LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: LEED 2012 Credit Comments
in LEED 2012 – 2nd Public Comment – Sustainable Sites (SS) Section
16 Glenn Heinmiller
IALD, LC, LEED AP, Principal
Lam Partners
Mon, Sep 26, 2011
RE: O&M Manual is the bible
in LEED AP EB O+M Exam
3 Bazeeth Ahamed Khader Mohamed Ali
Sat, Sep 24, 2011
RE: check with GBCI
in Block Team Administration
2 Brian Wolfe
Sustainable Coordinator
HKS
Thu, Sep 22, 2011
RE: Public LEED Project Directory
in LEED CI - PI form 5
2 Sheela I
Thu, Sep 22, 2011
Pilot Credit 44
in LEED Certification and Ergonomics
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Sep 21, 2011
RE: rating system and credit
in Calculating Waste Diversion Rates for a Modular Factory
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Sep 21, 2011
RE: MR Credit - Environmentally Preferable Structure and Enclosure
in LEED 2012 – 2nd Public Comment – Materials & Resources (MR) Section
46 Keith Lindemulder
Environmental Business Development- LEED AP BD&C
Nucor
Thu, Sep 15, 2011
RE: Poured concrete is not an air
in Is poured concrete an air barrier material?
3 Aaron Ashley
Thu, Sep 15, 2011
Sorry, late thread
in LEED 2012 – 2nd Public Comment – Indoor Environmental Quality (IEQ) Section
12 Jeff Chapman
EcoDesigner
Kirksey
Fri, Oct 28, 2011
Development Density and Diverse Uses - Option 3
in LEED 2012 – 2nd Public Comment – LT (Location and Transportation) Section
11 Michelle Howard
KMD Architects
Wed, Sep 14, 2011
RE: Re:Regional Priority Credit
in Regional Priority Credit
2 Sue Barnett
Principal
Sue Barnett Sustainable Design
Wed, Sep 14, 2011
Calculating Waste Diversion Rates for a Modular Factory - by Christopher Rober...
Thu, Sep 8, 2011
RE: Another question on a similar
in EBOM WEp1 and showers/showerheads
2 Alexa Stone
ecoPreserve: Building Sustainability
Wed, Sep 7, 2011
RE: LEED tenant manual
in Tenant Manual for LEED New development in Core & Shell
2 Ivan Ora
Sales Manager
Tulipan Grupa
Fri, Sep 2, 2011
Performance Period for EBOM v2 - using more than the minimum
in Performance Period LEED EBOM
2 Tyra Sorensen
Thu, Sep 1, 2011
RE: LEED definition of weatherproofing system
in "Within the Weatherproofing System" at walls
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Aug 31, 2011
RE: Good riddance
in $100M Lawsuit Against LEED Dismissed by Federal Judge
13 James Thornton
Project Manager, Commissioning Group
ccrd
Thu, Aug 18, 2011
Hard copy signatures
in Owner Required Signatory - USGBC soliciting feedback
5 Mike Barker
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
Tue, Aug 16, 2011
RE: email reviewer
in Can You Refute Credit Denial Prior To the Appeal Stage?
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Aug 9, 2011
RE: Re: Cancellation of project review
in Regarding Cancellation of project review
4 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Mon, Aug 8, 2011
Title Comments Most Recent Post
Regional Priority on this credit
in CI 2009 SSc1: Site Selection
201 Katie Peterschmidt
Associate Director, CORE Steward
Cooper Carry
Tue, Sep 2, 2014
New Review Comment
in CI 2009 IEQc7.1: Thermal Comfort—Design
48 Aaron Luthien
Tue, Sep 2, 2014
RE: Stormwater rate and quantity calculation for case 1
in NC 2009 SSc6.1: Stormwater Design—Quantity Control
208 Michael DeVuono
Senior Staff Designer
T&M Associates
Tue, Sep 2, 2014
RE: 90% of average annual runoff
in NC 2009 SSc6.2: Stormwater Design—Quality Control
156 Michael DeVuono
Senior Staff Designer
T&M Associates
Tue, Sep 2, 2014
RE: DATA Center
in NC-v4: Minimum energy performance
12 Marcus Sheffer
LEED Fellow
7group
Tue, Sep 2, 2014
RE: LEED NC 2009 for factory buildings
in NC 2009 EAp2: Minimum Energy Performance
2,349 Marcus Sheffer
LEED Fellow
7group
Tue, Sep 2, 2014
Required Lease Language
in MPR2: Must be a complete, permanent building or space
113 Katie Peterschmidt
Associate Director, CORE Steward
Cooper Carry
Tue, Sep 2, 2014
RE: Ashrae 90.1.2010, HVAC Table 6.8.1.C Water Chiling Packages Eff.
in NC 2009 EAc1: Optimize Energy Performance
1,071 Marcus Sheffer
LEED Fellow
7group
Tue, Sep 2, 2014
RE: PU foam
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
376 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Tue, Sep 2, 2014
RE: Option 3 daylight measurement
in NC 2009 IEQc8.1: Daylight and Views—Daylight
622 Todd Reed
Daylight Designer
7group
Tue, Sep 2, 2014
Engineered ventilation rates
in NC-2009 IEQp1: Minimum IAQ Performance
755 LEEDme STRATEGIE D'IMPRESA
Tue, Sep 2, 2014
Flushing toilets with drilled corrosive non potable water
in NC 2009 WEc3: Water Use Reduction
100 Viktor Reutherborg
Trainee
NCC Construction Sverige
Tue, Sep 2, 2014
RE: Green cleaning products - Saudi Arabia
in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
129 Nate Gillette
Director
Natura Architectural Consulting LLC
Mon, Sep 1, 2014
RE: On-site waste water treatment
in NC-v4: Indoor water use reduction
3 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Mon, Sep 1, 2014
Documentation if the building structure remains the same
in CS 2009 MRc1: Building Reuse—Maintain Existing Walls, Floors and Roof
19 Alexander Benning
Project Manager
ES EnviroSustain GmbH
Mon, Sep 1, 2014
minimum vegetation area
in CS 2009 WEc1: Water Efficient Landscaping
57 Agata Mozer
GO4IT SP Z OO SP K
Mon, Sep 1, 2014
RE: Parking spaces provided to project building in another garage
in CS 2009 SSc7.1: Heat Island Effect—Nonroof
49 Maria Porter
Environmental Certification Engineer
Skanska Sweden
Mon, Sep 1, 2014
Urban agriculture in high density, zero lot line project.
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
207 Nadia Ayala
Architect / LEED AP BD+C
KILTIK Consultoría
Sun, Aug 31, 2014
RE: VOC Testing - ISO EU Standard
in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings
90 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Sun, Aug 31, 2014
RE: VOC Testing - ISO EU Standard
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
449 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Sun, Aug 31, 2014
Title Comments Most Recent Post
RE: Updated documentation and resubmittal in construction phase
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
561 Charles Nepps
Tue, Sep 2, 2014
RE: LEED Dynamic Plaque--any thoughts and experiences to share?
in LEED Rating System Selection Q&A
605 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Tue, Sep 2, 2014
LEED AP - Experience required
in Start a New LEED Discussion Topic
127 Rita Barata
Mon, Sep 1, 2014
Study Guides and Practice Exams for LEED v4
in Got Technical Questions on LEED v4?
56 Cindy Davis
Associate Principal
Callison Architecture
Wed, Aug 27, 2014
RE: ACP Form
in International Projects - alternative compliance path
154 Sean Fish
Project Manager, LEED
U.S. Green Building Council
Wed, Aug 27, 2014
RE: A few comments...
in LEED v4 Public Comment Forum - LEED Takes a New Direction
98 Brian McCallister
Tue, Aug 26, 2014
Cannot upload after review comments
in Living with LEED Online - quirks, bugs and hiccups
136 Robert Wichert
Engineer
Fri, Aug 22, 2014
RE: Campus-Same master site- LEED NC v4 and LEED EBOM 2009
in New LEED Guidance for Campuses and Multiple Buildings
495 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Tue, Aug 19, 2014
RE: CARB and ECO-Certified
in New Rules for Formaldehyde in IEQc4.4
7 Nick _
Architect, LEED AP
Wed, Aug 13, 2014
RE: Thanks Tristan!
in GBCI Invites Direct Inquiries—But Do Your Homework First
19 Megan Ritchie Saffitz
Director of LEED Support
U.S. Green Building Council
Mon, Aug 11, 2014
RE: LEED Interpretation: Effective Date
in Review Comments with Phantom Requirements
89 Hernando Miranda
Owner
Soltierra LLC
Fri, Aug 8, 2014
Defering Design credit
in Defer Credits
4 Stella Stella
Thu, Aug 7, 2014
RE: hotel with restaurant
in Calculating FTEs
184 LEEDme STRATEGIE D'IMPRESA
Mon, Aug 4, 2014
RE: plaque presentation
in 17 critical—and misunderstood—LEED terms
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jul 31, 2014
RE: LEED Volume Program - Submittal Guidance
in Forum for LEED Volume Program Certification
7 Ashley Catlett
USGBC/GBCI
Wed, Jul 30, 2014
RE: LEED AP BD+C V4
in Experience Requirement Loosened for LEED v4 AP Exam
12 Filipe Boni
Brain
Wed, Jul 23, 2014
RE: Project Registration Required
in A New, More Accessible LEED Online for LEED v4
10 Megan Sparks
Manager, Program Integration
U.S. Green Building Council
Wed, Jul 23, 2014
RE: LEED v4 Green Associate
in 10 Tips for Passing the LEED Green Associate Exam
57 Tonima Ferdous
Thu, Jul 17, 2014
RE: Large footage residence and threshold adjustment
in LEED for Homes (LEED-H) Forum
131 Ann Edminster
founder/principal
Design AVEnues LLC
Tue, Jul 8, 2014
RE: Licensed Professional Exemption (LPE) - outside of USA
in Licensed Professional Exemption
19 Sylvain laporte
GASD-Co
Tue, Jul 8, 2014
Title Votes Comments Most Recent Post
RE: EAp2 v EAc1
in Required Signatories in LEED Online Forms
71 66 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Feb 17, 2011
RE: LEED CS ID Path 1 - Legally binding performance criteria
in CS 2009 IDc1: Innovation in Design
71 47 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Apr 5, 2012
A Learning Center to Support Farming on Prime Farm Land
in NC 2009 SSc1: Site Selection
71 94 Brooks Critchfield
Principal
Open Field Designs, Inc.
Fri, Jul 8, 2011
RE: Submit a review
in Registering Projects
71 17 Yuan Yuan
Bureau Veritas
Wed, Oct 27, 2010
RE: MERV 8 filtration
in NC v2.2 EQc3.1: Construction IAQ Management Plan—During Construction
71 19 Allison Beer McKenzie
Architect, Director of Sustainability
SHP Leading Design
Mon, Aug 30, 2010
M&V Plan - Questions
in CS 2009 EAc5.1: Measurement and Verification—Base Building
71 94 Omar Katanani
Wed, Aug 25, 2010
RE: Outside of the US
in CS 2009 EAc6: Green Power
71 68 Lana Carmichael
Director of Business Development- Green Building Team Leader
Renewable Choice Energy
Thu, Oct 21, 2010
RE: Contractor Initials
in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
71 79 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Sep 8, 2010
RE: Incorrect payback period
in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis
71 55 Pierce Holstrom
Director of Engineering
Environmental Building Strategies
Wed, Aug 11, 2010
Chemical Concentrates and Portion-Controlled Dilution
in EBOM 2009 IEQc3.1: Green Cleaning—High Performance Cleaning Program
71 25 John Ida
President
Urban Works, Inc.
Mon, Aug 23, 2010
CFCs vs HCFCs
in EBOM 2009 EAp3: Fundamental Refrigerant Management
71 63 Zachary Goodnough
Fri, Feb 11, 2011
RE: LEED NC - MPR #2
in LEED Minimum Program Requirements
71 440 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Sep 24, 2010
MPR #2: Horizontally attached building
in LEED Minimum Program Requirements
71 440 Aditi Padki
Project Architect, LEED AP BD+C
Wed, Mar 28, 2012
RE: Precast concrete for LEED
in NC v2.2 MRc4: Recycled Content
71 148 Nowfal Kunju Muhammed
Energy Engineer
Middle East Centre for Sustainable Development
Sun, Dec 25, 2011
RE: Precast concrete for LEED
in NC v2.2 MRc4: Recycled Content
71 148 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Mon, Nov 26, 2012
RE: Including "Dry Gardens" in Design Case
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
71 81 Gary Ashford
Architect
Duket Architects Planners
Wed, Sep 8, 2010
Commissioning Authority was hired in 65% of Construction Docs.
in NC v2.2 EAc3: Enhanced Commissioning
71 51 Tysa Tenebro
Mon, May 10, 2010
RE: Commissioning LEED Submittal
in NC v2.2 EAc3: Enhanced Commissioning
71 51 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Tue, Feb 22, 2011
RE: Owner as Cx Agent
in NC v2.2 EAc3: Enhanced Commissioning
71 51 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Tue, Jun 21, 2011
Clarification for credit application
in Pilot Credit 27: Reconcile Projected and Actual Energy Performance
71 17 Monu Goyal
Environmental Engineer
Metadesign Architects Pvt. Ltd.
Thu, Jun 30, 2011
Title Comments Most Recent Post
Too small?
in LEED Minimum Program Requirements
440 Jason Biondi
Managing Director
Energy Cost Solutions Group
Tue, Feb 7, 2012
Regularly Occupied Space in Core & Shell for office buildings
in Filling out Space Usage Type
19 Eileen Hughes
Perkowitz+Ruth Architects
Tue, Feb 7, 2012
Utility Company Project
in NC 2009 EAc6: Green Power
137 Librarian Librarian
Librarian
Lord, Aeck & Sargent
Tue, Feb 7, 2012
Does this qualify for joint LEED certification
in LEED Rating System Selection Q&A
605 Steve Khouw
Principal
DNA GreenDesign
Tue, Feb 7, 2012
Recent multi family residential review
in NC v2.2 EQp1: Minimum IAQ Performance
56 Rachel Nicely
Tue, Feb 7, 2012
Min OA rate of a VAV syts with DCV
in NC-2009 IEQp1: Minimum IAQ Performance
755 Chellapillai Srinivasan
LEED Accrediated Professional
Tue, Feb 7, 2012
Documenting Waste Management on LEEDonline forms
in NC 2009 MRc2: Construction Waste Management
326 angela cardwell
Mon, Feb 6, 2012
MPR rev.#2 on Vertically Attached Buildings
in LEED Minimum Program Requirements
440 Antony Ho
Mon, Feb 6, 2012
RE: Table PIf 3-1
in Project Information form
45 Luis Miguel Diazgranados
Green Factory
Fri, Nov 18, 2011
LEED for Homes - OPR ?
in LEED for Homes (LEED-H) Forum
131 Mike Barker
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
Tue, Oct 11, 2011
IEQc5
in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
29 Naten Maniktala
M.E. GROUP
Fri, Jul 29, 2011
Grout in Non-Ceramic Tile Adhesive Use
in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
144 Tony Dodson
Wed, Jun 1, 2011
SS Credit 7.1 - Calculating shade
in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
39 Kristine House
Calibre Engineering, Inc.
Tue, Apr 26, 2011
EA c2 Onsite Renewable output better than projected
in NC v2.2 EAc2: On-Site Renewable Energy
43 Karen Joslin
principal
Joslin Consulting
Wed, Apr 20, 2011
RE: PVC Welding compared to adhesive primer for plastic
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
376 Carrie Bradley
Mon, Apr 18, 2011
Deviation from Default TSS Removal Efficiency
in NC 2009 SSc6.2: Stormwater Design—Quality Control
156 Rich Gifaldi
Sustainability Manager
USACE
Mon, Apr 18, 2011
Waterfront sites
in Site Boundary
69 James Weingarten
Electrical Designer
MEP Associates
Thu, Apr 14, 2011
Recertification
in Recertification
58 Simon S.
SL+A International, Taipei
Sun, Apr 10, 2011
RE: are mixed use projects allowed?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
95 Katrina Rosa
Owner
The EcoLogic Studio
Thu, Apr 7, 2011
How does LEED view buildings designed per UFC?
in NC 2009 EAc1: Optimize Energy Performance
1,071 Kevin O'Brien
Mechanical Engineer
Atlantic Design Group
Tue, Apr 5, 2011

Copyright 2014 – BuildingGreen, Inc.