LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: rating system selection forum
in LEED CI - Minimal TI for a Large Space: Will This be Accepted?
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 9, 2011
RE: I'm tired of Henry Gifford
in LEED Story on NPR's All Things Considered
13 Eric Johnson
Principal Sustainability Project and Cost Manager
Green Future Now
Tue, Mar 8, 2011
RE: maintaining LEED certification
in Certified Building - maintaining certification for LEED v2.2 buildings
2 Pinky Khatri
Designer/Sustainability Coordinator
VBN Architects
Tue, Mar 8, 2011
Appeal documentation
in Standard Template/Format for submitting Credit Appeal and Clarification
1 Susann Geithner
Global Sustainability Manager
Predictive Service
Tue, Mar 8, 2011
DSIRE...
in Tax Credits and Incentives in California
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 7, 2011
webcast
in Energy Benchmarking in LEED-EBOM Webinar
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 3, 2011
RE: context
in Major Renovation - Definition
2 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Mon, Feb 28, 2011
RE: i've been a usgbc employee for almost 9 years...
in New Plaintiffs Join Amended LEED Lawsuit
24 Bill Swanson
PE, LEED AP
Integrated Architecture
Fri, Feb 25, 2011
RE: LEED for Homes Midrise (Pilot)- Baseline Building Surprises
in Pilot Credit 33: Performance of ENERGY STAR for Homes
3 alexandra ramsden
Sustainability
Rushing
Wed, Feb 23, 2011
list of required signatories
in Required Signatory
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 22, 2011
RE: "Platinum" green credential?
in LEED to Award Points for Non-LEED Credentials
6 Bill Swanson
PE, LEED AP
Integrated Architecture
Thu, Feb 17, 2011
Live Webcast: Essential tips for energy benchmarking in LEED-EBOM EAp2 and EAc1 - by Tristan Roberts
Sat, Feb 26, 2011
RE: list of required signatories
in Required Signatory
5 Peter Kennedy
LEED AP, GreenPoint Rater
Bright Green Strategies
Wed, Feb 16, 2011
Hi Rachael, I'm not
in Police Station -- how to calculate the FTE for detainees?
1 Ellen Mitchell
Sustainable Design Manager
HKS, Inc.
Fri, Feb 11, 2011
RE: parking garages and LEED
in LEED Certification for Parking Garages
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Feb 10, 2011
RE: EAc6 forum
in Purchasing REC in Appeals phase
2 Dana Dinolfo
Assistant Property Manager
Cassidy Turley
Thu, Feb 10, 2011
Forum updates make LEEDuser forum easier, more powerful - by Tristan Roberts
Wed, Feb 9, 2011
RE: Nice addition to the site
in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits
12 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Feb 9, 2011
LEED 2012 Points—or, How we’ll eventually get points - by Emily Catacchio
Mon, Aug 13, 2012
RE: Re: Vertical Garden and credits SS 5.1 & 7?
in Vertical Garden and credits SS 5.1 & 7?
2 Luis Miguel Diazgranados
Green Factory
Mon, Feb 7, 2011
Title Comments Most Recent Post
2 different system in LEED Boundary
in NC-2009 IEQp1: Minimum IAQ Performance
697 SW LEE
Project Manager
Fri, Apr 18, 2014
LEED Project boundary and adjacent road.
in MPR3: Must use a reasonable site boundary
172 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Fri, Apr 18, 2014
EP credit
in EBOM 2009 IEQc2.4: Daylight and Views
66 ethan adams
UUSC
Fri, Apr 18, 2014
template update
in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
64 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 18, 2014
LEEDuser IPM template updated
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
68 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 18, 2014
Greenhouse Program
in Schools 2009 IDc1: Innovation in Design
18 Larry Turbes
Architect
TKDA
Fri, Apr 18, 2014
RE: Dry-Fog coatings
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
416 Jonathan Clifford
LEED-AP BD+C
Blackburn Architects
Fri, Apr 18, 2014
RE: Do all units have to run at 100% OA for this credit?
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
216 Allison Beer McKenzie
Architect, Director of Sustainability
SHP Leading Design
Fri, Apr 18, 2014
RE: RH control with dew point control logic for IEQ 6.2
in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
166 Julia Weatherby
Senior Mechanical Engineer
Lindgren & Sharples, P.C.
Fri, Apr 18, 2014
RE: Control Via Software Platform
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
271 Julia Weatherby
Senior Mechanical Engineer
Lindgren & Sharples, P.C.
Fri, Apr 18, 2014
AHU system for industrial production
in NC 2009 EAc1: Optimize Energy Performance
1,010 Renaud Gay
Shanghai Pacific Energy Center
Thu, Apr 17, 2014
RE: EAc5, Option #3 = MPR #6
in NC 2009 EAc5: Measurement and Verification
176 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Thu, Apr 17, 2014
Illustrating Compliance using representative sampling?
in EBOM 2009 IEQc2.2: Controllability of Systems—Lighting
48 Ryan Hoffman
Heapy Engineering
Thu, Apr 17, 2014
EP Threshold for LEED-HC
in NC 2009 EAc6: Green Power
127 Caupolican Diaz
Sustainable Design Coordinator
SMMA
Thu, Apr 17, 2014
RE: Building Reuse off Site
in Schools-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
16 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Thu, Apr 17, 2014
RE: Wood Cladding adhesives
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
356 Jonathan Clifford
LEED-AP BD+C
Blackburn Architects
Thu, Apr 17, 2014
RE: Window Frames and Window Area
in Schools 2009 IEQc8.1: Daylight and Views—Daylight
123 Todd Reed
Daylight Designer
7group
Thu, Apr 17, 2014
RE: Project In Dubai.
in NC 2009 SSp1: Construction Activity Pollution Prevention
182 SAMER ALHMDAN
Thu, Apr 17, 2014
RE: WC for disables
in NC 2009 WEp1: Water Use Reduction—20% Reduction
543 Melissa Merryweather
Director
Green Consult-Asia
Thu, Apr 17, 2014
RE: Rainwater used for irrigation
in CS-2009 SSc6.2: Stormwater Design—Quality Control
23 Michael DeVuono
Senior Staff Designer
T&M Associates
Wed, Apr 16, 2014
Title Comments Most Recent Post
RE: USGBC Credit Library Access
in Start a New LEED Discussion Topic
93 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Fri, Apr 18, 2014
LEED CS with partially occupied building
in LEED Rating System Selection Q&A
559 alessandro speccher
senior developer
gbc italia
Fri, Apr 18, 2014
RE: hotel with cottages
in New LEED Guidance for Campuses and Multiple Buildings
468 Eric Anderson
Thu, Apr 17, 2014
RE: Adding credits between preliminary review and final review...
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
503 Kathryn West
LEED AP BD+C, O+M, Guiding Principles Compliance Professional
Energy Ace
Thu, Apr 17, 2014
RE: LEED ND _Exam
in Experience Requirement Loosened for LEED v4 AP Exam
5 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 16, 2014
RE: Low flow pre rinse spray valve in Europe
in International Projects - alternative compliance path
149 Charline Seytier
CEO, Co-owner. LEED AP BD+C
ThemaVerde, France
Mon, Apr 14, 2014
RE: Reasonale Proof that a measure is not Standard Practice
in Review Comments with Phantom Requirements
76 Hernando Miranda
Owner
Soltierra LLC
Fri, Apr 11, 2014
LEED v4 - Green Associate or AP Exam
in 10 Tips for Passing the LEED Green Associate Exam
40 Oliver Robbins
Robbins Review
Wed, Apr 9, 2014
RE: Changing the Timeline
in Living with LEED Online - quirks, bugs and hiccups
129 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Tue, Apr 8, 2014
RE: Project Type and Rating Type for Block Project
in LEED for Multiple Buildings and On-Campus Building Application Guide
18 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Apr 5, 2014
RE: LEED V4 Reference Guide
in Got Technical Questions on LEED v4?
41 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Fri, Apr 4, 2014
RE: IES vs other software
in Has anyone done LEED energy modelling using Integrated Environmental Solutions (IES) software
5 Sylvain laporte
GASD-Co
Thu, Apr 3, 2014
Apply to LEED Committees by April 10
in LEED for Neighborhood Development (LEED-ND) Forum
179 Christopher Law
Associate, LEED
U.S. Green Building Council
Wed, Apr 2, 2014
RE: LEED-ND v2009 Sunset
in LEED v4 Overwhelmingly Approved by USGBC Members
39 Meghan Bogaerts
Manager, Neighborhood Development
U.S. Green Building Council
Wed, Apr 2, 2014
LEED online login
in leedonline.com access - is it possible???
15 Ali Kassid
Sr. Architect
Hill International
Tue, Apr 1, 2014
RE: CS expedited process
in Core and Shell Precertification
2 Catie Ryan
Project Manager
Terrapin Bright Green
Mon, Mar 31, 2014
Option 3 for Catholic and Public Joint Use School
in LEED Canada Forum
32 Kelly Searle
LEED Green Associate, Sustainable Innovation Specialist
Clark Builders
Fri, Mar 28, 2014
RE: Guestrooms Excluded?
in LEED IEQ Space Matrix - Frequently Asked Questions
31 Nena Elise
Wed, Mar 26, 2014
RE: We are working on a project
in New District Energy Guidance for LEED Released by USGBC
56 Marcus Sheffer
LEED Fellow
7group
Sun, Mar 23, 2014
RE: LEED ND acronyms
in What’s New in LEED for Neighborhood Development v4
2 Martine Desbois
Tue, Mar 18, 2014
Title Votes Comments Most Recent Post
RE: Existing Trees
in EBOM 2009 SSc5: Site Development—Protect or Restore Open Habitat
63 83 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Thu, Aug 5, 2010
Lack of Documentations of Scrap Traders
in NC 2009 MRc2: Construction Waste Management
63 319 Abdulrahman Sherazy
LEED AP bd+c - Projects and Environment Manager
L'OREAL Cosmetics Industry LCI
Mon, May 13, 2013
RE: Modular construction
in NC 2009 MRc2: Construction Waste Management
63 319 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Fri, May 3, 2013
RE: Baseline design by Appendix G
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
63 297 Paul Conrad
Energy Engineer
CLEAResult Consulting
Tue, Sep 28, 2010
Blower Test with ASTM-779-03
in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
63 90 Ashu Gupta
Project Engineer
Sat, Aug 7, 2010
RE: Performance vs. transparency
in Pilot Credit 43: Certified Products
63 22 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Tue, Jun 21, 2011
Re: Tips for Passing the LEED Green Associate Exam
in 10 Tips for Passing the LEED Green Associate Exam
63 40 Claire Moloney
Content & Community Manager
Poplar Network
Thu, Mar 14, 2013
RE: Re: Tips for Passing the LEED Green Associate Exam
in 10 Tips for Passing the LEED Green Associate Exam
63 40 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 14, 2013
Energy Model
in CS 2009 EAc1: Optimize Energy Performance
63 237 Oliver Preuss Hernandez
Mon, Dec 19, 2011
RE: CxA from owner
in CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
63 62 Steve Khouw
Principal
DNA GreenDesign
Thu, Aug 19, 2010
CASE 2 vegetated roof inclusion subject to earning SSc2?
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
63 182 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Wed, Aug 11, 2010
RE: Building Reuse Calculation, please clarify?
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
63 67 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 1, 2010
RE: Reused furniture from old office
in CI 2009 MRc5: Regional Materials
63 89 Patrick Moore
GBD Architects, Inc
Tue, Aug 24, 2010
RE: Do these requirements apply to tenanted areas too ?
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
63 50 Allison Zuchman
Green Building Consultant
Fore Solutions
Tue, Sep 21, 2010
RE: Irrigation supply from local farmland irrigation channel
in NC 2009 WEc1: Water Efficient Landscaping
63 316 Maura Adams
Environmental Stewardship Manager
Wed, Feb 9, 2011
RE: Irrigation - Baseline case
in NC 2009 WEc1: Water Efficient Landscaping
63 316 Omar Katanani
Tue, Mar 8, 2011
what is meant by required signatory
in Required Signatories in LEED Online Forms
63 63 Tarek Dalati
Sustainbility manager
CRHI
Tue, Mar 8, 2011
RE: Pre Conditioning
in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
63 101 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Aug 5, 2010
RE: Electricity usage x gross square footage
in CS 2009 EAc6: Green Power
63 66 Susann Geithner
Global Sustainability Manager
Predictive Service
Wed, Jan 12, 2011
RE: EP
in CS 2009 EAc6: Green Power
63 66 Marcus Sheffer
LEED Fellow
7group
Fri, Dec 9, 2011
Title Comments Most Recent Post
2 different system in LEED Boundary
in NC-2009 IEQp1: Minimum IAQ Performance
697 SW LEE
Project Manager
Fri, Apr 18, 2014
LEED Project boundary and adjacent road.
in MPR3: Must use a reasonable site boundary
172 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Fri, Apr 18, 2014
LEED v4 - Green Associate or AP Exam
in 10 Tips for Passing the LEED Green Associate Exam
40 Oliver Robbins
Robbins Review
Fri, Apr 18, 2014
EP credit
in EBOM 2009 IEQc2.4: Daylight and Views
66 ethan adams
UUSC
Fri, Apr 18, 2014
template update
in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
64 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 18, 2014
LEEDuser IPM template updated
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
68 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 18, 2014
Greenhouse Program
in Schools 2009 IDc1: Innovation in Design
18 Larry Turbes
Architect
TKDA
Fri, Apr 18, 2014
LEED CS with partially occupied building
in LEED Rating System Selection Q&A
559 alessandro speccher
senior developer
gbc italia
Fri, Apr 18, 2014
AHU system for industrial production
in NC 2009 EAc1: Optimize Energy Performance
1,010 Renaud Gay
Shanghai Pacific Energy Center
Thu, Apr 17, 2014
Illustrating Compliance using representative sampling?
in EBOM 2009 IEQc2.2: Controllability of Systems—Lighting
48 Ryan Hoffman
Heapy Engineering
Thu, Apr 17, 2014
EP Threshold for LEED-HC
in NC 2009 EAc6: Green Power
127 Caupolican Diaz
Sustainable Design Coordinator
SMMA
Thu, Apr 17, 2014
Campus Fees
in New LEED Guidance for Campuses and Multiple Buildings
468 Eduardo Straub
Straub Sustentabilidade
Thu, Apr 17, 2014
Does the equipment have to fully provide outside air at 100% ?
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
137 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Wed, Apr 16, 2014
Alternate Compliance Concept - Thoughts?
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
170 Eric Thompson
Architect
NBBJ
Wed, Apr 16, 2014
Use of renewable energy in calculation
in ND-v4: Optimize building energy performance
1 Martine Desbois
Wed, Apr 16, 2014
CO2-eq emissions reduction
in NC 2009 EAp2: Minimum Energy Performance
2,099 Omar ElRawy
Wed, Apr 16, 2014
Skylight coverage
in NC 2009 IEQc8.1: Daylight and Views—Daylight
586 ADRIENN GELESZ
LEED AP
ABUD Engineering Ltd.
Tue, Apr 15, 2014
Construction within LEED boundary after completion of original
in PIf2: Project Summary Details
148 Heather DeGrella
Sustainability Coordinator
Opsis Architecture
Mon, Apr 14, 2014
Anticipated Type?
in LEED Rating System Selection Q&A
559 Anna Lehr
Mon, Apr 14, 2014
Development Density Exemplary Performance - Site Area
in CS 2009 SSc2: Development Density and Community Connectivity
34 Emmanuel Gee
Project Architect
Buell Kratzer Powell
Mon, Apr 14, 2014

Copyright 2014 – BuildingGreen, Inc.