Log in
LEED v2009
Commercial Interiors
Materials and Resources
Materials Reuse—Furniture and Furnishings

LEED CREDIT

CI-2009 MRc3.2: Materials reuse - furniture and furnishings 1 point

See all forum discussions about this credit »

Credit achievement rate

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

LEEDuser expert

Susie Spivey-Tilson

susie.spivey@cbre.com

CBRE
LEED Fellow, Senior Program Manager for Global Energy & Sustainability

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Use salvaged, refurbished or used furniture and furnishings for 30% of the total furniture and furnishings budget.

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

4/8/2016Updated: 5/4/2016
Form Update
Description of change:
added ID+C example tab and additional instructions.
Campus Applicable
No
Internationally Applicable:
No
1/15/2016Updated: 4/7/2016
Form Update
Campus Applicable
No
Internationally Applicable:
No
4/14/2010Updated: 2/14/2015
Reference Guide Correction
Description of change:
Replace the last paragraph (beginning with "The replacement values...") with the text "The replacement values used in MR Credit 3.2 are part of the total Division 12 material value, which is also used in the calculations for MR Credit 5. Materials qualifying as reused for MR Credit 3 cannot be applied to MR Credits 1,2,4,6, or 7."
Campus Applicable
No
Internationally Applicable:
No
11/2/2009Updated: 2/14/2015
Reference Guide Correction
Description of change:
In the box, replace all instances of "(sf)" with "($)" so the text becomes "Replacement Value of Reused Furniture and Furnishings ($) / Total Value of New and Reused Furniture and Furnishings ($)"
Campus Applicable
No
Internationally Applicable:
No
11/2/2009Updated: 2/14/2015
Reference Guide Correction
Description of change:
In the third line of the paragraph, remove "furniture, furnishings components" so the text becomes "Exclude artwork, interior plants, and musical instruments."
Campus Applicable
No
Internationally Applicable:
No
8/27/2007
LEED Interpretation
Inquiry:

Our client has created a master plan on the relocation of their existing furniture and furnishings, which accounts for over 30% of their total new furniture and furnishings budget. Their plan is to divert approximately 15% of existing furniture and furnishings to their new facility, 30% to another office of theirs in a nearby city, less than 15 miles away. In addition, around 55% of furniture and furnishings are being sublet to new tenants of the space they are moving from. If we only account for the items being reused in their new facility we wouldn\'t be able to achieve the requirements of credit MR 3.3. However, salvaging and reusing furniture and furnishings (per the intent) reduces demand for virgin materials, as well as diverts materials from the landfill. Does this cohesive strategy meet the intent of credit MR 3.3?

Ruling:

While the strategy adopted for the use of the used furniture is commendable, only furniture that is reused for the specific project can be accounted for in MRc3.3 calculations. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
1/10/2008
LEED Interpretation
Inquiry:

Our client is planning to reuse existing office equipment (e.g. computers, printers, and copy machines). These items are in use in their current space and the owner plans to move them to the new space. While old equipment may not be operationally energy efficient, unless it is ENERGY STAR, reusing it does save energy and other resources by reducing the demand for new machines. By extension, reusing products and materials supports solid waste management goals. The itemized list in CSI MasterFormat Division 12 does not specifically include any computer/electronic equipment. Furthermore, given your emphasis above, "reducing impacts associated with the extraction and processing of virgin resources," please clarify the following. 1. Will the reuse of existing office equipment (e.g. computers, printers, and copy machines) help contribute in achieving LEED-CI MRc3.3? 2. What is the definition of a workstation?

Ruling:

No, computers and other electronic equipment cannot be included in the calculations for MR Credit 3.3. This credit is based only on items covered under CSI MasterFormat Division 12 as stated on page 231 of the LEED-CI v2.0 Reference Guide. Please refer to page 232 for a list of typical items that may be included under this credit. A workstation can be panel-based, comprised of modular interconnecting panels, hang-on components, and drawer/filing components or a free-standing grouping of furniture items with components that have been designed to work in concert. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Credit achievement rate

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

LEEDuser expert

Susie Spivey-Tilson

susie.spivey@cbre.com

CBRE
LEED Fellow, Senior Program Manager for Global Energy & Sustainability

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Use salvaged, refurbished or used furniture and furnishings for 30% of the total furniture and furnishings budget.

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

Got the gist of MRc3.2 but not sure how to actually achieve it? LEEDuser gives step-by-step help. Premium members get:

  • Checklists covering all the key action steps you'll need to earn the credit.
  • Hot tips to give you shortcuts and avoid pitfalls.
  • Cost tips to assess what a credit will actually cost, and how to make it affordable.
  • Ideas for going beyond LEED with best practices.
  • All checklists organized by project phase.
  • On-the-fly suggestions of useful items from the Documentation Toolkit and Credit Language.

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.

LEEDuser expert

Susie Spivey-Tilson

susie.spivey@cbre.com

CBRE
LEED Fellow, Senior Program Manager for Global Energy & Sustainability

See all LEEDuser forum discussions about this credit » Unsubscribe from discussions about CI-2009 MRc3.2