LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Fan and Coil Units
in CS 2009 IEQc3: Construction IAQ Management Plan—During Construction
34 Ciaran McCabe
METEC Consulting Engineers
Sun, Nov 20, 2016
RE: Water Reduction credit points for for ID +C seem unusually high
in CI-v4: Indoor water use reduction
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 18, 2016
Profitability from great process is not just for LEED
in LEED Project Management Software
3 Karen Tucker
co-CEO
iLiv
Fri, Nov 18, 2016
RE: Integrative process
in Pilot Credit 60: Integrative Process
13 Helene Gotthelf
Projects Manager
Institute for the Built Environment
Fri, Nov 18, 2016
RE: LEED v3 Campus Deadline
in MPR3: Must use a reasonable site boundary
246 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 18, 2016
RE: Demolished Irrigation System
in NC 2009 WEc1: Water Efficient Landscaping
459 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 18, 2016
RE: LOW-EMITTING AND FUEL-EFFICIENT VEHICLES All fields
in CS 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
116 Allison Smith
Fri, Nov 18, 2016
RE: 100% well or non-potable water
in EBOM-v4: Cooling tower water use
8 Craig Sheehy
Thu, Nov 17, 2016
RE: waste audit documentation
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
107 Trista Little
Sustainability Manager
YR&G
Thu, Nov 17, 2016
RE: IAQ Management Plan during Construction
in EBOM 2009 IEQc1.1: IAQ Best Management Practices—IAQ Management Program
34 Trista Little
Sustainability Manager
YR&G
Thu, Nov 17, 2016
RE: ENERGY STAR Equipment Calculator
in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances
324 Suzanne Painter-Supplee, LEED AP+ID&C
Principal
SEESolutions LLC
Thu, Nov 17, 2016
RE: Concrete coating
in CI 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
79 John-David Hutchison, LEED AP BD+C, PMP
Sustainability Consultant
CSV Architects
Thu, Nov 17, 2016
RE: IPM Tracking Tool
in EBOM-v4: Integrated pest management
17 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Nov 17, 2016
RE: CxA and energy modelling
in CS-2009 EAp1: Fundamental Commissioning of Building Energy Systems
78 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Thu, Nov 17, 2016
RE: School outisde of project boundary
in ND Plan-v4: Neighborhood schools
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Wed, Nov 16, 2016
RE: Indoor recreational facility
in ND Plan-v4: Access to recreation facilities
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Wed, Nov 16, 2016
Previously Develop Site
in Homes-v2008: Preferred locations
1 Charles Nepps
Charles Nepps Consulting
Wed, Nov 16, 2016
Germany
RE: LEED GA Credential Maintenance
in LEED AP Specialities: Should You Get One?
38 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Nov 16, 2016
Tenant work and submittal of credits
in CS-2009 IEQp1: Minimum IAQ Performance
175 Ramkrishna kashyap
Electrical Engineer
Prime project International Dubai
Wed, Nov 16, 2016
RE: I believe their is a typo in the reference guide
in CI-v4: Integrative process
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 15, 2016
Title Comments Most Recent Post Location
RE: School outisde of project boundary
in ND Plan-v4: Neighborhood schools
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Wed, Nov 16, 2016
RE: Indoor recreational facility
in ND Plan-v4: Access to recreation facilities
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Wed, Nov 16, 2016
Previously Develop Site
in Homes-v2008: Preferred locations
1 Charles Nepps
Charles Nepps Consulting
Wed, Nov 16, 2016
Germany
Tenant work and submittal of credits
in CS-2009 IEQp1: Minimum IAQ Performance
175 Ramkrishna kashyap
Electrical Engineer
Prime project International Dubai
Wed, Nov 16, 2016
RE: I believe their is a typo in the reference guide
in CI-v4: Integrative process
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 15, 2016
RE: Historic site
in CS v4: High priority site
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 15, 2016
RE: Air economizer in baseline model
in CS 2009 EAc1: Optimize Energy Performance
331 Marcus Sheffer
LEED Fellow
7group
Tue, Nov 15, 2016
RE: Submitting Innovation Credits in Design Phase
in CI-v4: Innovation
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 15, 2016
RE: Interior Lighting requirements for plant growth and maintenance
in NC-v4: Interior lighting
29 Matt Latchford, PE, IALD, MIES, LC, LEED AP BD+C
Associate Principal
Lam Partners
Tue, Nov 15, 2016
RE: LEED ND v2009 - NDPc1 - Options for internal streets
in ND-v2009: Walkable streets
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Nov 15, 2016
International project - Retail Mall, which case to use?
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
127 Regina Ng
Tue, Nov 15, 2016
Malaysia
RE: automated blinds at option 2 - greater than 3,000 lux
in NC-v4: Daylight
54 Raphael Sperry
Senior Consultant
Arup
Mon, Nov 14, 2016
RE: Campus
in Pilot Credit 14: Walkable Streets
145 Brenda Parker
Architect
The Columbus Architectural Studio
Mon, Nov 14, 2016
RE: On-site waste water treatment
in NC-v4: Indoor water use reduction
9 Brian Salazar
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
Mon, Nov 14, 2016
Is this different than Product Disclosure & Optimization?
in Schools-2009: Integrative Analysis of Building Materials
1 Cynthia Kaplan
Principal
cmk LEED
Fri, Nov 11, 2016
United States
Is thermal comfort control in an art gallery appropriate?
in NC-v4: Thermal comfort
22 Margaret Hamilton
Arup
Fri, Nov 11, 2016
Russian Federation
RE: Increasing Baseline Static Pressure for Sound Regulations
in Schools-NC-v4: Optimize energy performance
2 Marcus Sheffer
LEED Fellow
7group
Fri, Nov 11, 2016
RE: RWH Pond outside LEED Boundary
in PIf4: Schedule and Overview Documents
79 ABDUL MUTHALIB MOHAMED
INNOWELL ENGINEERING INTERNATIONAL PVT LTD
Thu, Nov 10, 2016
RE: Onsite Renewable for 1% of owner controlled annual energy cost.
in CS 2009 EAc2: On-Site Renewable Energy
86 Marcus Sheffer
LEED Fellow
7group
Thu, Nov 10, 2016
RE: IEQ 4.1 CAmpus Credit
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
528 Michelle Rosenberger
Partner
ArchEcology, LLC
Thu, Nov 10, 2016
Title Comments Most Recent Post Location
Philippines - by LEEDUser Team
Thu, Sep 18, 2014
Singapore - by LEEDUser Team
Thu, Sep 18, 2014
Sri Lanka - by LEEDUser Team
Thu, Sep 18, 2014
Thailand - by LEEDUser Team
Thu, Sep 18, 2014
Timor-Leste - by LEEDUser Team
Thu, Sep 18, 2014
Vietnam - by LEEDUser Team
Thu, Sep 18, 2014
Southern Europe - by LEEDUser Team
Thu, Sep 18, 2014
Albania - by LEEDUser Team
Thu, Sep 18, 2014
Andorra - by LEEDUser Team
Thu, Sep 18, 2014
Bosnia and Herzegovina - by LEEDUser Team
Thu, Sep 18, 2014
Croatia - by LEEDUser Team
Thu, Sep 18, 2014
Cyprus - by LEEDUser Team
Thu, Sep 18, 2014
Greece - by LEEDUser Team
Thu, Sep 18, 2014
Italy - by LEEDUser Team
Thu, Sep 18, 2014
Macedonia - by LEEDUser Team
Thu, Sep 18, 2014
Malta - by LEEDUser Team
Thu, Sep 18, 2014
Montenegro - by LEEDUser Team
Thu, Sep 18, 2014
Suriname - by LEEDUser Team
Thu, Sep 18, 2014
Uruguay - by LEEDUser Team
Thu, Sep 18, 2014
Venezuela - by LEEDUser Team
Thu, Sep 18, 2014
Title Comments Most Recent Post Location
Default materials cost
in CS 2009 MRc4: Recycled Content
44 Agata Mozer
GO4IT SP Z OO SP K
Tue, Oct 25, 2016
RE: Campus
in Pilot Credit 14: Walkable Streets
145 Brenda Parker
Architect
The Columbus Architectural Studio
Tue, Oct 25, 2016
Project located in a building with a very low fresh air rate
in Retail-NC-v4: Minimum indoor air quality performance
1 Valentin Grimaud
Thermal Engineer
TERAO Green Building Engineering
Mon, Oct 24, 2016
Singapore
Social equity within the community
in NC-v4: Innovation
16 Miriam Ramírez Baumgarten
ARCH. LEED AP BD+C, ID+C
Revitaliza Consultores
Mon, Oct 24, 2016
Colombia
Rating System Selection
in LEED Rating System Selection Q&A
803 Francis McNulty
OCSC
Sun, Oct 23, 2016
RE: ampus vs project specific credits
in New LEED Guidance for Campuses and Multiple Buildings
578 Kai Starn
Sustainability Consultant
Steven Winter Associates
Sat, Oct 22, 2016
Pilot Credit Closed?
in NC-2009: LEED O+M Starter Kit
5 Angela Wisely
Fri, Oct 21, 2016
EBOM V4- IPM
in Hospitality-EBOM-v4: Integrated pest management
1 VISHESH AGARWAL
Fri, Oct 21, 2016
India
Phenol Formaldehyde (PF) Resins OK with v3?
in CI 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
56 Brian Salazar
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
Thu, Oct 20, 2016
Existing building demolition
in Healthcare-v2009: Construction waste management
1 Micah Vainikka
Preconstruction Manager
Knutson Construction
Thu, Oct 20, 2016
United States
Financial donation
in NC-v4: Site development - protect or restore habitat
17 Florian Schmidtchen
EGS-plan International GmbH
Thu, Oct 20, 2016
Germany
Are Phenolic Formaldehyde resins OK?
in CS 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
16 Brian Salazar
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
Wed, Oct 19, 2016
United States
LEED exercise with in a project
in NC 2009 SSp1: Construction Activity Pollution Prevention
299 Tota Yun
Wed, Oct 19, 2016
Saudi Arabia
Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%
in NC-v4: Outdoor water use reduction
25 Jing Zhang
Wed, Oct 19, 2016
RE: New USGBC Issued Materials & Resources Calculator v06
in NC 2009 MRc4: Recycled Content
632 Michelle Reott
LEED AP® BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC, a LEED® Proven Provider™
Wed, Oct 19, 2016
Waste to energy in LEED v3
in NC 2009 MRp1: Storage and Collection of Recyclables
80 Darya Lukicheva
Ms.
Tau Innovative Solutions
Wed, Oct 19, 2016
Kazakhstan
View Type 2 maximum distance
in NC-v4: Quality views
9 Steven Wychorski
Tue, Oct 18, 2016
United States
mixed non-potable and potable water used for irrigation
in EBOM-2009 WEc3: Water Efficient Landscaping
129 Pablo Fortunato Suarez
Principal ESD Consultant/Architect
GreenArc Sustainable Building & Architecture
Tue, Oct 18, 2016
Blind
in CI-v4: Thermal comfort
1 Ameet AA
Mon, Oct 17, 2016
Singapore
New Equipment with or without 0.5lb of Refrigerant
in CI 2009 EAp3: Fundamental Refrigerant Management
42 Michelle Rosenberger
Partner
ArchEcology, LLC
Mon, Oct 17, 2016
Title Comments Post date Most Recent Postsort icon Location
Historic site
in CS v4: High priority site
2 Jie Xiong
Fri, Nov 11, 2016
2016-11-11 01:52 China
testing of existing plumbing fixtures
in NC 2009 WEp1: Water Use Reduction—20% Reduction
775 Erin Holdenried
Sustainable Design Manager
AECOM
Thu, Nov 10, 2016
2016-11-10 11:41 Vietnam
Akvifer
in NC-v4: Renewable energy production
8 Sara Johansson
LEED® AP O+M
Sweco Systems
Thu, Nov 10, 2016
2016-11-10 11:22 Sweden
Achieving Innovation Design: MRc2 (95%)
in NC 2009 MRc2: Construction Waste Management
476 James Goldfield
Student
Thu, Nov 10, 2016
2016-11-10 08:06 United States
Custodial Staff Thermal Comfort
in NC 2009 IEQc7.2: Thermal Comfort—Verification
124 Jeannie Rueter
Green Building Analyst
Ausonio Incorporated
Wed, Nov 9, 2016
2016-11-09 17:59 United States
asphalt impregnated felt underlayment for under wood floor
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
528 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Tue, Nov 8, 2016
2016-11-08 15:27 United States
Exterior Applied Products: paving and athletic surfaces
in NC-v4: Low emitting materials
247 Allison Zuchman
The Green Engineer
The Green Engineer
Tue, Nov 8, 2016
2016-11-08 10:25 United States
Primer for Waterproofing membrane
in NC-v4: Low emitting materials
247 Leanne Conrad
Project Coordinator
Maple Reinders Constructors
Mon, Nov 7, 2016
2016-11-07 13:42 Canada
Fan Power and Fan Power Adjustment (FPA)
in NC 2009 EAp2: Minimum Energy Performance
3,816 Vassil Vassilev
Manager
Termoservice OOD
Mon, Nov 7, 2016
2016-11-07 07:40 Bulgaria
Software's for International Use
in NC-v4: Building life-cycle impact reduction
86 Aqrab Ali Rana
Mon, Nov 7, 2016
2016-11-07 06:10 Pakistan
LEED interpretation ID # 10235
in NC-v4: Heat island reduction
28 Juan Carlos Contreras
INEDIT
Sat, Nov 5, 2016
2016-11-05 20:05 Mexico
Case-2 Calculator
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
127 VISHESH AGARWAL
Sat, Nov 5, 2016
2016-11-05 05:25 India
Documents Required For pre-certification for LEED V4 Core Shell
in CS v4: Must be in a permanent location on existing land
2 Aqrab Ali Rana
Fri, Nov 4, 2016
2016-11-04 08:12 Pakistan
Increasing Baseline Static Pressure for Sound Regulations
in Schools-NC-v4: Optimize energy performance
2 Keith Lane
Project Engineer
Garcia Galuska DeSousa Consulting Engineers
Fri, Nov 4, 2016
2016-11-04 07:32 United States
Interesting tools but too expensive
in LEED Project Management Software
3 Andres Schwarz
Principal
NRG-AR
Thu, Nov 3, 2016
2016-11-03 19:30 Argentina
Default Space Susage Types - are there definitions?
in PIf3: Occupant and Usage Data
4 Stacey Olson
Associate, LEED AP, ID+C, BD+C, CID
Gensler
Thu, Nov 3, 2016
2016-11-03 15:48 United States
Historical Exemptions from Requirements
in Pilot Credit 14: Walkable Streets
145 Qiongwen Kong
Architect
COOPER CARRY
Thu, Nov 3, 2016
2016-11-03 15:40 United States
C&D Waste Recycling Calculations for 200 yr-old bldg renovation
in NC 2009 MRc2: Construction Waste Management
476 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Thu, Nov 3, 2016
2016-11-03 13:08 United States
Small entryways
in NC-v4: Enhanced indoor air quality strategies
16 Sara Johansson
LEED® AP O+M
Sweco Systems
Thu, Nov 3, 2016
2016-11-03 08:39 Sweden
shared waste area
in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables
83 Agata Mozer
GO4IT SP Z OO SP K
Thu, Nov 3, 2016
2016-11-03 08:16 Poland

Copyright 2016 – BuildingGreen, Inc.