LEEDuser Forum

The following discussions are happening right now all around our LEED credit forums. If you don't find what you're looking for below, check our LEED credit menu or the list of hot discussion topics to the right.

Title Comments Most Recent Post Location
Change the LEED AP person during the project
in CS 2009 IDc2: LEED Accredited Professional
13 Nándor Kovács
Sustainability Team Leader
Obuda-Ujlak Zrt.
Thu, Apr 10, 2014
RE: Pilot Credit 43... How many projects have attemped this credit?
in Pilot Credit 43: Certified Products
22 Ashley Nedza
Project Designer, LEED AP BD+C
Baskervill
Wed, Apr 9, 2014
RE: Air compressors
in Healthcare-v2009: Water use reduction - building equipment
2 Kim Shinn
Principal
TLC Engineering for Architecture
Mon, Apr 7, 2014
RE: Tables titles missing
in ND-v2009: Agricultural land conservation
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, Apr 3, 2014
RE: LEED-ND v2009 Sunset
in LEED v4 Overwhelmingly Approved by USGBC Members
39 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Wed, Apr 2, 2014
RE: LEED NC 2009 MRc2 - Co-mingled Waste Recycing
in NC v2.2 MRc2: Construction Waste Management
110 Ian McCall
Environmental Engineer
Tue, Mar 22, 2016
RE: Historic building.... in progress
in ND-v2009: Historic resource preservation and adaptive use
4 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Sat, Mar 29, 2014
RE: acrylic with non paper backer
in Homes-v4: Durability management
2 Ann Edminster
founder/principal
Design AVEnues LLC
Fri, Mar 28, 2014
RE: Working hours and daylight
in NC v2.2 EQc8.1: Daylight and Views—Daylight 75% of Spaces
169 Todd Reed
Daylight Designer
7group
Tue, Mar 22, 2016
RE: Late Start
in Hospitality-NC-v4: Integrative process
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, Jan 27, 2017
RE: Timing of survey?
in ND-v2009: Imperiled species and ecological communities conservation
6 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Fri, Mar 21, 2014
Insulating Concrete Forms
in Pilot Credit 20: Recycled Content for Non-Structural Materials
11 Amy Van Dam
Sustainable Design Coordinator
Boulder Associates Architects
Thu, Mar 13, 2014
RE: Appropriate use of Core and Shell?
in PIf5: Building System Control
10 John Beeson
Green Mystic in Residence
Catalyst Partners
Thu, Mar 17, 2016
RE: EAc4 calculator vs online template
in NC v2.2 EAc4: Enhanced Refrigerant Management
22 Amy Harmon
Scheeser Buckley Mayfield
Tue, Mar 22, 2016
RE: Why the USA Today Article Misses the Point
in USA Today Story on LEED Misses the Mark
33 Bill Ford
Architect
WLFA Associates
Mon, Mar 10, 2014
SSc1 documents for International Projects
in Determining Farmland or Floodplain Classification for SSc1
17 Saud Abdul Rasheed
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
Sun, Mar 9, 2014
RE: a LEED-NC V2.2 three-story mixed use building
in NC v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
54 Michelle Rosenberger
Partner
ArchEcology, LLC
Tue, Mar 22, 2016
Renovate an old school
in Schools-EBOM-v4: Must comply with project size requirements
1 Davide Filippi
Wed, Feb 12, 2014
RE: LEED -NC 2009 for Retail, MRp1
in Retail–NC-v2009: Storage and collection of recyclables
2 Webly Bowles
Associate Principal
Green Building Services
Tue, Feb 4, 2014
RE: ASTM tests for BECx
in Healthcare-v2009: Enhanced commissioning
4 Susan Walter
Specifications Director
Populous
Mon, Feb 3, 2014
Title Comments Most Recent Post Location
RE: Retrofit
in Healthcare-v2009: Hazardous material removal or encapsulation (renovations only)
5 Susan Walter
Specifications Director
Populous
Wed, Jun 26, 2013
RE: Systems Required in Cx Scope
in Schools-2009 EAp1: Fundamental Commissioning of Building Energy Systems
7 John Glaeser
Fri, Dec 20, 2013
RE: Pilot credit
in ND-v2009: Innovation and exemplary performance
2 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Thu, May 30, 2013
RE: Regional Credits in Canada?
in Healthcare-v2009: Regional priority
2 Susan Walter
Specifications Director
Populous
Fri, May 3, 2013
RE: Clarifications
in Healthcare-v2009: Construction activity pollution prevention
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Mon, Apr 22, 2013
RE: Recycling Design Guidelines for large projects
in ND-v2009: Solid waste management infrastructure
7 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Apr 16, 2013
RE: ND standard vs the NC standard
in ND-v2009: Construction activity pollution prevention
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, Mar 28, 2013
PC 26 Advanced Energy Metering - Feedback
in Pilot Credit 26: Advanced Energy Metering
17 SOFIA KESIDOU
Mon, Mar 18, 2013
PC 25 Water Metering and Reporting - Feedback
in Pilot Credit 25: Water Metering & Reporting
8 SOFIA KESIDOU
Mon, Mar 18, 2013
RE: Area rugs / Loose mats
in NC v2.2 EQc4.3: Low-Emitting Materials—Carpet Systems
29 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Tue, Mar 22, 2016
RE: LEED AP working from an other city
in Retail–CI-v2009: LEED Accredited Professional
4 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sat, Feb 9, 2013
RE: buidable land
in ND-v2009: Steep slope protection
8 Noriko Yasuhara
Woonerf Inc.
Wed, Feb 6, 2013
RE: Credit availability
in Pilot Credit 48: Discovery—Analysis to Support Integrative Process
4 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sun, Feb 3, 2013
RE: Water Bodies
in Schools 2009 SSc1: Site Selection
13 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, Jan 31, 2013
IAQ Procedure contaminant testing - costs and concerns
in Pilot Credit 68: Indoor air quality procedure - alternative compliance path
1 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Thu, Mar 2, 2017
RE: Document review
in Schools-2009 EAc3: Enhanced Commissioning
2 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Dec 20, 2013
RE: GIBp1
in ND-v2009: Certified green buildings
8 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Mon, Dec 3, 2012
RE: MPR6
in Retail–NC-v2009: Measurement and verification
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, Nov 22, 2012
RE: Call-a-Ride as compliant public transport
in Schools 2009 SSc4.1: Alternative Transportation—Public Transportation Access
14 David Posada
Integrated Design & LEED Specialist
SERA Architects
Wed, Mar 16, 2016
RE: 3D lighting model
in Pilot Credit 23: Quality Views
12 Michael E. Edmonds-Bauer
Edmonds International
Tue, Dec 11, 2012
Title Comments Most Recent Post Location
what type of document required uploading to LEED ARC
in Discuss the LEED Dynamic Plaque and Arc
9 Subrota Roy
ECORAY Sustainability & Design
Mon, May 29, 2017
Bangladesh
RE: working in certified campus
in LEED Guidance for Campuses and Multiple Buildings
590 Kath Williams
LEED Fellow 2011, Principal
Kath Williams + Associates
Fri, May 26, 2017
RE: Canadian LEED market
in LEED Canada Forum
63 Nirwair Singh Bajwa
SUSTAINABILITY SCHOLAR, LEED GREEN ASSOCIATE
STANTEC CONSTRUCTION
Fri, May 26, 2017
Canada
RE: v4 - SSc6 Project vs Lighting boundary
in Review Comments with Phantom Requirements
96 Hernando Miranda
Owner
Soltierra LLC
Wed, May 17, 2017
RE: Liability of the LEED Consultant
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
886 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Sun, May 14, 2017
RE: Overlap between LEED v4 and WELL
in WELL Building Standard Discussion Forum
76 Michael Munn
Assistant Project Manager, LEED AP BD+C, WELL AP
The Green Engineer, Inc.
Fri, May 12, 2017
RE: LEED V4 -Healthcare Or NC
in LEED Rating System Selection
831 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, May 5, 2017
RE: n/a
in Forum for LEED Volume Program Certification
14 Stefanie Young
Director, Technical Solutions
USGBC
Fri, May 5, 2017
RE: Non-default Historical Occupancy Rate for Hotel Project
in Calculating FTEs
217 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, May 4, 2017
RE: Green Globes CIEB Technical Reference Manual?
in Green Globes Discussion Forum
11 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, May 4, 2017
RE: ACP for Certified Wood vs Pilot for Legal Wood
in International Projects - alternative compliance path
171 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, May 4, 2017
RE: Increasing certification level after accepting certification?
in United States
2 Kristina Bach
Sustainability Specialist
HGA Architects and Engineers
Thu, Apr 27, 2017
RE: CARB and ECO-Certified
in New Rules for Formaldehyde in IEQc4.4
10 Jennifer Preston
Thu, Apr 20, 2017
SITES Discussion Forum - by Tristan Roberts
Wed, Apr 19, 2017
Parksmart Discussion Forum - by Tristan Roberts
Wed, Apr 19, 2017
Future-proofing LEED certification - Iran
in LEED Certified or Certifiable? Architects Make the Case for Earning the Plaque
10 Meike Borchers
Technical Director
WSP UK
Wed, Apr 19, 2017
Iran
RE: Arc Platform
in Performance Period
58 Batya Metalitz
Technical Director, LEED
USGBC
Thu, May 4, 2017
RE: advanced buildings doc
in Where can I find a copy of "Advanced Buildings: Energy Benchmark for High Performance Buildings (E-Benchmark)”?
19 Erik Heck
Thu, May 4, 2017
RE: Qualified Energy Rater for v4
in LEED for Homes (LEED-H) Forum
165 Steve Loppnow
Sustainability Manager
YR&G
Thu, May 4, 2017
RE: Sunset date for v3 certification
in LEED 2009 Registration Extended to October 2016
141 Alicja Bieszyńska
Skanska
Thu, Jan 26, 2017
Title Comments Most Recent Post Location
Smoking areas in places of congregation or pedestrian traffic
in CS 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
56 Kate Mendoza
Thu, Jun 11, 2015
Appying the requirements in a High Rise
in Pilot Credit 78: Design for active occupants
142 Donald Green
Operations Manager
ai Design Group
Wed, Jun 10, 2015
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Mon, Jun 8, 2015
United States
Conditions for site fence
in NC 2009 SSp1: Construction Activity Pollution Prevention
308 Julian Bork
Wed, Jun 3, 2015
Germany
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Tue, Jun 2, 2015
United States
Entryway Systems Location
in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control
468 Trina Hernandez
Architect
RSP
Mon, Jun 1, 2015
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)
in NC 2009 IEQc7.1: Thermal Comfort—Design
266 Ed Kokosa
MSKTD and Associates
Mon, Jun 1, 2015
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Mon, Jun 1, 2015
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 27, 2015
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 27, 2015
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 27, 2015
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 27, 2015
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 27, 2015
United States
RE: Canadian LEED market
in LEED Canada Forum
63 Nirwair Singh Bajwa
SUSTAINABILITY SCHOLAR, LEED GREEN ASSOCIATE
STANTEC CONSTRUCTION
Wed, May 27, 2015
Canada
90% controls for open office systems furniture
in CI 2009 IEQc6.1: Controllability of Systems—Lighting
55 Brian VanAllen
Electrical Designer
Powell and Hinkle Engineering
Wed, May 27, 2015
United States
initial fit-out vs alteration?
in PIf2: Project Summary Details
1 Andrew Bennett
intern architect
WSA
Tue, May 26, 2015
United States
Campus Project
in Pilot Credit 14: Walkable Streets
147 Sara Curlee
Project Architect
BWBR
Tue, May 26, 2015
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 26, 2015
United States
RE: Commercial Coffee Brewers
in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances
328 Marcus Sheffer
LEED Fellow
7group
Mon, May 25, 2015
RE: Concrete Formwork
in CS 2009 MRc5: Regional Materials
38 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Sat, May 23, 2015
Title Comments Post date Most Recent Postsort icon Location
VOC for fire proofing / intumescent sealants
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
553 Stacey Olson
Associate, LEED AP, ID+C, BD+C, CID
Gensler
Tue, Aug 30, 2016
2016-08-30 13:40 United States
Baseline HVAC system modeling
in NC 2009 EAp2: Minimum Energy Performance
4,010 Pedro Ribeiro
Director of Sustainability
Edifícios Saudáveis Consultores
Tue, Aug 30, 2016
2016-08-30 11:34 Portugal
Free waste heat
in CS v4: Minimum energy performance
42 sergio arus
Green Energy Expert & HVAC
SWECO
Tue, Aug 30, 2016
2016-08-30 10:16 Sweden
Faucet Flowrate at Actual Water Supply Pressure
in CS 2009 WEp1: Water Use Reduction—20% Reduction
226 Ran Zhang
Project Manager
JLL
Tue, Aug 30, 2016
2016-08-30 04:11 China
Faucet Flowrate at Actual Water Supply Pressure
in CI 2009 WEp1: Water Use Reduction—20% Reduction
261 Ran Zhang
Project Manager
JLL
Tue, Aug 30, 2016
2016-08-30 03:48 China
Glass skylights and existing roof
in NC-v4: Heat island reduction
42 Jonathan Hickerson
Architectural and Brand Strategist
EDA Architects
Mon, Aug 29, 2016
2016-08-29 13:28 United States
MBCx scope for LEED-CI
in CI-v4: Enhanced commissioning
6 Mark Benson
Mon, Aug 29, 2016
2016-08-29 13:24 United States
Crawl Space Inquiry
in PIf2: Project Summary Details
257 Sara Zoumbaris
Sustainable Design Consulting
Mon, Aug 29, 2016
2016-08-29 11:50 United States
Bus shuttle Service to previous location
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
306 Doreen Kruschina
Doreen Kruschina Planung+Baumanagement
Mon, Aug 29, 2016
2016-08-29 08:39 Germany
Satisfaction rating
in EBOM 2009 IEQc2.1: Occupant Comfort—Occupant Survey
63 Fareed Alghimlas
Senior Research Associate
Kuwait Institute for Scientific Research
Mon, Aug 29, 2016
2016-08-29 04:20 Kuwait
Survey Participants
in EBOM 2009 IEQc2.1: Occupant Comfort—Occupant Survey
63 Fareed Alghimlas
Senior Research Associate
Kuwait Institute for Scientific Research
Mon, Aug 29, 2016
2016-08-29 04:17 Kuwait
questions about additional HVAC system in kitchen
in CS 2009 EAp2: Minimum Energy Performance
1,170 Zhang Peng
CADG
Sun, Aug 28, 2016
2016-08-28 23:50 China
new building
in MPR2: Must be a complete, permanent building or space
227 Bo Slendak
Owner, C.O.O.
Delta Engineering Group LLC
Fri, Aug 26, 2016
2016-08-26 20:32 United States
Church+Classrooms = Office?
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
128 Charles Shinneman
Director of Optimization
Capital Engineering Consultants, Inc.
Fri, Aug 26, 2016
2016-08-26 18:08 United States
EPDs covering several product series
in NC-v4: Building product disclosure and optimization - environmental product declarations
113 Jean DesRosiers
vice president
Vertima Inc
Fri, Aug 26, 2016
2016-08-26 15:37 Canada
German Energy Saving Law Certificate as Submittal
in NC 2009 EAc1: Optimize Energy Performance
1,346 Dandan Li
LEED AP
Fri, Aug 26, 2016
2016-08-26 11:52 Germany
If bare raised floor is covered with carpet - is it reused?
in CI-v4: Interiors life-cycle impact reduction
12 Diana Nezamutinova
Consultant
Self Employed
Fri, Aug 26, 2016
2016-08-26 09:34 United Kingdom
Calculator Points clarification
in Pilot Credit 102: Legal Wood
22 Francis McNulty
OCSC
Fri, Aug 26, 2016
2016-08-26 08:07 Ireland
Purchasing- Ongoing
in EBOM-v4: Purchasing - ongoing
13 VISHESH AGARWAL
Fri, Aug 26, 2016
2016-08-26 06:08 India
Option-3: Irrigation Meter Installed
in EBOM-v4: Outdoor water use reduction
15 VISHESH AGARWAL
Fri, Aug 26, 2016
2016-08-26 01:17 India

Copyright 2017 – BuildingGreen, Inc.