LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: Transient Peak vs. Transient Daily Average
in PIf3: Occupant and Usage Data
182 Nate Steeber
LEED Consultant & Designer
Sol Developments
Mon, Jul 28, 2014
RE: Major Change to Who Can Be a CxA!
in NC-2009 EAc3: Enhanced Commissioning
247 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Mon, Jul 28, 2014
RE: Flooring & Composite Wood Emissions and Content Standards
in NC-v4: Low emitting materials
30 Michelle Halle Stern
LEED Fellow
The Green Facilitator
Mon, Jul 28, 2014
RE: Submitting documents on LEED online for EAc4
in NC 2009 EAc4: Enhanced Refrigerant Management
101 Mridul Sarkar
Mechanical Engineer
Dar Al-Handasah
Sun, Jul 27, 2014
RE: Using 5% of Total Parking Slots instead of 5% of FTE
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
119 Michelle Robinson
Re:Vision Architecture
Sat, Jul 26, 2014
RE: SS7.2 Heat Island Effect Roof - Material with no SRI
in CS 2009 SSc7.2: Heat Island Effect—Roof
95 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Vegetated area requirement
in CS 2009 SSc5.1: Site Development—Protect or Restore Habitat
94 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Allocating Tenant Plumbing Systems to Core & Shell
in CS 2009 WEc3: Water Use Reduction
14 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Water Teatment Plant
in CS 2009 WEc2: Innovative Wastewater Technologies
21 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: applicability of the project
in CI 2009 IEQc7.2: Thermal Comfort—Verification
18 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Playing fields exclusion NC 2009
in Schools 2009 WEc1: Water Efficient Landscaping
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Stormwater tank
in CS 2009 WEc1: Water Efficient Landscaping
55 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Raised Access Floors (specialist)
in CI 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
102 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Difference VOC emissions - VOC content (adhesives and sealants)
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
64 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: FTE Calculation
in Calculating FTEs
182 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Utility Trenches Part of Project Boundary?
in PIf4: Schedule and Overview Documents
59 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: How to interpret "Huddle Rooms"?
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
316 Brian Salazar
President, LEED AP BD+C
Entegra Development & Investment, LLC
Sat, Jul 26, 2014
RE: IAQ Option #1
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
243 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: ASTM Comparison
in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
80 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: EP credit
in EBOM 2009 IEQc2.4: Daylight and Views
68 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
Title Comments Most Recent Post
RE: Transient Peak vs. Transient Daily Average
in PIf3: Occupant and Usage Data
182 Nate Steeber
LEED Consultant & Designer
Sol Developments
Mon, Jul 28, 2014
RE: Major Change to Who Can Be a CxA!
in NC-2009 EAc3: Enhanced Commissioning
247 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Mon, Jul 28, 2014
RE: Flooring & Composite Wood Emissions and Content Standards
in NC-v4: Low emitting materials
30 Michelle Halle Stern
LEED Fellow
The Green Facilitator
Mon, Jul 28, 2014
RE: Submitting documents on LEED online for EAc4
in NC 2009 EAc4: Enhanced Refrigerant Management
101 Mridul Sarkar
Mechanical Engineer
Dar Al-Handasah
Sun, Jul 27, 2014
RE: Using 5% of Total Parking Slots instead of 5% of FTE
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
119 Michelle Robinson
Re:Vision Architecture
Sat, Jul 26, 2014
RE: SS7.2 Heat Island Effect Roof - Material with no SRI
in CS 2009 SSc7.2: Heat Island Effect—Roof
95 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Vegetated area requirement
in CS 2009 SSc5.1: Site Development—Protect or Restore Habitat
94 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Allocating Tenant Plumbing Systems to Core & Shell
in CS 2009 WEc3: Water Use Reduction
14 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Water Teatment Plant
in CS 2009 WEc2: Innovative Wastewater Technologies
21 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: applicability of the project
in CI 2009 IEQc7.2: Thermal Comfort—Verification
18 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Playing fields exclusion NC 2009
in Schools 2009 WEc1: Water Efficient Landscaping
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Stormwater tank
in CS 2009 WEc1: Water Efficient Landscaping
55 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Raised Access Floors (specialist)
in CI 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
102 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Difference VOC emissions - VOC content (adhesives and sealants)
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
64 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Utility Trenches Part of Project Boundary?
in PIf4: Schedule and Overview Documents
59 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: How to interpret "Huddle Rooms"?
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
316 Brian Salazar
President, LEED AP BD+C
Entegra Development & Investment, LLC
Sat, Jul 26, 2014
RE: IAQ Option #1
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
243 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: ASTM Comparison
in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
80 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: EP credit
in EBOM 2009 IEQc2.4: Daylight and Views
68 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: Scheduling
in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
103 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
Title Comments Most Recent Post
RE: FTE Calculation
in Calculating FTEs
182 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: One story condominium comlplex - tenant specification for LEED
in LEED Rating System Selection Q&A
593 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: SSp1 fo contiguous sites
in New LEED Guidance for Campuses and Multiple Buildings
489 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Jul 26, 2014
RE: EBOM review timeline
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
545 Michael Smithing
Director - Green Building Advisory
Colliers International
Thu, Jul 24, 2014
RE: LEED AP BD+C V4
in Experience Requirement Loosened for LEED v4 AP Exam
12 Filipe Boni
Brain
Wed, Jul 23, 2014
RE: Project Registration Required
in A New, More Accessible LEED Online for LEED v4
10 Megan Sparks
Manager, Program Integration
U.S. Green Building Council
Wed, Jul 23, 2014
RE: LEED Volume Program - Submittal Guidance
in Forum for LEED Volume Program Certification
6 Katie Peterschmidt
Associate Director, CORE Steward
Cooper Carry
Thu, Jul 17, 2014
RE: LEED v4 Green Associate
in 10 Tips for Passing the LEED Green Associate Exam
57 Tonima Ferdous
Thu, Jul 17, 2014
Mixing Solar PV, LED Lighting and LEED GA Accreditation
in Start a New LEED Discussion Topic
114 Daniel Valdes
Solar PV & LED Specialist
Infinitum Energy
Tue, Jul 15, 2014
LEED v4 CIR
in Got Technical Questions on LEED v4?
54 Charalampos Giannikopoulos
Mon, Jul 14, 2014
RE: Excellent
in GBCI Invites Direct Inquiries—But Do Your Homework First
17 Elizabeth Thompson
LEED Specialist
USGBC
Wed, Jul 9, 2014
RE: Large footage residence and threshold adjustment
in LEED for Homes (LEED-H) Forum
131 Ann Edminster
founder/principal
Design AVEnues LLC
Tue, Jul 8, 2014
RE: Licensed Professional Exemption (LPE) - outside of USA
in Licensed Professional Exemption
19 Sylvain laporte
GASD-Co
Tue, Jul 8, 2014
RE: Reusing IO credits for recertification
in Recertification
58 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Thu, Jul 3, 2014
LEED Membership Statistics Tool
in LEED App Store Coming Soon – What's on Your Wish-List?
4 Spencer Kim
Mon, Jun 30, 2014
RE: Foreign currency - Israel
in International Projects - alternative compliance path
152 Jaida Holbrook
Enivronmental Engineer
Skanska Sverige AB
Fri, Jun 27, 2014
Final review appeal for credit EAc1, new energy model
in Review Appeal
30 Veronica Reed
Founder
SDSARCH CIA. LTDA.
Thu, Jun 19, 2014
RE: Article
in LEED Fellow Yudelson to Lead Rival Green Globes
15 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jun 17, 2014
RE: Submitting for Review & Terminolgy
in Living with LEED Online - quirks, bugs and hiccups
133 Charles Nepps
Mon, Jun 16, 2014
Marking credits as Complete
in Registering Projects
17 kelly ryan
Mon, Jun 9, 2014
Title Votes Comments Most Recent Post
RE: Low VOC
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
351 64 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Nov 12, 2009
Outside of the US
in CS 2009 EAc6: Green Power
341 68 Pia Öhrling
WSP
Mon, Sep 21, 2009
RE: Outside of the US
in CS 2009 EAc6: Green Power
340 68 Gunnar Hubbard, AIA, LEED Fellow
Principal
Thornton Tomasetti
Fri, Sep 25, 2009
Low VOC
in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
338 64 Rona Easton
HOK
Thu, Nov 12, 2009
RE: Process water for EP point
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
338 51 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Wed, Dec 23, 2009
RE: Site Master Plan - Recalculations
in Schools 2009 SSc9: Site Master Plan
331 21 Shannon Gray
Consultant
YRG sustainability
Mon, Dec 7, 2009
RE: What constitutes a "Master Plan"?
in Schools 2009 SSc9: Site Master Plan
331 21 Shannon Gray
Consultant
YRG sustainability
Mon, Jan 4, 2010
Tenant spaces are simple, right?
in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
330 79 Richard McKay
Mon, Feb 1, 2010
RE: Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
328 119 Steve Loppnow
Sustainability Manager
YR&G
Mon, Dec 7, 2009
RE: 7th ed. Massachusetts Building Code and ASHRAE 62.1-2004
in NC 2009 IEQc2: Increased Ventilation
328 79 Paul Girello
Fri, Jan 22, 2010
Master Plan:Open Space
in Schools 2009 SSc9: Site Master Plan
325 21 Erik Bergstrom
Green Building Associate
Wed, Dec 9, 2009
RE: Question Regarding Requirements
in Schools 2009 IEQc8.2: Daylight and Views—Views
322 63 Joshua Radoff
Principal, LEEDuser Primary Author
YRG sustainability
Wed, Sep 30, 2009
RE: Retail space parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
321 119 Devon Bertram
Sustainability Manager
YR&G
Mon, Dec 7, 2009
Creating the Floor Plan to show direct access to views
in Schools 2009 IEQc8.2: Daylight and Views—Views
320 63 Kim Pomeranz
Thu, Oct 8, 2009
RE: Creating the Floor Plan to show direct access to views
in Schools 2009 IEQc8.2: Daylight and Views—Views
319 63 Joshua Lloyd
Phillip Markwood Architects
Thu, Oct 8, 2009
Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
318 119 Peter Doo
President
Doo Consulting, LLC
Tue, Nov 17, 2009
Site Master Plan - Recalculations
in Schools 2009 SSc9: Site Master Plan
318 21 Erik Bergstrom
Green Building Associate
Mon, Dec 7, 2009
RE: Is this a typo?
in CS 2009 MRc6: Certified Wood
317 28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 29, 2009
The Square Footage
in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
316 82 Alejandro Alfaro
Project Director Mexico
PGAL
Wed, Dec 9, 2009
RE: Interior renovation within a single tenant building
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
315 119 Mara Baum
Healthcare Sustainable Design Leader
HOK
Tue, Dec 8, 2009
Title Comments Most Recent Post
GBCI Invoices have no bank account info!
in Understanding the Cost of LEED-NC Project Certification
72 Marcio Alberto Casado Pereira
Fri, Jul 25, 2014
LEED Exam Prep Course Reviews & Recommendations
in LEED AP Specialities: Should You Get One?
29 quinn redman
Thu, Jul 24, 2014
Precertification of EPD
in NC-v4: Building product disclosure and optimization - environmental product declarations
6 Charalampos Giannikopoulos
Wed, Jul 23, 2014
Library and Laboratory Weighting Factors
in EBOM 2009 IEQc3.2: Green Cleaning—Custodial Effectiveness Assessment
64 Kara Edmonson
Tue, Jul 22, 2014
Over-kill duct insulation
in NC v2.2 EAc1: Optimize Energy Performance
293 Steve Tucker
Tue, Jul 22, 2014
L-6 Project Sections/ Elevations
in PIf4: Schedule and Overview Documents
1 Jaclyn Noga
Environmental Intern
EHRA, LLC
Tue, Jul 22, 2014
Correct invoice structure for millwork
in NC 2009 MRc7: Certified Wood
351 Susan Di Giulio
Project Manager
Zinner Consultants
Tue, Jul 22, 2014
Proprietary Ingredients
in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
67 Elizabeth Felder
Mon, Jul 21, 2014
Beach Cleanup of Trash - credit?
in EBOM 2009 MRp2: Solid Waste Management Policy
21 Nate Gillette
Director
Natura Architectural Consulting LLC
Mon, Jul 21, 2014
CLO level adjustments
in NC-v4: Thermal comfort
2 Adam Kingsbury
Mon, Jul 21, 2014
CASE 2 and EAP2 Cumpliance
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
451 João Gaio
Mon, Jul 21, 2014
IEQc7.1, MET and CLO, and Acceptable Alterations
in NC 2009 IEQc7.1: Thermal Comfort—Design
189 Adam Kingsbury
Mon, Jul 21, 2014
Case 2, Option 2 clarification - years
in EBOM-v4: Minimum energy performance
2 Alexa Stone
ecoPreserve - Building Sustainbility
Mon, Jul 21, 2014
Compliance paths for estar eligible buildings with scores <75
in EBOM-v4: Minimum energy performance
2 Alexa Stone
ecoPreserve - Building Sustainbility
Mon, Jul 21, 2014
SSc 3.3 Parking Availbility
in Retail–CI-v2009: Alternative transportation
3 Jaclyn Noga
Environmental Intern
EHRA, LLC
Mon, Jul 21, 2014
System CRI certified
in EBOM 2009 IEQc3.4: Green Cleaning—Sustainable Cleaning Equipment
43 Gabriel Frasson
Project Manager
OTEC
Mon, Jul 21, 2014
Is it possible for the flush-out start date to vary by floor?
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
63 Akos Brandecker
Sustainability Manager
ISG
Mon, Jul 21, 2014
Re-certification of a LEED 2009 EBOM project in 2017
in PIf1: Minimum Program Requirements
1 Melissa Merryweather
Director
Green Consult-Asia
Sun, Jul 20, 2014
10% Exemption
in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
54 Elizabeth Felder
Fri, Jul 18, 2014
ASHRAE 62.1-2013 Version
in NC-v4: Minimum indoor air quality performance
4 Adam Stoker
Sustability Consultant
University of Calgary
Fri, Jul 18, 2014

Copyright 2014 – BuildingGreen, Inc.