Would a fire sprinkler system count as "other process water"NC-v4 WEc4: Water meteringposted by Cindy Quinn on Apr 16, 2024, 9:08 pm
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"? TIA! Last reply: Andrey Kuznetsov, Apr 17, 2024, 2:46 am |
|
Waste management plan submission with multiple GC'sNC-v4 MRp2: Construction and demolition waste management planningposted by Blake Weaver on Dec 21, 2023, 4:52 pm
I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different... Last reply: Afogreen Build, Apr 16, 2024, 9:00 pm |
|
LTc Compact & ConnectedLEED v5 BD+C/ID+C: Location and Transportation Public Commentsposted by Emily Purcell on Apr 16, 2024, 2:07 pm
"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category." This language has posed a challenge for projects in v4/4.1... Last reply: Dave Hubka, Apr 16, 2024, 2:59 pm |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:45 pm
This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:39 pm
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
EAc Reduce peak thermal loadsLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Emily Purcell on Apr 16, 2024, 12:26 pm
Very happy to see a heavily weighted credit breaking out thermal loads from the whole building energy model credit. This will be a great incentive not to ignore envelope even in buildings where... |
|
Number of eligible Innovation credits from Pilot CreditsNC-v4 INc1: Innovationposted by Jason Garvens on Jan 15, 2018, 12:00 pm
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? The way I read the requirements in the Innovation section it would appear to be up to... Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm |
|
EAc2 Optimize Energy Performance: Baseline Building Heating SourceNC-v4 EAc2: Optimize Energy Performanceposted by Ricardo Sá on Apr 27, 2023, 5:43 am
Hello. I have a question regarding LEED v4 NC, EAc2 Optimize Energy Performance: We’re currently involved in a project that is considering the use of biomass as heating source (... Last reply: Afogreen Build, Apr 15, 2024, 8:55 pm |
|
LEED v5 O&M Existing Buildings public commentsLEED v5 O&M Existing Buildings Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:57 pmShare your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum. You can either reply to this thread or use the "Post a Question/Comment" button to start a... Last reply: Allen Rathey, Apr 15, 2024, 6:40 pm |
|
Wind PPA OR PV garden questionNC-v4 EAc5: Renewable energy productionposted by Kyu-min Lee on Apr 15, 2024, 1:29 pm
Hello,LEEDuser!!!! My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area) ...Last reply: Kyu-min Lee, Apr 15, 2024, 4:28 pm |