LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: Acoustics study
in NC 2009 IDc1: Innovation in Design
356 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, May 18, 2013
SS1 Option 2 Path 11 With Tenant installing PV
in CI 2009 SSc1: Site Selection
159 Susan Di Giulio
Project Manager
Zinner Consultants
Sat, May 18, 2013
changing prerequisite completed forms
in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
8 Linda Francis
President
Francis Consulting
Sat, May 18, 2013
RE: Percantage Make-Up
in Healthcare-v2009: Sustainably sourced materials and products
5 BABAR MEHMOOD
SAUD CONSULT
Sat, May 18, 2013
RE: Casework
in NC 2009 MRc7: Certified Wood
238 Jason Grant
Principal
Jason Grant Consulting
Fri, May 17, 2013
School addition - LEED Boundary
in MPR3: Must use a reasonable site boundary
96 padraic o connell
Fri, May 17, 2013
RE: Recycled Soil and Aggregate
in NC 2009 MRc4: Recycled Content
255 Lyle Axelarris
Civil Engineer, LEED AP BD+C, O+M
Design Alaska
Fri, May 17, 2013
RE: Good to know
in The Hidden Beltway Lobbyists Who Shape Green Building Policy
13 Paula Melton
Managing Editor
BuildingGreen, Inc.
Fri, May 17, 2013
RE: Building Envelope Commissioning LEED required test methodology
in NC 2009 EAc3: Enhanced Commissioning
169 Brett Farbstein
Commissioning Engineer
AKF Group
Fri, May 17, 2013
RE: Form Questions
in Healthcare-v2009: Acoustic environment
7 BABAR MEHMOOD
SAUD CONSULT
Fri, May 17, 2013
RE: Entry mat in vestibule w/ tile surround
in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 17, 2013
Canada-NC 1.0 -- EAc1
in LEED Canada Forum
14 Laura Long
Project Manager
NORR
Fri, May 17, 2013
RE: Meaning of "Ready to Use Products"
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
333 Alicia Silva
CEO
Revitaliza consultores
Fri, May 17, 2013
CS - Residential Building
in MPR6: Must commit to sharing whole-building energy and water usage data
10 CRolim Engenharia
Fri, May 17, 2013
RE: LEV discounted parking
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
209 BABAR MEHMOOD
SAUD CONSULT
Fri, May 17, 2013
RE: Ventilated attic roofs - Baseline Vs Proposed
in CS 2009 EAc1: Optimize Energy Performance
207 Marcus Sheffer
LEED Fellow
7group
Fri, May 17, 2013
RE: Design Respons from GBCI C6.1
in NC 2009 SSc6.1: Stormwater Design—Quantity Control
111 Michael DeVuono
T&M Associates
Fri, May 17, 2013
RE: Educational Program
in CS 2009 IDc1: Innovation in Design
42 Morteza Kasmaei
Principal
Climatic Design Inc.
Fri, May 17, 2013
Vertical addition to a hotel project
in MPR2: Must be a complete, permanent building or space
45 Adam Targowski
Owner
ATsec
Fri, May 17, 2013
RE: Determining FTE, PTE
in PIf3: Occupant and Usage Data
94 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 17, 2013
Title Comments Most Recent Post
RE: Acoustics study
in NC 2009 IDc1: Innovation in Design
356 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, May 18, 2013
SS1 Option 2 Path 11 With Tenant installing PV
in CI 2009 SSc1: Site Selection
159 Susan Di Giulio
Project Manager
Zinner Consultants
Sat, May 18, 2013
changing prerequisite completed forms
in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
8 Linda Francis
President
Francis Consulting
Sat, May 18, 2013
RE: Percantage Make-Up
in Healthcare-v2009: Sustainably sourced materials and products
5 BABAR MEHMOOD
SAUD CONSULT
Sat, May 18, 2013
RE: Casework
in NC 2009 MRc7: Certified Wood
238 Jason Grant
Principal
Jason Grant Consulting
Fri, May 17, 2013
School addition - LEED Boundary
in MPR3: Must use a reasonable site boundary
96 padraic o connell
Fri, May 17, 2013
RE: Recycled Soil and Aggregate
in NC 2009 MRc4: Recycled Content
255 Lyle Axelarris
Civil Engineer, LEED AP BD+C, O+M
Design Alaska
Fri, May 17, 2013
RE: Building Envelope Commissioning LEED required test methodology
in NC 2009 EAc3: Enhanced Commissioning
169 Brett Farbstein
Commissioning Engineer
AKF Group
Fri, May 17, 2013
RE: Form Questions
in Healthcare-v2009: Acoustic environment
7 BABAR MEHMOOD
SAUD CONSULT
Fri, May 17, 2013
RE: Entry mat in vestibule w/ tile surround
in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 17, 2013
RE: Meaning of "Ready to Use Products"
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
333 Alicia Silva
CEO
Revitaliza consultores
Fri, May 17, 2013
CS - Residential Building
in MPR6: Must commit to sharing whole-building energy and water usage data
10 CRolim Engenharia
Fri, May 17, 2013
RE: LEV discounted parking
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
209 BABAR MEHMOOD
SAUD CONSULT
Fri, May 17, 2013
RE: Ventilated attic roofs - Baseline Vs Proposed
in CS 2009 EAc1: Optimize Energy Performance
207 Marcus Sheffer
LEED Fellow
7group
Fri, May 17, 2013
RE: Design Respons from GBCI C6.1
in NC 2009 SSc6.1: Stormwater Design—Quantity Control
111 Michael DeVuono
T&M Associates
Fri, May 17, 2013
RE: Educational Program
in CS 2009 IDc1: Innovation in Design
42 Morteza Kasmaei
Principal
Climatic Design Inc.
Fri, May 17, 2013
Vertical addition to a hotel project
in MPR2: Must be a complete, permanent building or space
45 Adam Targowski
Owner
ATsec
Fri, May 17, 2013
RE: Determining FTE, PTE
in PIf3: Occupant and Usage Data
94 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, May 17, 2013
green roof cover - ivy
in CS 2009 SSc7.2: Heat Island Effect—Roof
83 Mario Pinoli
Fri, May 17, 2013
Room by Room flush-out Calculations
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
124 Lauren Glasscock
Sr. Sustainability Professional
DNV KEMA Energy & Sustainability
Thu, May 16, 2013
Title Comments Most Recent Post
RE: Good to know
in The Hidden Beltway Lobbyists Who Shape Green Building Policy
13 Paula Melton
Managing Editor
BuildingGreen, Inc.
Fri, May 17, 2013
Canada-NC 1.0 -- EAc1
in LEED Canada Forum
14 Laura Long
Project Manager
NORR
Fri, May 17, 2013
RE: Performance Period starts after construction
in Performance Period
40 Karin Wohlert
Northwest Sustainability Consulting, LLC
Thu, May 16, 2013
LEED Campus vs LEED Schools vs LEED NC
in LEED Rating System Selection Q&A
331 Caroline Hedin
Thu, May 16, 2013
RE: Deleted Uploads Reviewed
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
332 Hernando Miranda
Owner
Soltierra LLC
Thu, May 16, 2013
RE: (Jacob) Calculating for Future Growth
in Calculating FTEs
135 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, May 14, 2013
RE: U-Value Units Conversion
in International Projects - alternative compliance path
116 Daniela Castro Salgado
LEED AP BD+C / Sustainability Coordinator
Edmonds International Ltd
Tue, May 14, 2013
RE: about that working group....
in USGBC Engages Chemical Supply Chain with New LEED v4 Option
36 Marian Keeler
Senior Associate
Thornton Tomasetti / Simon & Associates
Mon, May 13, 2013
RE: Cannot login to LEED Online..
in Living with LEED Online - quirks, bugs and hiccups
103 Francisca Herrera
Miranda & Nasi
Mon, May 13, 2013
RE: V4 implementation and '09 phase out
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
29 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 10, 2013
RE: Master Site and different buidings certifications
in New LEED Guidance for Campuses and Multiple Buildings
318 Eric Anderson
Technical Customer Service Specialist
GBCI
Fri, May 10, 2013
LEED Signage for display inside Gold certified office building
in Start a New LEED Discussion Topic
9 Jeff Zunt
THORSON BAKER & Associates, Inc
Sun, May 5, 2013
Tenant Sales or Lease Agreement
in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
19 Julie Hendricks
Director of EcoServices
Kirksey
Sun, May 5, 2013
RE: BD&C Exam Prep
in Earn CEUs on LEEDuser—With Ease
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 30, 2013
RE: What is a self-reported course that qualifies for CMP
in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
40 Erin Emery Hartz
Manager, Marketing & Product Development
U.S. Green Building Council
Tue, Apr 30, 2013
RE: new database
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
27 Elizabeth Thompson
LEED Specialist
USGBC
Mon, Apr 29, 2013
All LEED sample forms
in Sample LEED Online credit forms
3 E H
Sustainability Architect
Mon, Apr 29, 2013
RE: Title-24 and DES
in New District Energy Guidance for LEED Released by USGBC
36 Eddy Santosa
Sustainable Design Coordinator
HMC Architects
Wed, Apr 24, 2013
RE: Can you submit Design Appeal after Construction?
in Review Appeal
22 ERIC WANG
Mon, Apr 22, 2013
RE: Licensed Professional Exemption (LPE) - outside of USA
in Licensed Professional Exemption
18 John Covello
LEED and Sustainability Manager
Development Management Group
Mon, Apr 22, 2013
Title Votes Comments Most Recent Post
RE: Low VOC
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
325 55 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Nov 12, 2009
RE: Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
325 84 Steve Loppnow
Sustainability Manager
YR&G
Mon, Dec 7, 2009
RE: Process water for EP point
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
325 55 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Wed, Dec 23, 2009
Tenant spaces are simple, right?
in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
323 57 Richard McKay
Mon, Feb 1, 2010
RE: Outside of the US
in CS 2009 EAc6: Green Power
321 40 Gunnar Hubbard, AIA, LEED Fellow
Principal
Thornton Tomasetti
Fri, Sep 25, 2009
RE: Retail space parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
319 84 Devon Bertram
Sustainability Manager
YR&G
Mon, Dec 7, 2009
Low VOC
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
316 55 Rona Easton
HOK
Thu, Nov 12, 2009
Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
316 84 Peter Doo
Doo Consulting LLC
Tue, Nov 17, 2009
RE: Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
313 84 Mara Baum
Healthcare Sustainable Design Leader
HOK
Tue, Dec 8, 2009
Site Master Plan - Recalculations
in Schools 2009 SSc9: Site Master Plan
313 19 Erik Bergstrom
Green Building Associate
Mon, Dec 7, 2009
RE: Creating the Floor Plan to show direct access to views
in Schools 2009 IEQc8.2: Daylight and Views—Views
310 55 Joshua Lloyd
Phillip Markwood Architects
Thu, Oct 8, 2009
RE: Question Regarding Requirements
in Schools 2009 IEQc8.2: Daylight and Views—Views
309 55 Joshua Radoff
Principal, LEEDuser Primary Author
YRG sustainability
Wed, Sep 30, 2009
Creating the Floor Plan to show direct access to views
in Schools 2009 IEQc8.2: Daylight and Views—Views
307 55 Kim Pomeranz
Thu, Oct 8, 2009
Outside of the US
in CS 2009 EAc6: Green Power
306 40 Pia Öhrling
WSP
Mon, Sep 21, 2009
RE: M&V plan required for case 1, or not?
in CI 2009 EAc3: Measurement and Verification
305 74 Dave Intner
Firmitas Architecture & Planning
Mon, Dec 21, 2009
RE: Is this a typo?
in CS 2009 MRc6: Certified Wood
304 23 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 29, 2009
RE: Retail space parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
304 84 Devon Bertram
Sustainability Manager
YR&G
Thu, Dec 10, 2009
Master Plan:Open Space
in Schools 2009 SSc9: Site Master Plan
304 19 Erik Bergstrom
Green Building Associate
Wed, Dec 9, 2009
The Square Footage
in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
303 62 Alejandro Alfaro
Project Director Mexico
PGAL
Wed, Dec 9, 2009
RE: CI IEQ p1 ASHRAE 62.1-2007 calculator
in CI-2009 IEQp1: Minimum IAQ Performance
302 96 Shannon Gray
Consultant
YRG sustainability
Wed, Nov 25, 2009
Title Comments Most Recent Post
Construction Waste Management (Material & Resources : Credit 2)
in NC v2.2 MRc2: Construction Waste Management
95 Prabhu Jaysingh
Sun, May 19, 2013
SS1 Option 2 Path 11 With Tenant installing PV
in CI 2009 SSc1: Site Selection
159 Susan Di Giulio
Project Manager
Zinner Consultants
Sat, May 18, 2013
changing prerequisite completed forms
in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
8 Linda Francis
President
Francis Consulting
Sat, May 18, 2013
School addition - LEED Boundary
in MPR3: Must use a reasonable site boundary
96 padraic o connell
Fri, May 17, 2013
Canada-NC 1.0 -- EAc1
in LEED Canada Forum
14 Laura Long
Project Manager
NORR
Fri, May 17, 2013
CS - Residential Building
in MPR6: Must commit to sharing whole-building energy and water usage data
10 CRolim Engenharia
Fri, May 17, 2013
Vertical addition to a hotel project
in MPR2: Must be a complete, permanent building or space
45 Adam Targowski
Owner
ATsec
Fri, May 17, 2013
green roof cover - ivy
in CS 2009 SSc7.2: Heat Island Effect—Roof
83 Mario Pinoli
Fri, May 17, 2013
Room by Room flush-out Calculations
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
124 Lauren Glasscock
Sr. Sustainability Professional
DNV KEMA Energy & Sustainability
Thu, May 16, 2013
Who develops the plan for corrective action?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
61 Nicole Kimoto
Thu, May 16, 2013
Allowable VOC
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
333 Mike Stopka
Director of Sustainability
Solomon Cordwell Buenz
Thu, May 16, 2013
LEED Campus vs LEED Schools vs LEED NC
in LEED Rating System Selection Q&A
331 Caroline Hedin
Thu, May 16, 2013
Comprehensive waste management program
in CS 2009 MRp1: Storage and Collection of Recyclables
31 Michael E. Edmonds-Bauer
Edmonds International
Thu, May 16, 2013
"wood wars"
in NC 2009 MRc7: Certified Wood
238 Doreen Kruschina
Doreen Kruschina Planung+Baumanagement
Thu, May 16, 2013
Municipal tertiary treated water transported in on tankers?
in NC 2009 WEc1: Water Efficient Landscaping
234 Natalie Tan
Thu, May 16, 2013
Material reuse based on cost or volume
in NC 2009 MRc3: Materials Reuse
45 Mahbuba Khan
President
MnKhan Architects PLLC
Thu, May 16, 2013
Non-US Projects
in CI 2009 IEQc2: Increased Ventilation
5 Phillip Cook
WGE
Wed, May 15, 2013
LEED vs Global Green vs The next rating system
in The Hidden Beltway Lobbyists Who Shape Green Building Policy
13 Wyan DeFilippo
LEED AP BD+C
Green Work Experience
Wed, May 15, 2013
Property Boundry.
in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
1 Phillip Cook
WGE
Wed, May 15, 2013
Timeline on reports
in EBOM 2009 EAp3: Fundamental Refrigerant Management
55 Hugh Hagues
University Centers Assist. Director
University of California, San Diego
Wed, May 15, 2013

Copyright 2013 – BuildingGreen, Inc.