Topic | Recent |
---|---|
Entryway SystemsNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Lara Ibarra on Sep 15, 2020, 3:41 pm
Hi everyone, For the entryway systems, the guide doesn't specify if it has to be installed inside and/or outside the building's entrance. Does anyone know if it can be installed 5 feet... Last reply: Andrey Kuznetsov, May 30, 2024, 3:37 am |
|
Copy/Printing Room- Client against adding a doorCI-v4 EQc1: Enhanced indoor air quality strategiesposted by Edgar Arevalo on May 29, 2024, 12:03 pm
I am working on a CI project where the client is against putting a self-closing door (or any door for that matter) to the copy/printing room inside the project space. Typically, I have ran into... Last reply: Andrey Kuznetsov, May 30, 2024, 1:49 am |
|
Pilot Credit: Prevention Through Design CommentPilot-Credits IPpc93: Prevention through designposted by Afogreen Build on May 30, 2024, 12:48 am
To comply with this credit, the project team should fill out the Prevention Through Design worksheet (PtD) for Life Cycle Safety and Health, which is divided into two stages: Operation &... |
|
Glare-control: buildings with skylightCS-v4.1 EQc4: Daylightposted by Daniela Corcuera on Dec 18, 2023, 9:17 am
Hello! I am analysing a warehouse building where the daylight is through skylight in a high ceiling. The reference guide states "manual glare-control devices, such as blinds, are... Last reply: Andrey Kuznetsov, May 30, 2024, 12:12 am |
|
Group Approach?LEED Rating System Selectionposted by Santiago Avila on May 27, 2024, 10:42 am
Hello everyone, I am currently working on a project consisting of two residential towers (deep retrofit). Although they appear to be connected from the outside, the only connection... Last reply: Glen Boldt, May 29, 2024, 11:51 pm |
|
Products applied offsite and non-Occupied spacesNC-v4.1 EQc2: Low-emitting materialsposted by elias eid on May 28, 2024, 4:31 am
Hi all; I would ask if the products applied offsite such as(paint for steel structural sections, Aluminum profiles, Wooden doors,...) and products applied within non-occupied spaces... Last reply: Andrey Kuznetsov, May 29, 2024, 10:25 pm |
|
Modeling a backup District energy sourceCS-2009 EAp2: Minimum Energy Performanceposted by Florian Pingaud on Dec 9, 2014, 6:41 am
Dear All, I am requesting help on the energy modeling protocol for a building both connected to a stand-alone plant and a... Last reply: Andrey Kuznetsov, May 29, 2024, 9:08 am |
|
Calculations or descriptionsNC-2009 EAc5: Measurement and Verificationposted by Barbara Aguirre Garcia on May 24, 2024, 3:25 pm
For credit, is it necessary to make calculations within the plan, regarding the baseline calculation, the reporting period? Or is it just describing the elements to do the calculations? How is it... Last reply: Marcus Sheffer, May 28, 2024, 12:38 pm |
|
IAQ REPORTSEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Nagaraj Sankar on May 27, 2024, 10:12 pm
Regarding the v4.1 EBOM... |
|
IAQ test reportEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Nagaraj Sankar on May 27, 2024, 2:34 pm
The followingIn one of our project we have met the CO2 and... |