LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Unclear sound isolation requirements at hallways
in Pilot Credit 24: Acoustics
28 Larissa Oaks
Specialist, LEED
USGBC
Fri, Jan 31, 2014
RE: Healthcare & Schools - Exterior Requirements
in Schools-NC-v4: Low emitting materials
4 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 23, 2014
RE: Regional Priority points in total points attempted
in Schools 2009 RPc1: Regional Priority
13 J W
Tue, Jan 28, 2014
RE: LEED AP without speciality
in ND-v2009: LEED Accredited Professional
3 David ESPAGNET
Green Building and Sustainability Project Manager
Bureau Veritas
Tue, Jan 28, 2014
RE: Tenant switch in a EBOM certified building
in PIf5: Building System Control
12 Barry Giles
Founder & CEO, LEED Fellow
BuildingWise LLC
Tue, Feb 25, 2014
RE: Legacy LEED AP
in Healthcare-v4: LEED Accredited Professional
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jan 27, 2014
Data Center location restrictions
in Data Centers-NC-v4: Surrounding density and diverse uses
1 Charalampos Giannikopoulos
Founder
DCarbon
Sat, Jan 25, 2014
RE: Where are the V4 forms?
in NC-v4: Storage and collection of recyclables
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jan 23, 2014
RE: Split Submissions now and after 2015
in How long does it take for USGBC to do the LEED design & construction review?
11 John Neville
President
Sustainable Arizona
Thu, Jan 23, 2014
Pilot Credit 34 Update
in Pilot Credit 34: Design for Adaptability
10 Sandy Chung
Senior Associate, Senior Designer
TCA Architects
Wed, Jan 22, 2014
waste management by bedroom vs sf
in Homes-v4: Construction waste management
1 Elizabeth Eason
principal architect
Elizabeth Eason Architecture LLC
Wed, Jan 22, 2014
RE: Aren't Corrections only supposed to be published in Apr and Oct?
in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
51 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jul 2, 2014
RE: Case for existing parking
in ND-v2009: Reduced parking footprint
6 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Fri, Jan 17, 2014
RE: Calculating unobstructed operable window area of top hung window
in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort
67 Dylan Connelly
Mechanical Engineer
Integral Group
Tue, Jan 14, 2014
RE: Bank
in Schools 2009 SSc2: Development Density and Community Connectivity
14 Todd Bundren
Director of Sustainabilty - Architectural Project Manager
Lawrence Group
Tue, Jan 14, 2014
RE: Private versus public lavs
in Healthcare-v2009: Water use reduction
11 Mara Baum
Healthcare Sustainable Design Leader, LEED Fellow
HOK
Thu, Jan 9, 2014
RE: Existing bicycle network
in ND-v2009: Bicycle network and storage
9 Regina Ng
Thu, Jan 9, 2014
RE: CO2 sensors in duct work
in Schools 2009 IEQc1: Outdoor Air Delivery Monitoring
11 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional, Guiding Principles Compliance Professional
Energy Ace
Wed, Jan 8, 2014
RE: storage without reusing
in NC v2.2 SSc6.1: Stormwater Design—Quantity Control
41 Michael DeVuono
Senior Staff Designer
T&M Associates
Tue, Jan 7, 2014
RE: Is it really the windows?
in Poor Cell Phone Service in LEED buildings
5 Travis Reed
CellAntenna
Mon, Jan 6, 2014
Title Comments Most Recent Post Location
RE: Recycling Design Guidelines for large projects
in ND-v2009: Solid waste management infrastructure
7 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Apr 16, 2013
RE: Capitol Cost ECMs
in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation
32 Robert Calloway
President
Global Facility Solutions, LLC
Fri, Jan 17, 2014
RE: LEED AP Consultant Fee
in EBOM 2009 IOc2: LEED Accredited Professional
10 Rodney Berry
Mon, Apr 8, 2013
RE: ND standard vs the NC standard
in ND-v2009: Construction activity pollution prevention
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, Mar 28, 2013
PC 26 Advanced Energy Metering - Feedback
in Pilot Credit 26: Advanced Energy Metering
17 SOFIA KESIDOU
Mon, Mar 18, 2013
PC 25 Water Metering and Reporting - Feedback
in Pilot Credit 25: Water Metering & Reporting
8 SOFIA KESIDOU
Mon, Mar 18, 2013
RE: Area rugs / Loose mats
in NC v2.2 EQc4.3: Low-Emitting Materials—Carpet Systems
29 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 14, 2013
RE: LEED AP working from an other city
in Retail–CI-v2009: LEED Accredited Professional
4 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Feb 9, 2013
RE: buidable land
in ND-v2009: Steep slope protection
8 Noriko Yasuhara
Woonerf Inc.
Wed, Feb 6, 2013
RE: Credit availability
in Pilot Credit 48: Discovery—Analysis to Support Integrative Process
4 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Feb 3, 2013
RE: Water Bodies
in Schools 2009 SSc1: Site Selection
13 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jan 31, 2013
IAQ Procedure contaminant testing - costs and concerns
in EBOM-2009: Indoor air quality procedure - alternative compliance path
1 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Thu, Jan 31, 2013
RE: Document review
in Schools-2009 EAc3: Enhanced Commissioning
2 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Dec 20, 2013
RE: What about on-site renewable energy, factored or not?
in Schools 2009 EAc6: Green Power
12 Marcus Sheffer
LEED Fellow
7group
Wed, Dec 12, 2012
RE: GIBp1
in ND-v2009: Certified green buildings
8 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Mon, Dec 3, 2012
RE: MPR6
in Retail–NC-v2009: Measurement and verification
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Nov 22, 2012
RE: Call-a-Ride as compliant public transport
in Schools 2009 SSc4.1: Alternative Transportation—Public Transportation Access
14 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Mon, Nov 19, 2012
RE: Asbestos Remediation prior to demolition
in Schools 2009 SSc3: Brownfield Redevelopment
4 Larry Sims
Principal
Studio4, LLC
Mon, Nov 5, 2012
RE: 3D lighting model
in Pilot Credit 23: Quality Views
12 Michael E. Edmonds-Bauer
Edmonds International
Tue, Dec 11, 2012
RE: Calculation of baseline, "lowest first-cost"
in ND-v2009: Infrastructure energy efficiency
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Fri, Oct 26, 2012
Title Comments Most Recent Post Location
Check MPRs
in LEED Boundary
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
LEED rating system selection policy - schools
in LEED Schools
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 30, 2010
narrow it down
in Leed Consultant Contract
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jun 24, 2010
If we assume there's no
in Major Renovation - Minimum Program Requirements
1 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Thu, Jun 24, 2010
RE: FTE
in Calculating FTEs for a Lobby
8 Shannon Gray
Consultant
YRG sustainability
Wed, Jun 23, 2010
LEED 2009 - Major Renovation of Metal Bldg: Recycle, Reuse, Regional Issues - by Sara LeMone
Wed, Jun 30, 2010
post to EQc8.1 forum
in Daylighting calculation for open areas
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Jun 20, 2010
SSc4.2 Bicycle path minimum width (LEED for Schools) - by Jorge Arismendi
Fri, Jun 18, 2010
RE: Scope of work
in Determining the best rating system for a project
4 Amanda Roelle
Architect
Thu, Jun 17, 2010
RE: alternative path with signatories
in Initials on LEED Credit Forms
2 Leo van Veldhuizen
Outback Building Design
Thu, Jun 17, 2010
RE: Project eligibility
in Implementing LEED NC on a project that has commenced construction
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 14, 2010
Alternative Documentation Paths
in Owner Signatories
1 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
LEED Online troubles
in Credits that were complete are no longer on LEED Online
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Jun 11, 2010
RE: Smaller projects
in MAN-HOUR
5 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Tue, Jun 8, 2010
LEED-NC Application Guide for Multiple Buildings & On-Campus Bu
in 1 Site ... 2 Projects
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 8, 2010
RE: "Passed in 2006 or before and not appearing in LEED AP Directory
in LEED AP for 6 years - but NOT on LEED Online
2 Brian Kaplan
Associate
STUDIOS architecture
Fri, Jun 4, 2010
RE: Which version
in Changing Authorization Levels
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jun 4, 2010
No spreadsheet...
in Accepted local codes and standards in other countries (Sweden)
1 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Thu, Jun 3, 2010
RE: Performance period management
in Shortest Possible Performance Period
2 Jenny Carney
Principal
YR&G
Tue, Jun 1, 2010
Post to credit
in DAYSIM 3.0
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 1, 2010
Title Comments Most Recent Post Location
Bird Collision Deterrence: Summary of Material Threat Factors
in Pilot Credit 55: Bird Collision Deterrence
40 Alysa Hoffmeister
VP & GM of No America
Dip-Tech
Thu, Mar 20, 2014
United States
Data center floor area like an unoccupied space
in Start a New LEED Discussion Topic
186 Paola Moschini
Architect LEED AP BD+C, ID+C
MACRO DESIGN STUDIO
Wed, Mar 19, 2014
CS MPR2: reclaimed land without development previously
in MPR2: Must be a complete, permanent building or space
3 Vivien Wong
Parsons Brinckerhoff
Wed, Mar 19, 2014
RE: Exemplary performance for SSc2 in LEED v.2
in NC 2009 SSc2: Development Density and Community Connectivity
249 Michelle Robinson
Re:Vision Architecture
Mon, Mar 17, 2014
C&S 2009 Retail tenant space
in CS 2009 IEQc6: Controllability of Systems—Thermal Comfort
35 London Huenefeld
Mon, Mar 17, 2014
United States
RE: FSC Controlled Wood
in CI 2009 MRc7: Certified Wood
99 Megan Bove
Thu, Mar 13, 2014
RE: SS Credit 7.1 - Calculating shade
in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
45 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Thu, Mar 13, 2014
RE: Where to find the Ecologo-certified products?
in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
146 Helen Samuel
Staff
Ernst & Young
Thu, Mar 13, 2014
United States
Insulating Concrete Forms
in Pilot Credit 20: Recycled Content for Non-Structural Materials
11 Amy Van Dam
Sustainable Design Coordinator
Boulder Associates Architects
Thu, Mar 13, 2014
appeal process
in Review Appeal
36 Courtney Royal, LEED AP BD+C
Sr. Sustainability Consultant
Taitem Engineering
Thu, Mar 13, 2014
appeal process
in Review Appeal
36 Courtney Royal, LEED AP BD+C
Sr. Sustainability Consultant
Taitem Engineering
Thu, Mar 13, 2014
RE: "Landscape = 5% of the total site area" Rule
in NC 2009 WEc1: Water Efficient Landscaping
393 Andrey Kuznetsov
Green Building and Sustainability Consultant (LEED AP BD+C)
Signy Group
Wed, Mar 12, 2014
RECs for Europe
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
98 Charalampos Giannikopoulos
Founder
DCarbon
Tue, Mar 11, 2014
Greece
Campus road
in MPR3: Must use a reasonable site boundary
209 Susan Di Giulio
Project Manager
Zinner Consultants
Tue, Mar 11, 2014
RE: Changes in development program form
in PIf1: Development Program and Site Type
22 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Mar 11, 2014
10 existing villas project
in LEED Rating System Selection Q&A
678 Adamantia Zisopoulou
Architect
Tue, Mar 11, 2014
Greece
Can we administer survey on multiple days?
in EBOM 2009 SSc4: Alternative Commuting Transportation
281 Helen Samuel
Staff
Ernst & Young
Mon, Mar 10, 2014
SSc1 documents for International Projects
in Determining Farmland or Floodplain Classification for SSc1
17 Saud Abdul Rasheed
Sustainability/LEED Engineer
Al Yamama Company
Sun, Mar 9, 2014
registering a project
in MPR4: Must comply with minimum floor area requirements
10 Megan Bove
Sun, Mar 9, 2014
United States
note about this forum
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
Title Comments Post date Most Recent Postsort icon Location
LEED Construction Submission
in Start a New LEED Discussion Topic
186 Christopher Strunk
P.E.
Thu, Nov 13, 2014
2014-11-13 09:43 United States
SRI tested material
in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
45 Juliane Muench
Thu, Nov 13, 2014
2014-11-13 06:36 Denmark
loading bay inside building footprint
in PIf2: Project Summary Details
195 Melissa Merryweather
Director
Green Consult-Asia
Thu, Nov 13, 2014
2014-11-13 02:04 Vietnam
LEED EBOM
in LEED Rating System Selection Q&A
678 Srimannarayana NCVK
ESD Consultant
Thu, Nov 13, 2014
2014-11-13 01:10 United Arab Emirates
Daylight savings time
in Schools 2009 IEQc8.1: Daylight and Views—Daylight
135 James Geers
Architect, LEED AP, Director of Sustainable Design
SFA Architects Inc.
Wed, Nov 12, 2014
2014-11-12 17:50 United States
Accused synergies between views documentation & other EQ points
in CS 2009 IEQc8.2: Daylight and Views—Views
59 emily reese
Sustainability Consultant / Facility Planner
Jacobs Engineering
Wed, Nov 12, 2014
2014-11-12 17:47 United States
LEED GAs and APs exams
in LEED 2009 Registration Extended to October 2016
138 KONSTANTINOS VAVALETSKOS
J/V IMPR. SPA TERNA SA
Wed, Nov 12, 2014
2014-11-12 07:30 Greece
LEED EA C4 Calculator
in NC v2.2 EAc4: Enhanced Refrigerant Management
23 Achyut Kulkarni
Wed, Nov 12, 2014
2014-11-12 03:44 India
Tenant work and submittal of credits
in CS-2009 IEQp1: Minimum IAQ Performance
136 Juliane Muench
Wed, Nov 12, 2014
2014-11-12 03:03 Denmark
Baseline for retail
in NC 2009 EAp2: Minimum Energy Performance
2,843 Juliane Muench
Tue, Nov 11, 2014
2014-11-11 16:44 Denmark
ANSI/BIFMA Testing Date vs Manufacture Date
in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
143 Nicole Newman
Tue, Nov 11, 2014
2014-11-11 11:27 United States
Formaldehyde resins in mineral wool insulation and firesafing
in Healthcare-v2009: Low-emitting materials
55 Larry Jones
Associate
Atelier Ten
Tue, Nov 11, 2014
2014-11-11 10:41 United States
MIXED MODE Ventilation
in CI-2009 IEQp1: Minimum IAQ Performance
145 Sathish Kumar
Green projects
Conserve Consultants Pvt. ltd.
Tue, Nov 11, 2014
2014-11-11 02:08 India
Comms/ data room cooling - Process Energy for LEED
in NC 2009 EAc1: Optimize Energy Performance
1,166 Victoria Watson
Mon, Nov 10, 2014
2014-11-10 18:19 United States
FSC certified shop
in NC 2009 MRc7: Certified Wood
442 Marc Perry
Marc Perry Architect
Mon, Nov 10, 2014
2014-11-10 17:09 United States
All purpose putty
in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
95 James Emery
Partner
Iredale Group Architecture
Mon, Nov 10, 2014
2014-11-10 15:36 Canada
EBOM v4 prereqs a barrier?
in LEED 2009 Registration Extended to October 2016
138 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Mon, Nov 10, 2014
2014-11-10 14:27 United States
LEED v4 delay with ACC implications..??
in LEED 2009 Registration Extended to October 2016
138 Jeff Frost
Sustainable Project Manager
Smithgroup|JJR
Mon, Nov 10, 2014
2014-11-10 12:47 United States
International Projects
in LEED 2009 Registration Extended to October 2016
138 Marcus Sheffer
LEED Fellow
7group
Mon, Nov 10, 2014
2014-11-10 12:46 United States
Pleased to hear of the extension.
in LEED 2009 Registration Extended to October 2016
138 Anne Porter
Mon, Nov 10, 2014
2014-11-10 12:10 United States

Copyright 2015 – BuildingGreen, Inc.