Log in
Forum
Topic

Question on supplying fresh air to unoccupiable spaces

NC-v4 EQp1: Minimum indoor air quality performance
posted by Mohamed AbuShariah on May 8, 2024, 2:31 am

https://leeduser.buildinggreen.com/forum/regularly-occupied-area-hotel-room). Log in or register to post comments ...

Last reply: Andrey Kuznetsov, May 13, 2024, 4:25 pm

Embodied Carbon Benchmarks

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by Sarah Manuszak on May 13, 2024, 1:55 pm

I am pleased to see embodied carbon being addressed in LEED v5's Materials and Resources (MR) category. However, both the Assess Embodied Carbon prerequisite and the Reduce Embodied Carbon credit...

Worksheet as helpful tool

Pilot-Credits IPpc93: Prevention through design
posted by Greg Romanczyk on Feb 26, 2018, 10:55 am

We found the PtD worksheet to be a helpful tool during Design and Construction process reviews. Our project is a University project, where the Safety + Health Mission of the University aligned...

Last reply: EST220910BF6 ESTIMPAC SAS DE CV, May 13, 2024, 1:23 pm

Regularly occupied area of an hotel room

NC-v4 EQc7: Daylight
posted by Ilse Dijkstra-Nugteren on Apr 5, 2016, 6:34 am

Should the entrance area of a hotel room (small area (

Last reply: Deborah Lucking, May 13, 2024, 11:38 am

Natural vs mechanical ventilation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Dina El-Sady on Sep 11, 2023, 11:42 pm

A project has a production building with a warehouse and is beinng naturally ventilated with exhaust air louvers and fresh air louvers .The machinery has direct exhaust fans to remove heat...

Last reply: Andrey Kuznetsov, May 13, 2024, 3:49 am

INpc155- Design for Indoor Air Quality and Infection Control

CS-v4 INc1: Innovation
posted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm

Hi all, 

The Pilot Credit: Design for...

Last reply: Maria Porter, May 13, 2024, 2:46 am

Existing fixture with no data available

CI-v4 WEp1: Indoor water use reduction
posted by Julie Hardy on Apr 23, 2024, 3:48 pm

Hello, 

We have a CI project within an existing building. We are replacing nearly half of the plumbing fixtures, but we still have old toilets and faucets with no available information....

Last reply: Andrey Kuznetsov, May 12, 2024, 9:12 am

Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsm

Schools-NC-v4 WEp2: Indoor water use reduction
posted by Alexia Anastassiadis on Jan 4, 2024, 4:10 pm

Hi all!

I am working in a High School project and have separated my Groups into Students and Staff, however, when I try to set the Uses per Day to zero for...

Last reply: emily reese moody, May 11, 2024, 5:23 pm

What if Question- Bathroom removed from scope, how to comply with WEp1?

CI-v4 WEp1: Indoor water use reduction
posted by Edgar Arevalo on Mar 21, 2024, 2:57 pm

How would a project comply with WEp1 if the bathroom was removed from scope.  This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of...

Last reply: emily reese moody, May 11, 2024, 5:18 pm

SRI VALUE OF SOLAR ROOF

NC-v4 SSc5: Heat Island Reduction
posted by Shameen Dharmasena on Nov 4, 2021, 7:26 am

Hello, 

If a roof totally covered with Solar Panels, then how to calculate...

Last reply: emily reese moody, May 11, 2024, 4:41 pm