LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: EBOM Solid Waste Management Policy in Medical Office Building
in NC 2009 IDc1: Innovation in Design
626 GreenShape Expert
Employee
GreenShape LLC
Mon, Mar 13, 2017
RE: Compost as an additional recyclable
in NC-v4: Storage and collection of recyclables
9 Sara Zoumbaris
Sustainable Design Consulting
Mon, Mar 13, 2017
United States
RE: Local voluntary cleanup program - definition
in NC 2009 SSc3: Brownfield Redevelopment
117 Larry Sims
Principal
Studio4, LLC
Mon, Mar 13, 2017
Fixtures for Option 2 Lighting Quality, Strategy D.
in NC-v4: Interior lighting
38 Geoffrey Katz
AECOM
Mon, Mar 13, 2017
Canada
discrepancy between CS and BD+C
in CS v4: Reduced parking footprint
2 Gail Napell
AIA
Gensler
Sun, Mar 12, 2017
United States
Calculation of weighted area: Automated pdf vs Eq. 1 @LEED
in EBOM 2009 SSc7.2: Heat Island Reduction—Roof
83 Aru Sau
Fri, Mar 10, 2017
Existing Building, Renovations Taking Place Piecemeal
in CI-v4: Indoor air quality assessment
3 Sara Zoumbaris
Sustainable Design Consulting
Fri, Mar 10, 2017
United States
RE: Water Sense Labeling
in CI-v4: Indoor water use reduction
7 Carlie Bullock-Jones, LEED Fellow, WELL AP
Principal
Ecoworks Studio
Fri, Mar 10, 2017
RE: What percentage of products purchased count towards the credit.
in EBOM-v4: Green cleaning - products and materials
13 Trista Little
Sustainability Manager
YR&G
Fri, Mar 10, 2017
RE: Help with LEED ND
in ND Plan-v4: Must be in a permanent location on existing land
8 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, Mar 9, 2017
RE: Case 1, Option 2 baseline
in EBOM-2009 WEc3: Water Efficient Landscaping
132 Trista Little
Sustainability Manager
YR&G
Thu, Mar 9, 2017
RE: Laboratory
in NC-v4: Indoor water use reduction
39 Jonathan Weiss
Thu, Mar 9, 2017
RE: LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)
in Healthcare-v2009: Environmental site assessment
8 Larry Sims
Principal
Studio4, LLC
Thu, Mar 9, 2017
RE: CS 2009 & CI v4
in CS 2009 SSc9: Tenant Design and Construction Guidelines
54 Maria Porter
Environmental Certification Engineer
Skanska Sweden
Thu, Mar 9, 2017
RE: FTE is linked to IEQc6.1 and IEQc6.2 - Healthcare buildings
in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
242 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: AHUs unable to meet case 1 or case 2
in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
380 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Green-E Equivalency
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
118 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Option-3: Irrigation Meter Installed
in EBOM-v4: Outdoor water use reduction
15 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Metered energy data
in EBOM-v4: Optimize energy performance
2 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Continuous Monitoring Sensors
in EBOM-v4: Thermal comfort
6 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
Title Comments Most Recent Post Location
Calculation of weighted area: Automated pdf vs Eq. 1 @LEED
in EBOM 2009 SSc7.2: Heat Island Reduction—Roof
83 Aru Sau
Fri, Mar 10, 2017
Existing Building, Renovations Taking Place Piecemeal
in CI-v4: Indoor air quality assessment
3 Sara Zoumbaris
Sustainable Design Consulting
Fri, Mar 10, 2017
United States
RE: Water Sense Labeling
in CI-v4: Indoor water use reduction
7 Carlie Bullock-Jones, LEED Fellow, WELL AP
Principal
Ecoworks Studio
Fri, Mar 10, 2017
RE: What percentage of products purchased count towards the credit.
in EBOM-v4: Green cleaning - products and materials
13 Trista Little
Sustainability Manager
YR&G
Fri, Mar 10, 2017
RE: Help with LEED ND
in ND Plan-v4: Must be in a permanent location on existing land
8 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, Mar 9, 2017
RE: Case 1, Option 2 baseline
in EBOM-2009 WEc3: Water Efficient Landscaping
132 Trista Little
Sustainability Manager
YR&G
Thu, Mar 9, 2017
RE: Laboratory
in NC-v4: Indoor water use reduction
39 Jonathan Weiss
Thu, Mar 9, 2017
RE: LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)
in Healthcare-v2009: Environmental site assessment
8 Larry Sims
Principal
Studio4, LLC
Thu, Mar 9, 2017
RE: CS 2009 & CI v4
in CS 2009 SSc9: Tenant Design and Construction Guidelines
54 Maria Porter
Environmental Certification Engineer
Skanska Sweden
Thu, Mar 9, 2017
RE: FTE is linked to IEQc6.1 and IEQc6.2 - Healthcare buildings
in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
242 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: AHUs unable to meet case 1 or case 2
in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
380 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Green-E Equivalency
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
118 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Option-3: Irrigation Meter Installed
in EBOM-v4: Outdoor water use reduction
15 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Metered energy data
in EBOM-v4: Optimize energy performance
2 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: Continuous Monitoring Sensors
in EBOM-v4: Thermal comfort
6 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
RE: VENTILATION WAREHOUSES
in Warehouses-EBOM-v4: Minimum indoor air quality performance
2 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Mar 8, 2017
LEED v2009 CS+ID Point
in CS 2009 IDc1: Innovation in Design
62 Britt Valdez
Wed, Mar 8, 2017
Is Athena Impact Estimator databses is recommende for South Asia
in Pilot Credit 63: Whole Building Life Cycle Assessment
20 Malan Jayawickrama
Research Assistant
University of Peradeniya
Wed, Mar 8, 2017
Sri Lanka
RE: Would LEASING a Battery Powered Floor Cleaner Meet Criteria?
in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods
95 Mihir Parikh
CB&I
Tue, Mar 7, 2017
Is there a limit to how many products can use the same CSR?
in NC-v4: Building product disclosure and optimization - sourcing of raw materials
101 Alexa Stone
ecoPreserve - Building Sustainbility
Mon, Mar 6, 2017
United States
Title Comments Most Recent Post Location
Belgium - by LEEDUser Team
Thu, Sep 18, 2014
France - by LEEDUser Team
Thu, Sep 18, 2014
Germany - by LEEDUser Team
Thu, Sep 18, 2014
Philippines - by LEEDUser Team
Thu, Sep 18, 2014
Singapore - by LEEDUser Team
Thu, Sep 18, 2014
Sri Lanka - by LEEDUser Team
Thu, Sep 18, 2014
Thailand - by LEEDUser Team
Thu, Sep 18, 2014
Timor-Leste - by LEEDUser Team
Thu, Sep 18, 2014
Vietnam - by LEEDUser Team
Thu, Sep 18, 2014
Southern Europe - by LEEDUser Team
Thu, Sep 18, 2014
Albania - by LEEDUser Team
Thu, Sep 18, 2014
Andorra - by LEEDUser Team
Thu, Sep 18, 2014
Bosnia and Herzegovina - by LEEDUser Team
Thu, Sep 18, 2014
Croatia - by LEEDUser Team
Thu, Sep 18, 2014
Cyprus - by LEEDUser Team
Thu, Sep 18, 2014
Greece - by LEEDUser Team
Thu, Sep 18, 2014
Italy - by LEEDUser Team
Thu, Sep 18, 2014
Macedonia - by LEEDUser Team
Thu, Sep 18, 2014
Malta - by LEEDUser Team
Thu, Sep 18, 2014
Montenegro - by LEEDUser Team
Thu, Sep 18, 2014
Title Comments Most Recent Post Location
Exterior lighting for group certification
in NC 2009 SSc8: Light Pollution Reduction
647 Mohamed M. Abd Elhameed
Managing Director
WECONSERVE LLC
Thu, Feb 23, 2017
Saudi Arabia
Fixtures for Option 2 Lighting Quality, Strategy D.
in NC-v4: Interior lighting
38 Geoffrey Katz
AECOM
Thu, Feb 23, 2017
Canada
Exterior lighting for group certification
in NC 2009 SSc8: Light Pollution Reduction
647 Mohamed M. Abd Elhameed
Managing Director
WECONSERVE LLC
Thu, Feb 23, 2017
Saudi Arabia
LEED NC for Most of a Building
in NC-v4: Must use reasonable LEED boundaries
46 Nathan Gauthier
Director of FM Integration and Sustainability
Shawmut Design and Construction
Wed, Feb 22, 2017
United States
raw material invoice submital
in Schools IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
24 Esther Kohout
Kohout Woodwork, Inc
Tue, Feb 21, 2017
United States
RE: Sherwin Williams Pro-Cryl Universal Primer
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
552 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Mon, Feb 20, 2017
PC 112 Calculating costs
in CI-2009: Certified Multi-attribute Products and Materials
1 Maki San Miguel Paulson
Design Support Services of Philadelphia
Mon, Feb 20, 2017
United States
RE: Manufacturers' claims and laboratory requirements.
in NC-v4: Low emitting materials
304 Ashley Hu
Jr. Sustainable Building Advisor
Mon, Feb 20, 2017
Living/Green Walls
in CS v4: Open space
4 Ward Miller
Chief Environmental Officer
Alpenglow Advisory
Fri, Feb 17, 2017
Bulgaria
Major renovation with re-insulation of external walls and roofs
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
117 Qian Tang
Fri, Feb 17, 2017
Residential Flush out Requirements
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
358 Rachel Manoguerra
LEED AP
3QC, Inc.
Thu, Feb 16, 2017
RE: Green-E Equivalency
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
118 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Feb 15, 2017
Replacing filters prior to occupancy
in Schools 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
15 Ashley Love
LEED AP BD+C
Wed, Feb 15, 2017
United States
Compartmentalization for residential projects for NC but not CI
in NC-v4: Environmental tobacco smoke control
8 Alara Matsyk
Sustainable Buildings Coordinator
Prairie Architects Inc
Tue, Feb 14, 2017
Canada
RE: Laboratory
in NC-v4: Indoor water use reduction
39 Jonathan Weiss
Tue, Feb 14, 2017
RE: What about Site Selection?
in NC-v4: Integrative process
35 Marcus Sheffer
LEED Fellow
7group
Tue, Feb 14, 2017
MERV 13 filters on ONLY outdoor air units?
in Retail-CI-v4: Enhanced indoor air quality strategies
1 Amber Richane
Performance Driven Design Lead
CallisonRTKL
Mon, Feb 13, 2017
United States
EPDs and Manufacturing Dates
in CI-v4: Building product disclosure and optimization - environmental product declarations
22 Michelle Rosenberger
Partner
ArchEcology, LLC
Mon, Feb 13, 2017
International Project - Case 2 Option 1 or Option 2
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
128 Sheena Moses
Sustainabillity Consultant
IEN Consultants Sdn.Bhd
Mon, Feb 13, 2017
Malaysia
LEED NC for Most of a Building
in NC-v4: Must use reasonable LEED boundaries
46 Nathan Gauthier
Director of FM Integration and Sustainability
Shawmut Design and Construction
Thu, Feb 9, 2017
United States
Title Comments Post date Most Recent Postsort icon Location
Compartmentalization for residential projects for NC but not CI
in NC-v4: Environmental tobacco smoke control
8 Alara Matsyk
Sustainable Buildings Coordinator
Prairie Architects Inc
Fri, Mar 3, 2017
2017-03-03 12:59 Canada
2010 AGMBC v2
in New LEED Guidance for Campuses and Multiple Buildings
586 Francis Hernandez
Design / Build Coordinator
Caddell Construction Co. (DE), LLC
Fri, Mar 3, 2017
2017-03-03 12:24 United States
Overlapping LEED boundaries-connecting new to existing LEED BLDG
in MPR3: Must use a reasonable site boundary
253 Punit Jain
Vice President
CannonDesign
Thu, Mar 2, 2017
2017-03-02 17:13 United States
LEED NC for Most of a Building
in NC-v4: Must use reasonable LEED boundaries
46 Nathan Gauthier
Director of FM Integration and Sustainability
Shawmut Design and Construction
Thu, Mar 2, 2017
2017-03-02 14:24 United States
Outdoor shower?
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
328 Cynthia Quinn
Principal
Ecological Environments, LLC
Thu, Mar 2, 2017
2017-03-02 14:03 United States
Colored surface hardener in Powder form (Cement based)
in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
450 Mario S.
Thu, Mar 2, 2017
2017-03-02 10:01 Lebanon
Handwatering in lieu of temporary irrigation
in NC 2009 WEc1: Water Efficient Landscaping
470 Mickela Pallares
Architect
Wed, Mar 1, 2017
2017-03-01 19:56 United States
Previously developed
in ND-v4: Preferred locations
3 Sarah Mason
Sustainability and Wellness
Strategic Property Partners
Wed, Mar 1, 2017
2017-03-01 17:52 United States
Compost as an additional recyclable
in NC-v4: Storage and collection of recyclables
9 Sara Zoumbaris
Sustainable Design Consulting
Wed, Mar 1, 2017
2017-03-01 16:33 United States
Several questions
in LEED Energy and EQ Documentation Tips from LEED Reviewers
1 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Wed, Mar 1, 2017
2017-03-01 14:26 Mexico
Transfer Grills
in NC-2009 IEQp1: Minimum IAQ Performance
1,082 Alfonzo Collins
Wed, Mar 1, 2017
2017-03-01 14:18 United States
Documentation required
in EBOM-v4: Minimum indoor air quality performance
13 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Wed, Mar 1, 2017
2017-03-01 14:16 Mexico
Phases of construction
in MPR2: Must be a complete, permanent building or space
1 Cynthia Quinn
Principal
Ecological Environments, LLC
Wed, Mar 1, 2017
2017-03-01 13:41 United States
aerosol paints
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
584 Abdalla Anwar
Lead Design Architect | Leed Green associate
Nesma & Partners
Wed, Mar 1, 2017
2017-03-01 10:00 Saudi Arabia
Car wash in parking garage
in EBOM 2009 WEc1: Water Performance Measurement
82 Rasita Masalskyte
Ms
Vesta Consulting
Wed, Mar 1, 2017
2017-03-01 09:38 Lithuania
Thermal Comfort Controls
in NC-v4: Thermal comfort
25 LEED Pro Consultant
Bioconstruccion & Energia Alternativa
Tue, Feb 28, 2017
2017-02-28 14:04 Mexico
Filling the Minimum Performance Calculator for 100% OA
in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
380 Rasita Masalskyte
Ms
Vesta Consulting
Tue, Feb 28, 2017
2017-02-28 12:43 Lithuania
Preproject water bodies
in ND Plan-v4: Wetlands and water body conservation
2 Sarah Mason
Sustainability and Wellness
Strategic Property Partners
Tue, Feb 28, 2017
2017-02-28 12:28 United States
Green Power Five Year Contracts
in NC-v4: Green power and carbon offsets
27 Sean Hogan
LEED AP
RKD Architects
Tue, Feb 28, 2017
2017-02-28 08:14 Ireland
Pilot credit: No Cooling Tower [ v4 - bc+d)
in NC-v4: Innovation
19 Ydo Schuuring
Specialist Building Physics,Acoustics and Sustainability
DGMR Consultancy
Tue, Feb 28, 2017
2017-02-28 07:29 Netherlands

Copyright 2017 – BuildingGreen, Inc.