Log in
Forum
Topic

Total Water Demand for Irrigation (Tank sizing, Plant Sizing, Network Sizing etc.)

NC-v4 WEp1: Outdoor water use reduction
posted by Tariq Muhammad on Oct 15, 2023, 3:57 am

Dear All,

As we know that the total water demand of irrigation do impact the Water storage Tank sizing, Plant sizing and Network sizing. The LEED calculator do provide the end rusult with...

Last reply: Afogreen Build, Apr 18, 2024, 9:00 pm

Declaration of Regional Material

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Osman Faroq on Nov 12, 2023, 8:03 am

Dear All, 

I would like to condsider the average recycled contenet for our Reabar of 25%. and also to consider the regional content factors (location factors) for our rebar product. 

...

Last reply: Afogreen Build, Apr 18, 2024, 8:54 pm

Can the Shower Rooms be included in the Tenant's Sale Lease Agreement?

CS-v4 LTc6: Bicycle facilities
posted by Nadia Garcia on Apr 18, 2024, 3:59 pm

Hello LEED community,

I'm seeking clarification regarding the Bicycle Facilities credit requirements in LEED v4 BD+C: Core & Shell, specifically regarding the inclusion of shower...

Innovation- Green Building Education

CS-v4 INc1: Innovation
posted by Luis Fretes on Apr 24, 2018, 2:28 pm

I have a couple of questions regarding the Green Building Education credit:

1) Can the Green Cleaning Policy be uploaded as it's own seperate Innovation Credit?

2) One of the...

Last reply: Adrienne Franz, Apr 18, 2024, 4:04 pm

IN- GREEN BUILDING EDUCATION

CS-v4 INc1: Innovation
posted by Dulce Solis on Oct 30, 2023, 12:29 pm

Has anyone implemented the second strategy in the guide "The development of a manual, guideline or case study to inform the design of other buildings based on the successes of this project."?...

Last reply: emily reese moody, Apr 18, 2024, 3:58 pm

Outdoor air in the Baseline Model

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 17, 2024, 3:06 pm

Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the...

Last reply: Rajat Wadhwa, Apr 18, 2024, 12:22 pm

RECs in EBOM 4.1

EBOM-v4.1 EAp3: Energy Performance
posted by Christian Garcia on Apr 18, 2024, 10:50 am

I came across an old video where it is explained this version doesn't take into account the purchase of RECs but it is considered for the future. This video is from 5 years ago. Does anyone know...

High Priority Site- Priority Destination for projects outside U.S.

CS-v4 LTc3: High priority site
posted by Sajna Cherur Nathankoden on Apr 18, 2024, 6:03 am

Hi, 
What are the examples for Priority Destination for projects outside U.S.?
Does Strategic Development Zones & Regeneration areas (defined by City Council) fall under priority...

Does Option 2. apply for underground parking

NC-v4.1 SSc5: Heat Island Reduction
posted by Gwenael JAN on Apr 17, 2024, 8:14 pm

Hello,

I would like to know if option 2 of SSc5 credit applies in the case of a project where the parking spaces are located underground, and therefore under the actual building. In a very...

Does a "Hot Zone" in a Fire Station need individual door closers?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Adrienne Franz on Apr 18, 2024, 10:09 am

Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus...