LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
Keeping Up with the Kardashians Season 9 Episode 18 - KUWTK 9x18
in PIf2: Project Summary Details
1 Jo Ann Wadler
Sun, Aug 17, 2014
RE: Manufacturer and Vendor COC and Correct invoice format
in NC 2009 MRc7: Certified Wood
388 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Sat, Aug 16, 2014
RE: Testing results for wall base
in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
306 Agnes Vorbrodt
Principal
VvS | Architects & Consultants
Sat, Aug 16, 2014
RE: Commercial Kitchen as Multi-occupant space
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
283 Heather DeGrella
Sustainability Coordinator
Opsis Architecture
Fri, Aug 15, 2014
Reference Guide Error
in NC-v4: Indoor water use reduction
1 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Fri, Aug 15, 2014
Reporting and metering frequency
in NC-v4: Water metering
1 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Fri, Aug 15, 2014
RE: AHRI Condition Efficiencies for Groundwater HP
in NC v2.2 EAc1: Optimize Energy Performance
295 Marcus Sheffer
LEED Fellow
7group
Fri, Aug 15, 2014
RE: Residential Development Proof
in CI 2009 SSc2: Development Density and Community Connectivity
103 Christopher Shaw
Seeberger Architecture
Fri, Aug 15, 2014
RE: Large park
in ND-v2009: Housing and jobs proximity
12 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Aug 15, 2014
Certified IPM Service
in EBOM-v4: Integrated pest management
1 LEED Consultant
Green Building and Alternative Energy
Fri, Aug 15, 2014
RE: Option 2 - CIR's
in NC 2009 WEc2: Innovative Wastewater Technologies
113 Donald Green
Project Manager
Sustainable Design Consulting, LLC
Fri, Aug 15, 2014
Option 2 - one time fee or annually
in NC-v4: Site development - protect or restore habitat
1 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Thu, Aug 14, 2014
RE: Dry pre mix mineral based bonding coat
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
447 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Thu, Aug 14, 2014
Bamboo flooring materials
in NC 2009 MRc6: Rapidly Renewable Materials
49 Lilian Seow
LEED Manager
Vancouver, BC Canada
Thu, Aug 14, 2014
RE: Vendor Invoice Rqmnts??
in NC v2.2 MRc7: Certified Wood
158 Jason Grant
Principal
Jason Grant Consulting
Thu, Aug 14, 2014
Pursuing option 2, path 2
in CS 2009 WEc1: Water Efficient Landscaping
56 Andrey Kuznetsov
Green Building and Sustainability Consultant (LEED AP BD+C)
Signy Group
Thu, Aug 14, 2014
RE: Energy Star Portfolio Manager
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
453 Vincent Dupuy
Eng., PA LEED BD+C
Cofely Services - GDF Suez
Thu, Aug 14, 2014
Confused about Perf periods and 2-yr contract for offsite REC's
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
91 Wendy Parker, LEED AP
Manager of Safety & Environmental
MetroNational
Thu, Aug 14, 2014
Manual Pruning & Hand Weeding
in EBOM 2009 SSc2: Building Exterior and Hardscape Management Plan
101 Lucy Williams
Principal
Lucy C. Williams, Architect
Thu, Aug 14, 2014
RE: Path 12
in CI 2009 SSc1: Site Selection
200 Kristina Bach
Sustainability Specialist
Thu, Aug 14, 2014
Title Comments Most Recent Post
RE: Residential Development Proof
in CI 2009 SSc2: Development Density and Community Connectivity
103 Christopher Shaw
Seeberger Architecture
Fri, Aug 15, 2014
RE: Large park
in ND-v2009: Housing and jobs proximity
12 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Aug 15, 2014
Certified IPM Service
in EBOM-v4: Integrated pest management
1 LEED Consultant
Green Building and Alternative Energy
Fri, Aug 15, 2014
RE: Option 2 - CIR's
in NC 2009 WEc2: Innovative Wastewater Technologies
113 Donald Green
Project Manager
Sustainable Design Consulting, LLC
Fri, Aug 15, 2014
Option 2 - one time fee or annually
in NC-v4: Site development - protect or restore habitat
1 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Thu, Aug 14, 2014
RE: Dry pre mix mineral based bonding coat
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
447 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Thu, Aug 14, 2014
Bamboo flooring materials
in NC 2009 MRc6: Rapidly Renewable Materials
49 Lilian Seow
LEED Manager
Vancouver, BC Canada
Thu, Aug 14, 2014
RE: Vendor Invoice Rqmnts??
in NC v2.2 MRc7: Certified Wood
158 Jason Grant
Principal
Jason Grant Consulting
Thu, Aug 14, 2014
Pursuing option 2, path 2
in CS 2009 WEc1: Water Efficient Landscaping
56 Andrey Kuznetsov
Green Building and Sustainability Consultant (LEED AP BD+C)
Signy Group
Thu, Aug 14, 2014
RE: Energy Star Portfolio Manager
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
453 Vincent Dupuy
Eng., PA LEED BD+C
Cofely Services - GDF Suez
Thu, Aug 14, 2014
Confused about Perf periods and 2-yr contract for offsite REC's
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
91 Wendy Parker, LEED AP
Manager of Safety & Environmental
MetroNational
Thu, Aug 14, 2014
Manual Pruning & Hand Weeding
in EBOM 2009 SSc2: Building Exterior and Hardscape Management Plan
101 Lucy Williams
Principal
Lucy C. Williams, Architect
Thu, Aug 14, 2014
RE: Path 12
in CI 2009 SSc1: Site Selection
200 Kristina Bach
Sustainability Specialist
Thu, Aug 14, 2014
Horse Riding Arena
in NC 2009 WEc3: Water Use Reduction
98 Kavita Karmarkar
Student
Wed, Aug 13, 2014
RE: LEED EBOM application day
in MPR5: Must comply with minimum occupancy rates
2 David Eldridge
Project Manager
Grumman/Butkus Associates
Wed, Aug 13, 2014
Stand Alone Refrigerators and Freezers to be included in EAc4?
in NC 2009 EAc4: Enhanced Refrigerant Management
102 Vivien Fairlamb
Wed, Aug 13, 2014
Open Grid Pavement
in NC 2009 SSc5.2: Site Development—Maximize Open Space
164 Alexia Anastassiadis
Wed, Aug 13, 2014
RE: FSC MIX
in CI 2009 MRc7: Certified Wood
98 Viktor Reutherborg
Trainee
NCC Construction Sverige
Wed, Aug 13, 2014
RE: 100% Solids Epoxy
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
70 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Tue, Aug 12, 2014
RE: Net vs. Gross tonnage
in NC 2009 MRc2: Construction Waste Management
326 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Tue, Aug 12, 2014
Title Comments Most Recent Post
BREEAM and LEED
in BREEAM Equivalency for LEED Projects
1 Emily Rhee
Fri, Sep 6, 2013
RE: Categories and prescriptive path alternate option
in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
47 Erin Emery Hartz
Manager, Marketing & Product Development
U.S. Green Building Council
Mon, Aug 19, 2013
Complete LEED-EBOM Gold Project Documents on LEEDuser - by Tristan Roberts
Tue, Aug 13, 2013
I am also an independent LEED
in New USGBC Membership Fee Structure
59 Brad Miller
Principal
Environnmental Concepts Company
Tue, Aug 6, 2013
RE: Allowed but not necessarily advisable
in Can you register a project for LEED CI after construction has been completed?
8 Mary Ostafi
Sustainability Specialist
HOK
Wed, Jul 24, 2013
RE: Technical Manual for new Green Globes for New Construction
in The Hidden Beltway Lobbyists Who Shape Green Building Policy
20 Paula Melton
Managing Editor
BuildingGreen, Inc.
Thu, Jul 11, 2013
RE: Embolden ACC?
in The LEED v4 Ballot: The Case For and Against
15 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional, Guiding Principles Compliance Professional
Energy Ace
Fri, Jun 28, 2013
RE: A few comments...
in LEED v4 Public Comment Forum - LEED Takes a New Direction
97 Brian McCallister
Mon, Jun 17, 2013
First in Africa ?
in First-in-Country Projects to Get Free LEED Certification
5 Mike Barker
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
Wed, Jun 12, 2013
RE: Can't select "other" in space usage type drop down
in Filling out Space Usage Type
19 Erica Downs
Sustainability & LEED Consultant
Tue, Nov 5, 2013
RE: Timeline for CIR responses from GBCI
in How long for CIR responses?
8 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 3, 2013
RE: BD&C Exam Prep
in Earn CEUs on LEEDuser—With Ease
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jun 12, 2013
RE: new database
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
27 Elizabeth Thompson
LEED Specialist
USGBC
Mon, Apr 29, 2013
New USGBC searchable database..
in Key LEED Interpretations
4 Lewis Hewton
Cundall
Thu, Jul 3, 2014
Partial interior fit-out
in LEED CI - Is there a minimum tenant rennovation scope?
10 Mariela Garate Clarke
Architect
Green Building Council Chile
Thu, Apr 4, 2013
RE: Guardbooth
in Site Boundary
69 RIM Architects
RIM Architects
Mon, Nov 4, 2013
LEED-CI Silver Office Documentation Available on LEEDuser - by Tristan Roberts
Tue, Mar 26, 2013
RE: Stairs
in Does underground parking count for certification fees?
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 22, 2013
RE: LEED GA and LEED AP exam changes
in Do you have questions for GBCI?
44 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 21, 2013
RE: LEED AP v4
in LEED NC 2009 (v3) Professional Credentials
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 18, 2013
Title Votes Comments Most Recent Post
Issue -
in CI-2009 IEQp1: Minimum IAQ Performance
275 131 Green Living LLC Elizabeth Gharib
Fri, Jan 22, 2010
RE: Pin-based CFL's
in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps
275 143 Jenny Carney
Principal
YR&G
Tue, Dec 29, 2009
Areas of question
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
275 63 Green Living LLC Elizabeth Gharib
Fri, Jan 22, 2010
Using option (3) measuring lighting (%) percent
in EBOM 2009 SSc8: Light Pollution Reduction
274 103 Reynaldo Castro
Tue, Jan 19, 2010
RE: Recycling
in CI 2009 MRp1: Storage and Collection of Recyclables
274 57 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jan 21, 2010
RE: Existing bike storage and showers
in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms
274 80 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 20, 2009
RE: Existing bike storage and showers
in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms
274 80 Mara Baum
Healthcare Sustainable Design Leader, LEED Fellow
HOK
Tue, Dec 8, 2009
RE: Dormitory that is No Smoking
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
273 264 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jan 27, 2010
Flush monitoring requirements
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
273 63 Mary Davidge
Principal
Mary Davidge Associates
Wed, Jan 20, 2010
New CIRs are not precedent setting
in Upgrade to LEED 2009? How to Choose for Your Project
273 16 Lauren Sparandara
Sustainability Manager
Google
Tue, Oct 13, 2009
RE: no smoking requirements for CA projects
in CI 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
271 25 Seema Pandya
Senior Sustainability Manager
YR&G sustainability
Mon, Nov 9, 2009
M&V and metering
in NC 2009 EAc5: Measurement and Verification
270 195 Emil Cuevas
Wed, Nov 18, 2009
CI IEQ p1 ASHRAE 62.1-2007 calculator
in CI-2009 IEQp1: Minimum IAQ Performance
270 131 dave montgomery
Wed, Oct 14, 2009
On Site Renewable Energy
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
270 91 Ben Stanley
Sustainability Manager
YRG sustainability
Mon, Jan 25, 2010
What about leased products?
in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods
269 80 D. G.
Thu, Jan 21, 2010
RE: Option B and D
in NC 2009 EAc5: Measurement and Verification
268 195 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Wed, Jan 27, 2010
RE: Off Site Renewable Energy
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
268 91 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Tue, Jan 12, 2010
Grabbing a non-contiguous park
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
268 205 Lauren Sparandara
Sustainability Manager
Google
Mon, Feb 1, 2010
Calculating FTE/Transients for Hospital environments
in NC 2009 WEc3: Water Use Reduction
266 98 Lauren Sparandara
Sustainability Manager
Google
Mon, Feb 1, 2010
RE: When does the Performance Period Start?
in EBOM 2009 SSc1: LEED Certified Design and Construction
266 37 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Tue, Jan 19, 2010
Title Comments Most Recent Post
Water Performance Measurement Innovation approach for BD+C
in NC 2009 IDc1: Innovation in Design
525 Courtney France
Tue, Aug 5, 2014
Is groundwater ok for Wec2?
in NC 2009 WEc2: Innovative Wastewater Technologies
113 Alexander Marquez
Tue, Aug 5, 2014
Common Preferred Parking Signage at Car Park Entrance
in CS 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
79 First Last
Tue, Aug 5, 2014
Required Vegetated Area
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
205 CT G
Mon, Aug 4, 2014
Invase Plant Species and Sprays
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
72 Sara Zoumbaris
Mon, Aug 4, 2014
Which LEED Rating Category?
in LEED Rating System Selection Q&A
602 Jay Murray
LEED Administrator
Commercial Construction Consulting
Mon, Aug 4, 2014
No parking
in CS v4: Reduced parking footprint
1 MM K
Mon, Aug 4, 2014
LEED site definition
in PIf2: Project Summary Details
4 Jie Xiong
Mon, Aug 4, 2014
Outdoor air monitoring through BMS
in NC 2009 IEQc1: Outdoor Air Delivery Monitoring
240 LEED Consultant
Green Building and Alternative Energy
Sat, Aug 2, 2014
lansdcape water calculation montly/daily and rainwater
in NC 2009 WEc1: Water Efficient Landscaping
353 EBRU UNVER
LEED AP BD+C
Fri, Aug 1, 2014
Rainwater reuse for irrigation and flush discharges
in NC 2009 WEc1: Water Efficient Landscaping
353 Pedro Ribeiro
Director of Sustainability
Edifícios Saudáveis Consultores
Fri, Aug 1, 2014
Green Roof Plant overhang
in NC 2009 SSc7.2: Heat Island Effect—Roof
261 John Covello
LEED AP BD+C, EBOM, LEED and Sustainability Manager
Development Management Group
Thu, Jul 31, 2014
Storage for "Peak Visitors"
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
239 Ryan McEvoy
Owner
Gaia Development
Thu, Jul 31, 2014
University Campus Transit
in NC-v4: Access to quality transit
3 Rebecca Brown
Thu, Jul 31, 2014
No "new" parking, or "Not any" parking??
in Retail–CI-v2009: Alternative transportation
4 Erica Downs
Sustainability & LEED Consultant
Thu, Jul 31, 2014
Batteries Required?
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
80 Sara Zoumbaris
Wed, Jul 30, 2014
Streetside landscaped but not trees
in Pilot Credit 14: Walkable Streets
76 Trinidee Shelton
Wed, Jul 30, 2014
.
in MPR2: Must be a complete, permanent building or space
1 Suhaas Mathur
SGS India Private Limited
Wed, Jul 30, 2014
Security Fence Entry the Main Building Entrance?
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
239 Mary Kay
Project Coordinator
Gray Construction
Tue, Jul 29, 2014
Sustainable Site Prereq 2.1 Site Assessment NCv4 SSc1
in Hospitality-NC-v4: Site assessment
1 Tyra Sorensen
Tue, Jul 29, 2014

Copyright 2014 – BuildingGreen, Inc.