LEEDuser Forum
There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!
| Title | Comments | Most Recent Post |
|---|---|---|
| Paperless Submittals | - |
by Bruce Maine Thu, Aug 5, 2010 |
|
tenant scope in Which area applies to a CI certification, especially according to shared (non-rented) areas |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Aug 5, 2010 |
|
RE: LEED Reference Guide in Reference Guide |
2 |
Paul C Tue, Aug 3, 2010 |
|
upgrading to LEED 2012 and fees in Project Registration |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Aug 3, 2010 |
|
Hopefully eliminating the CBs will raise the quality of reviews in Clarification overkill |
1 |
Nadav Malin USGBC LEED Faculty, President BuildingGreen, Inc. Mon, Aug 2, 2010 |
|
RE: RE: residential high rise: leed rating system selection in residential high rise: leed rating system selection |
4 |
stefano sani Fri, Jul 30, 2010 |
|
a good thing but not a LEED thing in Possible points for reducing project scope? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Jul 29, 2010 |
|
RE: KEMA Services in Recommendations for companies that perform ASHRAE Level I Energy Audit around the Sacramento area? |
2 |
Andy Rhoades Partner Leading Edge Consulting Tue, Jul 27, 2010 |
|
RE: good question in credit stats |
2 |
Natesan Seshagiri Architect Tue, Jul 27, 2010 |
|
EBOM changes explored in more depth in July 2010 LEED Addenda Published by USGBC |
17 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Jul 27, 2010 |
|
RE: Construction phase in Changes after Design Submittal |
2 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Tue, Jul 27, 2010 |
|
RE: Manufactured Offices? in ASHRAE 90.1- 2.3 |
2 |
Jun Hashimoto RLA, LEED-AP Mon, Jul 26, 2010 |
|
RE: Length of construction project in EBOM or NC? When is it too late to utilize the NC rating system? |
2 |
Thomas Boyd MEP Construction Manager Tonn and Blank Construction, LLC Sat, Jul 24, 2010 |
|
RE: Also, fees... in Switching from NC to EB |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 24, 2010 |
|
RE: LEED for Healthcare date in Healthcare |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 24, 2010 |
|
looking for this in LEED Reference Guides in MRc4 Referenced Standards : FTC vs. ISO |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 24, 2010 |
|
From the current FAQ located in About Regional Priority Credits |
1 |
Tim Rogers Designer The Clark Enersen Partners Wed, Jul 21, 2010 |
| Energy Plus or EQuest | - |
by Billy Ng Fri, Jul 23, 2010 |
| New Unlocked LEED Checklists from USGBC | - |
by Tristan Roberts Mon, Jul 19, 2010 |
|
ERB-approved in How to get certified to teach a CEU? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 19, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
105 |
Todd Reed Daylight Designer 7group Thu, May 23, 2013 |
|
Interior Places of Respite in Healthcare-v2009: Connection to the natural world - places of respite |
3 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Thu, May 23, 2013 |
|
RE: CalGreen and LEED Requirements for SSc4.3 in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
213 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
252 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Thu, May 23, 2013 |
|
RE: Exterior Lighting for Baseline in NC 2009 EAp2: Minimum Energy Performance |
1,364 |
Marcus Sheffer LEED Fellow 7group Thu, May 23, 2013 |
|
RE: WC's in CS 2009 WEp1: Water Use Reduction—20% Reduction |
159 |
OSCAR DE LA RED LEED AP BD+C PROMEC Thu, May 23, 2013 |
|
RE: VOCs emissions after given number of days in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
63 |
Josh Jacobs Technical Information & Public Affairs Manager UL Environment Thu, May 23, 2013 |
|
RE: HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
367 |
SW LEE LEED AP Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
119 |
Jim Park Project Manager EAN Technology Wed, May 22, 2013 |
|
RE: Same firm as sub-contractor and CxA in NC 2009 EAc3: Enhanced Commissioning |
172 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
7 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
RE: Streamlined Path in NC 2009 SSc7.2: Heat Island Effect—Roof |
164 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Wed, May 22, 2013 |
|
RE: Exterior Envelope Commissioning in NC 2009 IDc1: Innovation in Design |
367 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
RE: Exterior window shades controllability in Healthcare-v2009: Controllability of systems - lighting |
2 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Roofing Adhesives, Sealants & Mastics in Healthcare-v2009: Low-emitting materials |
3 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Number of testing point in Healthcare-v2009: Construction IAQ management plan - before occupancy |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: List of approved LEED modeling Software in NC 2009 EAc1: Optimize Energy Performance |
819 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
265 |
Joel McCreary Principal McCreary/Snow Architects, PA Wed, May 22, 2013 |
|
RE: Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
171 |
Larissa Oaks Specialist, LEED USGBC Wed, May 22, 2013 |
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
33 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 22, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
RE: Resubmit After Dening in Review Appeal |
24 |
Jim Park Project Manager EAN Technology Thu, May 23, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
RE: Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Peggy White White + GreenSpec Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
45 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
|
RE: MRc4 recycled content---recovered fiber in MR Credit 4- Recycled Content |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 21, 2013 |
|
RE: Project Participation in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
42 |
USGBC IP Account Tue, May 21, 2013 |
|
RE: LEED Online with Internet Explorer 10 in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
333 |
Megan Koehler KMD Architects Mon, May 20, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Performance Period starts after construction in Performance Period |
40 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 16, 2013 |
|
RE: (Jacob) Calculating for Future Growth in Calculating FTEs |
135 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 14, 2013 |
|
RE: about that working group.... in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Mon, May 13, 2013 |
|
RE: Cannot login to LEED Online.. in Living with LEED Online - quirks, bugs and hiccups |
103 |
Francisca Herrera Miranda & Nasi Mon, May 13, 2013 |
|
RE: V4 implementation and '09 phase out in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 10, 2013 |
|
RE: Master Site and different buidings certifications in New LEED Guidance for Campuses and Multiple Buildings |
318 |
Eric Anderson Technical Customer Service Specialist GBCI Fri, May 10, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
RE: BD&C Exam Prep in Earn CEUs on LEEDuser—With Ease |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 30, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
SCAQMD Rule #1113 in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings |
51 | 78 |
Melissa Wrolstad Wed, Mar 16, 2011 |
|
RE: Energy Star Partner in EBOM 2009 EAc1: Optimize Energy Efficiency Performance |
51 | 96 |
Jenny Carney Principal YR&G Mon, Aug 16, 2010 |
|
RE: Performance Period in EBOM 2009 SSc8: Light Pollution Reduction |
51 | 82 |
Dan Ackerstein Principal Ackerstein Sustainability, LLC Mon, Aug 30, 2010 |
|
RE: Idea Paint-Dry Erase Paint in CI 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
51 | 63 |
Leslie Jones Interior Designer FOX Architects Tue, Sep 7, 2010 |
|
RE: Calculating Transient Occupants for a K-5 elementary school in Schools 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
51 | 28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Aug 29, 2010 |
|
RE: Re: Wellness Seminar in LEED-CI Certification: Insights to Success |
51 | 4 |
Ingrida Martinkus Associate, LEED BD+C tvsdesign Mon, Oct 25, 2010 |
|
RE: Pilot Credits and Old Rating Systems in Using the LEED Pilot Credit Library |
51 | 23 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Oct 7, 2010 |
|
LEED AP as well as ehnanced CxA in NC v2.2 EAc3: Enhanced Commissioning |
51 | 43 |
Banafsheh Shobeiri Sustainable Engineering Group Leader Hyder Consulting Middle East Sun, Oct 23, 2011 |
|
RE: What should USGBC do with the extra time to ensure success? in LEED 2012 Postponed to 2013, Renamed LEED v4 |
51 | 28 |
Randall Muir Corporate LEED Sustainability Manager RMA Land Construction Tue, Jun 5, 2012 |
|
RE: What should USGBC do with the extra time to ensure success? in LEED 2012 Postponed to 2013, Renamed LEED v4 |
51 | 28 |
Russell Perry Vice President SmithGroupJJR Wed, Jun 13, 2012 |
|
RE: School Mini-buses in Schools 2009 SSc4.4: Alternative Transportation—Parking Capacity |
51 | 19 |
Omar Katanani Wed, Sep 22, 2010 |
|
RE: Controllability of Systems in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
51 | 22 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Tue, Aug 17, 2010 |
|
Credit points??? in Comment on the New LEED Rating System Draft to be Released in 2012 |
51 | 97 |
Bill Swanson PE, LEED AP Integrated Architecture Mon, Nov 8, 2010 |
|
RE: Is there a dead line to use LEED 2.2? in Upgrade to LEED 2009? How to Choose for Your Project |
51 | 13 |
Susan Di Giulio Project Manager Zinner Consultants Mon, Mar 14, 2011 |
|
Fees? in The Future of CIRs in LEED |
51 | 6 |
Dave Intner Firmitas Architecture & Planning Wed, Feb 3, 2010 |
|
RE: VRF / VRV ASHRAE Standard 90.1-2007 ACCORDING in NC 2009 EAp2: Minimum Energy Performance |
50 | 1,364 |
Diego Escalona HVAC Engineer IDIEM Thu, Aug 23, 2012 |
|
RE: Exterior lighting on building roof surface in NC 2009 EAp2: Minimum Energy Performance |
50 | 1,364 |
Marcus Sheffer LEED Fellow 7group Mon, Sep 3, 2012 |
|
Educational Installation & Program in CI 2009 IDc1: Innovation in Design |
50 | 119 |
Alejandra Feliciano LEED AP BD+C Architects Smith Metzger Fri, Jul 30, 2010 |
|
RE: Educational Installation & Program in CI 2009 IDc1: Innovation in Design |
50 | 119 |
Kathy Buck Senior Project Manager Neumann/Smith Architecture Wed, Aug 4, 2010 |
|
RE: Confused about Exemplary vs. Innovation credits in NC 2009 IDc1: Innovation in Design |
50 | 367 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Jan 28, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Interior Places of Respite in Healthcare-v2009: Connection to the natural world - places of respite |
3 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Thu, May 23, 2013 |
|
Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
147 |
Michelle Eisenhauer Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
Healthcare Prereq 1 Fixtures and Calcs in NC 2009 WEp1: Water Use Reduction—20% Reduction |
406 |
Derek Sylvia Thu, May 23, 2013 |
|
Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
7 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
MRc4 and MRc7 in NC 2009 MRc4: Recycled Content |
265 |
Ramon Watkins Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
porous or non-porous material in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
|
Leakage Rate in v5 Form in EBOM 2009 EAc5: Enhanced Refrigerant Management |
31 |
Andy Rhoades Partner Leading Edge Consulting Mon, May 20, 2013 |
|
Rainwater collection in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
163 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
76 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Mon, May 20, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |



