LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
Cannot upload after review comments
in Living with LEED Online - quirks, bugs and hiccups
136 Robert Wichert
Engineer
Fri, Aug 22, 2014
RE: WEp1 Exemption?
in CI 2009 WEp1: Water Use Reduction—20% Reduction
211 Scott Adams
Principal
Sustainable Integration LLC
Fri, Aug 22, 2014
RE: LEED NC 2009 EAc5 Measurement and Verification
in NC 2009 EAc5: Measurement and Verification
192 Pat Thomas
Principal
Sustainability Services
Fri, Aug 22, 2014
RE: rainwater calculation
in NC 2009 WEc1: Water Efficient Landscaping
352 Scott Adams
Principal
Sustainable Integration LLC
Fri, Aug 22, 2014
RE: Contract through Design Team - conflicting information
in NC 2009 EAp1: Fundamental Commissioning of Building Energy Systems
237 jorge torres coto
Building Systems Commissioning Engineer
Empirical Engineering, LLC
Fri, Aug 22, 2014
RE: Shading from Adjacent buildings
in NC-v4: Minimum energy performance
4 Marcus Sheffer
LEED Fellow
7group
Fri, Aug 22, 2014
CO2 sensors in exhaust air duct
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
51 Mathilda Jonsson
Environmental Certification Engineer (LEED AP BD+C)
Skanska
Fri, Aug 22, 2014
Building Energy Metering - Third Party Source
in CS v4: Building-level energy metering
1 Sean Hogan
LEED AP
RKD Architects
Fri, Aug 22, 2014
RE: Psychrometric Chart and 6.1.1 Documentation
in NC 2009 IEQc7.1: Thermal Comfort—Design
191 Omar Katanani
Fri, Aug 22, 2014
Average Full Flush and Low Flush
in Retail–CI-v2009: Water use reduction
3 Geraldine Assmus
Sustentator
Thu, Aug 21, 2014
RE: LEED NC 2009 for factory buildings
in NC 2009 EAp2: Minimum Energy Performance
2,331 Arthur Santos
Thu, Aug 21, 2014
Multi-Family Residential Options
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
247 Alexis Thompson
Project Coordinator
Sellen Sustainability
Thu, Aug 21, 2014
RE: Museum/Visitor Center Exhibit rooms
in NC 2009 IEQc8.1: Daylight and Views—Daylight
619 Todd Reed
Daylight Designer
7group
Thu, Aug 21, 2014
Commerical Clothes Washers
in Start a New LEED Discussion Topic
124 Laura MacSweeney
Thu, Aug 21, 2014
RE: Lights off at 10:00 p.m.
in CS 2009 SSc8: Light Pollution Reduction
134 Bill Swanson
PE, LEED AP
Integrated Architecture
Thu, Aug 21, 2014
RE: Private Bus Service
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
199 Donald Green
Project Manager
Sustainable Design Consulting, LLC
Thu, Aug 21, 2014
RE: Rotating Lab Equipment and How to Include It?
in NC 2009 EAc1: Optimize Energy Performance
1,067 Marcus Sheffer
LEED Fellow
7group
Thu, Aug 21, 2014
Cork flooring on product doesnt meet Floorscore or CA, but.....
in CI 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
103 Valerie Molinski
Director of Sustainability
Vocon
Thu, Aug 21, 2014
RE: LEED Project Boundary
in MPR3: Must use a reasonable site boundary
195 Renaud Gay
Shanghai Pacific Energy Center
Thu, Aug 21, 2014
RE: fire supression gas FM200
in CS 2009 EAc4: Enhanced Refrigerant Management
42 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Wed, Aug 20, 2014
Title Comments Most Recent Post
RE: WEp1 Exemption?
in CI 2009 WEp1: Water Use Reduction—20% Reduction
211 Scott Adams
Principal
Sustainable Integration LLC
Fri, Aug 22, 2014
RE: LEED NC 2009 EAc5 Measurement and Verification
in NC 2009 EAc5: Measurement and Verification
192 Pat Thomas
Principal
Sustainability Services
Fri, Aug 22, 2014
RE: rainwater calculation
in NC 2009 WEc1: Water Efficient Landscaping
352 Scott Adams
Principal
Sustainable Integration LLC
Fri, Aug 22, 2014
RE: Contract through Design Team - conflicting information
in NC 2009 EAp1: Fundamental Commissioning of Building Energy Systems
237 jorge torres coto
Building Systems Commissioning Engineer
Empirical Engineering, LLC
Fri, Aug 22, 2014
RE: Shading from Adjacent buildings
in NC-v4: Minimum energy performance
4 Marcus Sheffer
LEED Fellow
7group
Fri, Aug 22, 2014
CO2 sensors in exhaust air duct
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
51 Mathilda Jonsson
Environmental Certification Engineer (LEED AP BD+C)
Skanska
Fri, Aug 22, 2014
Building Energy Metering - Third Party Source
in CS v4: Building-level energy metering
1 Sean Hogan
LEED AP
RKD Architects
Fri, Aug 22, 2014
RE: Psychrometric Chart and 6.1.1 Documentation
in NC 2009 IEQc7.1: Thermal Comfort—Design
191 Omar Katanani
Fri, Aug 22, 2014
Average Full Flush and Low Flush
in Retail–CI-v2009: Water use reduction
3 Geraldine Assmus
Sustentator
Thu, Aug 21, 2014
RE: LEED NC 2009 for factory buildings
in NC 2009 EAp2: Minimum Energy Performance
2,331 Arthur Santos
Thu, Aug 21, 2014
Multi-Family Residential Options
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
247 Alexis Thompson
Project Coordinator
Sellen Sustainability
Thu, Aug 21, 2014
RE: Museum/Visitor Center Exhibit rooms
in NC 2009 IEQc8.1: Daylight and Views—Daylight
619 Todd Reed
Daylight Designer
7group
Thu, Aug 21, 2014
RE: Lights off at 10:00 p.m.
in CS 2009 SSc8: Light Pollution Reduction
134 Bill Swanson
PE, LEED AP
Integrated Architecture
Thu, Aug 21, 2014
RE: Private Bus Service
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
199 Donald Green
Project Manager
Sustainable Design Consulting, LLC
Thu, Aug 21, 2014
RE: Rotating Lab Equipment and How to Include It?
in NC 2009 EAc1: Optimize Energy Performance
1,067 Marcus Sheffer
LEED Fellow
7group
Thu, Aug 21, 2014
Cork flooring on product doesnt meet Floorscore or CA, but.....
in CI 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
103 Valerie Molinski
Director of Sustainability
Vocon
Thu, Aug 21, 2014
RE: LEED Project Boundary
in MPR3: Must use a reasonable site boundary
195 Renaud Gay
Shanghai Pacific Energy Center
Thu, Aug 21, 2014
RE: fire supression gas FM200
in CS 2009 EAc4: Enhanced Refrigerant Management
42 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Wed, Aug 20, 2014
Another "is it a roof or is it hardscape" inquiry
in NC 2009 SSc7.2: Heat Island Effect—Roof
261 Susan Di Giulio
Project Manager
Zinner Consultants
Wed, Aug 20, 2014
RE: Building that Meets Requirements but ALSO has Lead Paint
in NC 2009 SSc3: Brownfield Redevelopment
95 Larry Sims
Principal
Studio4, LLC
Wed, Aug 20, 2014
Title Comments Most Recent Post
Cannot upload after review comments
in Living with LEED Online - quirks, bugs and hiccups
136 Robert Wichert
Engineer
Fri, Aug 22, 2014
Commerical Clothes Washers
in Start a New LEED Discussion Topic
124 Laura MacSweeney
Thu, Aug 21, 2014
RE: Campus-Same master site- LEED NC v4 and LEED EBOM 2009
in New LEED Guidance for Campuses and Multiple Buildings
495 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Tue, Aug 19, 2014
RE: "closing out" procedure
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
557 Marcus Sheffer
LEED Fellow
7group
Mon, Aug 18, 2014
RE: LEED NC or Healthcare for an Oupatient Building with 24h ER
in LEED Rating System Selection Q&A
600 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Aug 18, 2014
RE: CARB and ECO-Certified
in New Rules for Formaldehyde in IEQc4.4
7 Nick _
Architect, LEED AP
Wed, Aug 13, 2014
RE: Thanks Tristan!
in GBCI Invites Direct Inquiries—But Do Your Homework First
19 Megan Ritchie Saffitz
Director of LEED Support
U.S. Green Building Council
Mon, Aug 11, 2014
RE: LEED Interpretation: Effective Date
in Review Comments with Phantom Requirements
89 Hernando Miranda
Owner
Soltierra LLC
Fri, Aug 8, 2014
Defering Design credit
in Defer Credits
4 Stella Stella
Thu, Aug 7, 2014
RE: hotel with restaurant
in Calculating FTEs
184 LEEDme STRATEGIE D'IMPRESA
Mon, Aug 4, 2014
RE: plaque presentation
in 17 critical—and misunderstood—LEED terms
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Jul 31, 2014
RE: LEED Volume Program - Submittal Guidance
in Forum for LEED Volume Program Certification
7 Ashley Catlett
USGBC/GBCI
Wed, Jul 30, 2014
RE: LEED AP BD+C V4
in Experience Requirement Loosened for LEED v4 AP Exam
12 Filipe Boni
Brain
Wed, Jul 23, 2014
RE: Project Registration Required
in A New, More Accessible LEED Online for LEED v4
10 Megan Sparks
Manager, Program Integration
U.S. Green Building Council
Wed, Jul 23, 2014
RE: LEED v4 Green Associate
in 10 Tips for Passing the LEED Green Associate Exam
57 Tonima Ferdous
Thu, Jul 17, 2014
LEED v4 CIR
in Got Technical Questions on LEED v4?
54 Charalampos Giannikopoulos
Mon, Jul 14, 2014
RE: Large footage residence and threshold adjustment
in LEED for Homes (LEED-H) Forum
131 Ann Edminster
founder/principal
Design AVEnues LLC
Tue, Jul 8, 2014
RE: Licensed Professional Exemption (LPE) - outside of USA
in Licensed Professional Exemption
19 Sylvain laporte
GASD-Co
Tue, Jul 8, 2014
RE: Reusing IO credits for recertification
in Recertification
58 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Thu, Jul 3, 2014
LEED Membership Statistics Tool
in LEED App Store Coming Soon – What's on Your Wish-List?
4 Spencer Kim
Mon, Jun 30, 2014
Title Votes Comments Most Recent Post
RE: Low VOC
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
351 70 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Nov 12, 2009
Outside of the US
in CS 2009 EAc6: Green Power
341 68 Pia Öhrling
WSP
Mon, Sep 21, 2009
RE: Outside of the US
in CS 2009 EAc6: Green Power
341 68 Gunnar Hubbard, AIA, LEED Fellow
Principal
Thornton Tomasetti
Fri, Sep 25, 2009
RE: Process water for EP point
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
339 51 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Wed, Dec 23, 2009
Low VOC
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
338 70 Rona Easton
HOK
Thu, Nov 12, 2009
RE: What constitutes a "Master Plan"?
in Schools 2009 SSc9: Site Master Plan
332 21 Shannon Gray
Consultant
YRG sustainability
Mon, Jan 4, 2010
RE: Site Master Plan - Recalculations
in Schools 2009 SSc9: Site Master Plan
331 21 Shannon Gray
Consultant
YRG sustainability
Mon, Dec 7, 2009
Tenant spaces are simple, right?
in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
330 79 Richard McKay
Mon, Feb 1, 2010
RE: Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
328 122 Steve Loppnow
Sustainability Manager
YR&G
Mon, Dec 7, 2009
RE: 7th ed. Massachusetts Building Code and ASHRAE 62.1-2004
in NC 2009 IEQc2: Increased Ventilation
328 79 Paul Girello
Fri, Jan 22, 2010
Master Plan:Open Space
in Schools 2009 SSc9: Site Master Plan
325 21 Erik Bergstrom
Green Building Associate
Wed, Dec 9, 2009
RE: Question Regarding Requirements
in Schools 2009 IEQc8.2: Daylight and Views—Views
322 63 Joshua Radoff
Principal, LEEDuser Primary Author
YRG sustainability
Wed, Sep 30, 2009
RE: Retail space parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
321 122 Devon Bertram
Sustainability Manager
YR&G
Mon, Dec 7, 2009
Creating the Floor Plan to show direct access to views
in Schools 2009 IEQc8.2: Daylight and Views—Views
320 63 Kim Pomeranz
Thu, Oct 8, 2009
Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
319 122 Peter Doo
President
Doo Consulting, LLC
Tue, Nov 17, 2009
Site Master Plan - Recalculations
in Schools 2009 SSc9: Site Master Plan
319 21 Erik Bergstrom
Green Building Associate
Mon, Dec 7, 2009
RE: Creating the Floor Plan to show direct access to views
in Schools 2009 IEQc8.2: Daylight and Views—Views
319 63 Joshua Lloyd
Phillip Markwood Architects
Thu, Oct 8, 2009
RE: Is this a typo?
in CS 2009 MRc6: Certified Wood
317 30 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 29, 2009
The Square Footage
in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
316 86 Alejandro Alfaro
Project Director Mexico
PGAL
Wed, Dec 9, 2009
RE: Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
316 122 Mara Baum
Healthcare Sustainable Design Leader, LEED Fellow
HOK
Tue, Dec 8, 2009
Title Comments Most Recent Post
Cannot upload after review comments
in Living with LEED Online - quirks, bugs and hiccups
136 Robert Wichert
Engineer
Fri, Aug 22, 2014
Survey Completion
in CI 2009 IEQc7.2: Thermal Comfort—Verification
18 Elliot Young
Fri, Aug 22, 2014
CO2 sensors in exhaust air duct
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
51 Mathilda Jonsson
Environmental Certification Engineer (LEED AP BD+C)
Skanska
Fri, Aug 22, 2014
Building Energy Metering - Third Party Source
in CS v4: Building-level energy metering
1 Sean Hogan
LEED AP
RKD Architects
Fri, Aug 22, 2014
Average Full Flush and Low Flush
in Retail–CI-v2009: Water use reduction
3 Geraldine Assmus
Sustentator
Thu, Aug 21, 2014
Multi-Family Residential Options
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
247 Alexis Thompson
Project Coordinator
Sellen Sustainability
Thu, Aug 21, 2014
Commerical Clothes Washers
in Start a New LEED Discussion Topic
124 Laura MacSweeney
Thu, Aug 21, 2014
LEEDv4 MPRs - Definition of Single Building
in Start a New LEED Discussion Topic
124 Kacy Wander
Sustainability Coordinator
JacobsWyper Architects
Thu, Aug 21, 2014
Cork flooring on product doesnt meet Floorscore or CA, but.....
in CI 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
103 Valerie Molinski
Director of Sustainability
Vocon
Thu, Aug 21, 2014
Old HVAC equipment transferred from other site
in NC 2009 EAp2: Minimum Energy Performance
2,331 Yastimy Jupson
Green Building Consultant
Thu, Aug 21, 2014
land that may be excluded from LEED project boundary....
in MPR3: Must use a reasonable site boundary
195 Michael Johnson
Architect
Chenevert Architects
Wed, Aug 20, 2014
Another "is it a roof or is it hardscape" inquiry
in NC 2009 SSc7.2: Heat Island Effect—Roof
261 Susan Di Giulio
Project Manager
Zinner Consultants
Wed, Aug 20, 2014
Performance Period and this credit
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
80 Sara Zoumbaris
Wed, Aug 20, 2014
EAp1
in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems
46 Donald Green
Project Manager
Sustainable Design Consulting, LLC
Wed, Aug 20, 2014
Ductwork
in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
104 Megan Bove
Wed, Aug 20, 2014
Outdoor air requirements in corridors
in NC-2009 IEQp1: Minimum IAQ Performance
752 Pedro Ribeiro
Director of Sustainability
Edifícios Saudáveis Consultores
Wed, Aug 20, 2014
Thresholds, Prerequisites, Lease Language, 10102
in MPR2: Must be a complete, permanent building or space
112 Katie Peterschmidt
Associate Director, CORE Steward
Cooper Carry
Tue, Aug 19, 2014
FTE calculation for a Dorm
in PIf3: Occupant and Usage Data
187 Nena Elise
Tue, Aug 19, 2014
Please update checklist above
in NC 2009 IEQc1: Outdoor Air Delivery Monitoring
239 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Tue, Aug 19, 2014
Commissioning and CO now
in Start a New LEED Discussion Topic
124 john mia
Tue, Aug 19, 2014

Copyright 2014 – BuildingGreen, Inc.