LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Building height calculatons
in Pilot Credit 55: Bird Collision Deterrence
44 Eunice Perez
Engineer
THREE Consultoría Medioambiental
Fri, Apr 15, 2016
RE: Documenting the Pilot Credit with International Standards
in Pilot Credit 44: Ergonomics Strategy
40 Larissa Oaks
Specialist, LEED
USGBC
Fri, Apr 15, 2016
RE: Sound Transmission
in NC-v4: Acoustic performance
12 Larissa Oaks
Specialist, LEED
USGBC
Fri, Apr 15, 2016
RE: Reuse of window glass for contstruction fill
in CS 2009 MRc2: Construction Waste Management
78 Michelle Reott
LEED AP® BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC, a LEED® Proven Provider™
Fri, Apr 15, 2016
LEED Project Baundary
in MPR3: Must use a reasonable site boundary
9 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Fri, Apr 15, 2016
Argentina
Modeling DCV Savings for Proposed Building
in CS-2009 IEQp1: Minimum IAQ Performance
151 Bernard Sagaiyaraj
Director
Blue Snow Consulting and Engineering Sdn. Bhd.
Fri, Apr 15, 2016
Malaysia
RE: conductive rubber flooring
in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
381 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Thu, Apr 14, 2016
United States
RE: 10% Exemption
in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
66 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
RE: Do green roofs help to comply this credit? And green walls?
in EBOM-v4: Site Development- protect or restore habitat
9 Samantha Longshore
Sustainability Advisor
Transwestern
Thu, Apr 14, 2016
Ventilated Interior Door
in Homes-v4: Advanced utility tracking
1 Mitchell Toews
Lynden Door | VanAir Design
Thu, Apr 14, 2016
United States
Purchasing Calculator updated 4/8/2016
in EBOM-v4: Purchasing - lamps
5 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
Purchasing Calculator updated 4/8/2016
in EBOM-v4: Purchasing - ongoing
5 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
RE: MPR2 - LEED-CI Hotel Portion and Shared Mechanical Systems
in LEED Minimum Program Requirements
455 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Apr 14, 2016
Timeline to File an Appeal
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
784 Jason Moody
Engineer
RNM Engineers
Thu, Apr 14, 2016
MPR3 - Hotel in Mixed Use Building
in MPR3: Must use a reasonable site boundary
3 Sara Zoumbaris
Sustainable Design Consulting
Thu, Apr 14, 2016
United States
RE: GRI Sustainability Reports
in Pilot Credit 53: Responsible Sourcing of Raw Materials
7 Chloe Bendistis
Sustainability Project Manager
The Sheward Partnership, LLC
Thu, Apr 14, 2016
RE: Campus project - joint ESC plan and measures
in NC 2009 SSp1: Construction Activity Pollution Prevention
284 Kristina Bach
Sustainability Specialist
Thu, Apr 14, 2016
Precertification credits online
in CS 2009 WEc3: Water Use Reduction
20 Jakub Netolicky
Mr.
PM Group CZ
Thu, Apr 14, 2016
Czech Republic
RE: Option 1 - What to include in Site Area calc
in CS 2009 SSc2: Development Density and Community Connectivity
49 Saurabh Shrestha
HKS Inc.
Wed, Apr 13, 2016
SSc1 Path 12: EV Charging Stations
in CI 2009 SSc1: Site Selection
222 Alaina Ladner
Designer
Huntsman Architectural Group
Wed, Apr 13, 2016
United States
Title Comments Most Recent Post Location
RE: 10% Exemption
in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
66 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
RE: Do green roofs help to comply this credit? And green walls?
in EBOM-v4: Site Development- protect or restore habitat
9 Samantha Longshore
Sustainability Advisor
Transwestern
Thu, Apr 14, 2016
Ventilated Interior Door
in Homes-v4: Advanced utility tracking
1 Mitchell Toews
Lynden Door | VanAir Design
Thu, Apr 14, 2016
United States
Purchasing Calculator updated 4/8/2016
in EBOM-v4: Purchasing - lamps
5 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
Purchasing Calculator updated 4/8/2016
in EBOM-v4: Purchasing - ongoing
5 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
MPR3 - Hotel in Mixed Use Building
in MPR3: Must use a reasonable site boundary
3 Sara Zoumbaris
Sustainable Design Consulting
Thu, Apr 14, 2016
United States
RE: GRI Sustainability Reports
in Pilot Credit 53: Responsible Sourcing of Raw Materials
7 Chloe Bendistis
Sustainability Project Manager
The Sheward Partnership, LLC
Thu, Apr 14, 2016
RE: Campus project - joint ESC plan and measures
in NC 2009 SSp1: Construction Activity Pollution Prevention
284 Kristina Bach
Sustainability Specialist
Thu, Apr 14, 2016
Precertification credits online
in CS 2009 WEc3: Water Use Reduction
20 Jakub Netolicky
Mr.
PM Group CZ
Thu, Apr 14, 2016
Czech Republic
RE: Option 1 - What to include in Site Area calc
in CS 2009 SSc2: Development Density and Community Connectivity
49 Saurabh Shrestha
HKS Inc.
Wed, Apr 13, 2016
SSc1 Path 12: EV Charging Stations
in CI 2009 SSc1: Site Selection
222 Alaina Ladner
Designer
Huntsman Architectural Group
Wed, Apr 13, 2016
United States
RE: Discrepancy between credit requirements and credit specifics
in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes
13 Chloe Bendistis
Sustainability Project Manager
The Sheward Partnership, LLC
Wed, Apr 13, 2016
RE: Providing water quality treatment to meet credit requirements
in CS v4: Rainwater management
3 Michael D. DeVuono
Senior Staff Engineer
T&M Associates
Wed, Apr 13, 2016
Credit 7.1 and 7.2
in NC 2009 SSc7.1: Heat Island Effect—Nonroof
285 Alejandro Macias
Wed, Apr 13, 2016
Mexico
RE: Acoustic performance
in Data Centers-NC-v4: Acoustic performance
2 Daniel Hicks
Daniel Hicks, E.I., INCE
Geiler & Associates
Wed, Apr 13, 2016
RE: Density Calc which includes Marinas
in NC 2009 SSc2: Development Density and Community Connectivity
281 Qiongwen Kong
Intern Architect
COOPER CARRY
Tue, Apr 12, 2016
RE: Existing Conditions
in NC-v4: Outdoor water use reduction
22 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 12, 2016
RE: Case 1 vs Case 2
in CI 2009 EAc3: Measurement and Verification
164 Marcus Sheffer
LEED Fellow
7group
Tue, Apr 12, 2016
RE: CUP in group project
in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances
314 Marcus Sheffer
LEED Fellow
7group
Tue, Apr 12, 2016
RE: Supplemental Documentation
in NC-2009: Local food production
30 Melissa Merryweather
Director
Green Consult-Asia
Tue, Apr 12, 2016
Title Comments Most Recent Post Location
Cyprus - by LEEDUser Team
Thu, Sep 18, 2014
Greece - by LEEDUser Team
Thu, Sep 18, 2014
Italy - by LEEDUser Team
Thu, Sep 18, 2014
Macedonia - by LEEDUser Team
Thu, Sep 18, 2014
Malta - by LEEDUser Team
Thu, Sep 18, 2014
Montenegro - by LEEDUser Team
Thu, Sep 18, 2014
Suriname - by LEEDUser Team
Thu, Sep 18, 2014
Uruguay - by LEEDUser Team
Thu, Sep 18, 2014
Venezuela - by LEEDUser Team
Thu, Sep 18, 2014
South and Southeast Asia - by LEEDUser Team
Thu, Sep 18, 2014
Afghanistan - by LEEDUser Team
Thu, Sep 18, 2014
Bangladesh - by LEEDUser Team
Thu, Sep 18, 2014
Bhutan - by LEEDUser Team
Thu, Sep 18, 2014
Brunei - by LEEDUser Team
Thu, Sep 18, 2014
Burma - by LEEDUser Team
Thu, Sep 18, 2014
Cambodia - by LEEDUser Team
Thu, Sep 18, 2014
India - by LEEDUser Team
Thu, Sep 18, 2014
Indonesia - by LEEDUser Team
Thu, Sep 18, 2014
Laos - by LEEDUser Team
Thu, Sep 18, 2014
Malaysia - by LEEDUser Team
Thu, Sep 18, 2014
Title Comments Most Recent Post Location
Paints & coatings products available in China
in CI 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
77 Anne-Claire BARBERI
Project Manager
ARP-Astrance
Tue, Mar 22, 2016
United Arab Emirates
Flooring systems products available in China
in CI 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
117 Anne-Claire BARBERI
Project Manager
ARP-Astrance
Tue, Mar 22, 2016
United Arab Emirates
Multiple Building HVAC system
in Campus and Multiple Buildings Approach
4 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Tue, Mar 22, 2016
Argentina
LCA questionnaire for Master thesis
in Pilot Credit 63: Whole Building Life Cycle Assessment
16 Arturs Alsins
Tue, Mar 22, 2016
Modification to base building systems
in CI-2009 IEQp1: Minimum IAQ Performance
154 Ben Hollon
Mechanical Engineer
Lankford Fendler
Mon, Mar 21, 2016
RE: Storm Interval and Drawdown
in NC 2009 SSc6.1: Stormwater Design—Quantity Control
281 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 21, 2016
RCI CORR Information
in NC-2009: Verified Construction & Demolition Recycling Rates
4 John Danby
Sustainability Administrator
UC Davis Health System
Mon, Mar 21, 2016
United States
RCI CORR Information
in NC-2009: Verified Construction & Demolition Recycling Rates
4 John Danby
Sustainability Administrator
UC Davis Health System
Mon, Mar 21, 2016
United States
Galvanize Repair
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
521 Sean Kirk
Construction Specialist
Amec Foster Wheeler
Sun, Mar 20, 2016
United States
RE: CI - ID Credit for Cooling Tower Collection
in CI 2009 IDc1: Innovation in Design
166 Kristina Bach
Sustainability Specialist
Fri, Mar 18, 2016
Rooftop Greenhouse
in Schools 2009 SSc5.2: Site Development—Maximize Open Space
22 Sarah Nugent
Sustainability Consultant
Steven Winter Associates, Inc
Thu, Mar 17, 2016
United States
Multiple Building HVAC system
in Campus and Multiple Buildings Approach
4 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Wed, Mar 16, 2016
Argentina
earn a point using v4 credit
in EBOM 2009 SSc4: Alternative Commuting Transportation
308 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 16, 2016
RE: Scope of Alternative Transportation Measures for a Dormitory
in EBOM-v4: Alternative transportation
14 Trista Little
Sustainability Manager
YR&G
Wed, Mar 16, 2016
Supermarket in a spead shopping center.
in MPR3: Must use a reasonable site boundary
1 Heraldo Muñoz
Tue, Mar 15, 2016
Argentina
parking area under cover
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
133 ANNA SUN
Tue, Mar 15, 2016
China
Controlled Entry
in Pilot Credit 78: Design for active occupants
111 Jon Hall
GGLO
Tue, Mar 15, 2016
Hybrid Urinals
in CI 2009 WEc1: Water Use Reduction
105 Nilda De Coutte
Fundacion Ciudad del Saber
Tue, Mar 15, 2016
Panama
Changes to Campus Boundary?
in MPR3: Must use a reasonable site boundary
232 David Gibney
Technical Director for Sustainable Design
M+W Group
Tue, Mar 15, 2016
United States
RE: Campus project - joint ESC plan and measures
in NC 2009 SSp1: Construction Activity Pollution Prevention
284 Kristina Bach
Sustainability Specialist
Tue, Mar 15, 2016
Title Comments Post date Most Recent Postsort icon Location
No Smoking Signage for a University Dormitory
in EBOM-v4: Environmental Tobacco Smoke Control
8 Patricia Andrasik
Assistant Professor / Head of Sustainability Outreach
The Catholic Universtiy of America
Tue, Apr 5, 2016
2016-04-05 20:35 United States
Scope of Alternative Transportation Measures for a Dormitory
in EBOM-v4: Alternative transportation
14 Patricia Andrasik
Assistant Professor / Head of Sustainability Outreach
The Catholic Universtiy of America
Tue, Apr 5, 2016
2016-04-05 20:26 United States
Cold Climate
in NC 2009 SSc7.2: Heat Island Effect—Roof
310 Erin Holdenried
Sustainable Design Manager
AECOM
Tue, Apr 5, 2016
2016-04-05 19:31 United States
Cold Climate
in NC 2009 SSc7.1: Heat Island Effect—Nonroof
285 Erin Holdenried
Sustainable Design Manager
AECOM
Tue, Apr 5, 2016
2016-04-05 19:30 United States
What is a wetland or naturally designed pond per credit language
in CS 2009 SSc5.2: Site Development—Maximize Open Space
53 Landry Watson
DPR Construction
Tue, Apr 5, 2016
2016-04-05 16:45 United States
VRF system
in NC 2009 EAp3: Fundamental Refrigerant Management
53 GISELA FARHAT DE ARAUJO
Tue, Apr 5, 2016
2016-04-05 14:24 Brazil
The cost of Certification
in LEED for Healthcare forum - LEED-HC users welcome!
128 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Tue, Apr 5, 2016
2016-04-05 13:25 Argentina
Regularly occupied area of an hotel room
in NC-v4: Daylight
44 Ilse Dijkstra-Nugteren
Tue, Apr 5, 2016
2016-04-05 06:34 Netherlands
ISO 50001 ACP Timeframe
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
120 Gina Dederer
URS Deutschland GmbH
Tue, Apr 5, 2016
2016-04-05 06:23 Ireland
DCV requirement for high-occupancy areas
in CS 2009 EAp2: Minimum Energy Performance
1,047 Shenhao Li
Atkins
Mon, Apr 4, 2016
2016-04-04 23:50 China
Building Flush - Filter Change?
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
69 Brianne Smith
Architect
RB+B Architects
Mon, Apr 4, 2016
2016-04-04 17:01 United States
Provide the source of data
in Healthcare-v2009: PBT source reduction - lead, cadmium and copper
20 Matt Luedders
Mon, Apr 4, 2016
2016-04-04 12:40 United States
SSc4.2 Bicycle Storage for a mixed-use Hotel/Commercial Space
in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
105 Bhavin Pardiwala
Project Coordinator
Moody Nolan
Mon, Apr 4, 2016
2016-04-04 12:34 United States
Outdoor air
in NC-v4: Minimum energy performance
75 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Mon, Apr 4, 2016
2016-04-04 12:31 Spain
LEED Lab
in EBOM-2009: LEED Lab
1 Stacey White
Principal
mode associates
Sat, Apr 2, 2016
2016-04-02 21:26 United States
EAP2 required HAP input summary
in NC 2009 EAp2: Minimum Energy Performance
3,423 Eric Wright
Fri, Apr 1, 2016
2016-04-01 19:26 United States
Industry benchmark comparison reports
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
505 Omar Delgado
Mechanical Engineer
EnerMech
Fri, Apr 1, 2016
2016-04-01 13:18 United States
Pre-Rinse Spray Valves in Laboratories
in NC 2009 WEp1: Water Use Reduction—20% Reduction
725 Wyatt Suddarth
Mechanical EIT
HDR Architecture, Inc.
Fri, Apr 1, 2016
2016-04-01 12:03 United States
Hourly Data for Rainwater Harvesting Calculation
in NC 2009 WEp1: Water Use Reduction—20% Reduction
725 Christian Kaltreider
Fri, Apr 1, 2016
2016-04-01 10:37 United States
Alternative Compliance for M&V
in NC 2009 EAc5: Measurement and Verification
240 deborah lucking
associate
fentress architects
Thu, Mar 31, 2016
2016-03-31 19:51 United States

Copyright 2016 – BuildingGreen, Inc.