope of work
in Determining the best rating system for a project
4 Amanda Roelle
Architect
Thu, Jun 17, 2010
RE: alternative path with signatories
in Initials on LEED Credit Forms
2 Leo van Veldhuizen
Outback Building Design
Thu, Jun 17, 2010
RE: Project eligibility
in Implementing LEED NC on a project that has commenced construction
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 14, 2010
Alternative Documentation Paths
in Owner Signatories
1 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
LEED Online troubles
in Credits that were complete are no longer on LEED Online
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
RE: Smaller projects
in MAN-HOUR
5 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Tue, Jun 8, 2010
LEED-NC Application Guide for Multiple Buildings & On-Campus Bu
in 1 Site ... 2 Projects
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 8, 2010
RE: "Passed in 2006 or before and not appearing in LEED AP Directory
in LEED AP for 6 years - but NOT on LEED Online
2 Brian Kaplan
Associate
STUDIOS architecture
Fri, Jun 4, 2010
RE: Which version
in Changing Authorization Levels
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jun 4, 2010
No spreadsheet...
in Accepted local codes and standards in other countries (Sweden)
1 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Thu, Jun 3, 2010
RE: Performance period management
in Shortest Possible Performance Period
2 Jenny Carney
Principal
YR&G
Tue, Jun 1, 2010
Post to credit
in DAYSIM 3.0
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 1, 2010
Title Comments Most Recent Post Location
RE: Medical gases
in Healthcare-v2009: PBT source reduction - lead, cadmium and copper
19 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, May 7, 2014
RE: Concrete Sediment Control
in NC v2.2 SSp1: Construction Activity Pollution Prevention
33 michelle bombeck
Project Associate
O'Brien & Company
Tue, May 6, 2014
EPD without program operator and/or specific PCR
in NC-v4: Building product disclosure and optimization - environmental product declarations
18 Paula Rantanen
Consultant
Ramboll Finland Oy
Tue, May 6, 2014
RE: Is Cradle-to-Cradle Certification acceptable?
in Schools IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems
70 Josh Jacobs
Technical Information & Public Affairs Manager
UL Environment
Mon, May 5, 2014
v4 Project on 2009 Campus
in New LEED Guidance for Campuses and Multiple Buildings
534 Edwin van Eeckhoven
CEO
C2N
Mon, May 5, 2014
How to claifiy a permanet no-smoking signate
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
292 Leanne Niu
Mon, May 5, 2014
RE: Fire during construction
in CS 2009 SSp1: Construction Activity Pollution Prevention
60 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, May 3, 2014
PC 9 - Open & Connected Community
in Pilot Credit 9: Street Network
67 michael kollman
Thu, May 1, 2014
RE: green cleaning term
in NC 2009 IDc1: Innovation in Design
580 Glen Phillips
Director of Sustainable Education
GreenCE, Inc.
Wed, Apr 30, 2014
LEED Boundary
in PIf4: Schedule and Overview Documents
1 CT G
Wed, Apr 30, 2014
Pest Control During Construction?
in NC-2009: Clean construction
1 Juhi Jain
Project Consultant
Thornton Tomasetti / Sustainability
Tue, Apr 29, 2014
Does the 5 days/week requirement apply for the project duration?
in NC-2009: Green training for contractors, trades, operators and service workers
12 Tiffany King
Tue, Apr 29, 2014
United States
RE: Occupancy Date Comments
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
279 Heather DeGrella
Sustainability Coordinator
Opsis Architecture
Tue, Apr 29, 2014
Workspace Pods
in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
145 Akos Brandecker
Sustainability Manager
ISG
Tue, Apr 29, 2014
Choice between LEED NC & LEED HC
in LEED for Healthcare forum - LEED-HC users welcome!
120 Ghaith Moufarege
Mon, Apr 28, 2014
RE: Certifying a single Building within a Complex - energy metering
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
121 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Sun, Apr 27, 2014
RE: Parking Garage Entrance
in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control
346 Michelle Halle Stern
LEED Fellow
The Green Facilitator
Fri, Apr 25, 2014
RE: Tenants Obliged to Share Data with USGBC?
in CS 2009 EAc5.2: Measurement and Verification—Tenant Submetering
91 Marcus Sheffer
LEED Fellow
7group
Thu, Apr 24, 2014
Application/Performance period
in Performance Period
52 Keith Johnson
Wed, Apr 23, 2014
United States
RE: Is it ok to take out charge for changing facilities?
in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
96 Charles Nepps
Tue, Apr 22, 2014
Title Comments Post date Most Recent Postsort icon Location
Filter Replacement
in CS 2009 IEQc3: Construction IAQ Management Plan—During Construction
31 Andrew Ellsworth
Ellsworth Building Portfolio Services
Wed, Dec 17, 2014
2014-12-17 23:13 United States
ASHRAE 90.1 Chilled Beams Compliance
in Start a New LEED Discussion Topic
190 Federico Taboada
Architect
ECOSTUDIOXV
Wed, Dec 17, 2014
2014-12-17 19:58 United States
Renewable Energy
in CI-v4: Renewable energy production
1 Ulrika Nobelius
White Arkitekter AB
Wed, Dec 17, 2014
2014-12-17 15:05 Sweden
How to prove compliance with Mechanical Ventilation
in NC 2009 EAp2: Minimum Energy Performance
2,904 Praveen Raj
Energy Analyst
Wed, Dec 17, 2014
2014-12-17 05:53 India
Submeters to measure AND RECORD energy use
in CI 2009 EAc3: Measurement and Verification
146 Michael Smithing
Director - Green Building Advisory
Colliers International
Wed, Dec 17, 2014
2014-12-17 05:44 Sweden
Lighting boundary SSc6 in new
in NC-v4: Light pollution reduction
43 Ilse Dijkstra-Nugteren
Wed, Dec 17, 2014
2014-12-17 05:18 Netherlands
Heat gain originating from hooded equipment in energy modeling
in NC 2009 EAp2: Minimum Energy Performance
2,904 Panupant Phapant
SCG Cement - Building Materials Co.,Ltd.
Wed, Dec 17, 2014
2014-12-17 03:16 Thailand
VAV Fan control for baseline system 6
in NC 2009 EAp2: Minimum Energy Performance
2,904 Panupant Phapant
SCG Cement - Building Materials Co.,Ltd.
Tue, Dec 16, 2014
2014-12-17 00:37 Thailand
Is there any Credit Language for this
in Schools-2009: Social equity within the project team
2 Vada Kornegay
Tue, Dec 16, 2014
2014-12-16 17:49 United States
ETS During Construction
in NC-v4: Environmental tobacco smoke control
2 Laurie Winter
Tue, Dec 16, 2014
2014-12-16 17:17 Canada
Insulation - option 2 budget calculation method
in NC-v4: Low emitting materials
110 CAROLINE PIN
In charge of environmental certification on a jobsite
EIFFAGE CONSTRUCTION
Tue, Dec 16, 2014
2014-12-16 13:20 France
UV Lacquer
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
503 Susan Coy
Tue, Dec 16, 2014
2014-12-16 12:26 United States
When to submit a pilot credit?
in Using the LEED Pilot Credit Library
30 Alfred Servodidio
Project Manager
JMV Consulting Engineering
Tue, Dec 16, 2014
2014-12-16 11:06 United States
Runoff/Gully Water
in NC 2009 WEc1: Water Efficient Landscaping
395 Tamary Alvarez
Sustainability & Commissioning Specialist
Commissioning Agents Inc.
Tue, Dec 16, 2014
2014-12-16 09:47 United States
Supplementary mechanical ventilation in naturally ventilated
in CI-2009 IEQp1: Minimum IAQ Performance
145 Michael Smithing
Director - Green Building Advisory
Colliers International
Mon, Dec 15, 2014
2014-12-15 23:05 Sweden
selecting the correct rating system in v.2009
in What LEED rating system to use?
9 K KRAFT
Mon, Dec 15, 2014
2014-12-15 18:32 United States
"Single Site" requirement for a Master Site?
in New LEED Guidance for Campuses and Multiple Buildings
534 Richard Barlow
Dir. of Sustainability
MHAworks
Mon, Dec 15, 2014
2014-12-15 12:16 United States
Custom furniture for LEED project
in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
145 Roxanne Button
Architect & Sustainable Design Consultant, AIA, MRAIC, LEED AP
Design Synergies Architecture P.C.
Mon, Dec 15, 2014
2014-12-15 09:30 United States
Prefinished wood flooring: alternative to emissions testing?
in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
351 Susan Clark
Technical Specialist
NCC Teknik
Mon, Dec 15, 2014
2014-12-15 04:57 Sweden
MRc2 Form Version 0.2.3.. undervaluing commingled waste?
in NC 2009 MRc2: Construction Waste Management
378 Jake Bebee LEED AP BD+C ID+C
Project Manager
Fri, Dec 12, 2014
2014-12-12 16:01 United States

Copyright 2015 – BuildingGreen, Inc.