Topic | Recent |
---|---|
Can ID+C be selected for whole building?LEED Rating System Selectionposted by Leo LeQuoc on Jan 29, 2024, 11:20 pm
Our team is working on a project of a whole 2-storey (to be) newly constructed office building. I wonder (1) whether we can apply both floors to ID+C rating system or it has to be a single... Last reply: Andrey Kuznetsov, May 8, 2024, 10:35 am |
|
New Requirement? CDPH Emissions Testing Under Certain Conditions?NC-v4.1 EQc2: Low-emitting materialsposted by Brian Salazar on May 8, 2024, 9:46 am
I have recently had LEED review for LEM kicked back because the Greenguard Gold or other material certificates were presumed under CDPH v1.2 for Classroom environment vs Office environment. I... Last reply: Emily Purcell, May 8, 2024, 10:39 am |
|
LEED certification for advanced construction processLEED Rating System Selectionposted by Glenn Roosen on Mar 26, 2024, 8:40 am
Good afternoon, I have a question regarding a project that is in the end phase of the construction works (final delivery of the building in September 2024), and they would like to see if a... Last reply: Kath Williams, May 8, 2024, 10:41 am |
|
BD+C: Multifamily Midrise or New Construction?LEED Rating System Selectionposted by Victoria Rios Esteve on Sep 20, 2021, 6:08 pm
Hi everyone! We have some doubt on which would be the most suitable rating system for a project. It is a 9-stories residential building. So, we believe it can be either BD+C: Multifamily... Last reply: Andrey Kuznetsov, May 8, 2024, 4:12 am |
|
Residential High-Rise: BD+C New Construction vs. LEED HomesLEED Rating System Selectionposted by Vitor Leite Goncalves on Jun 30, 2023, 12:56 pm
Hello all, The project is a 6-story residential building located in the United States. USGBC website says that... Last reply: Andrey Kuznetsov, May 8, 2024, 4:03 am |
|
Lack of Bicycle Network FacilityCS-v4 LTc6: Bicycle facilitiesposted by Junaid Khan on Aug 8, 2018, 1:41 am
Hi Our firm is currently working on a core & shell project of an office building. We've designed a bicycle facility in accordance with the LEED credit compliance, within the building... Last reply: Brightworks Sustainability, May 7, 2024, 11:53 pm |
|
Interiors Life-Cycle Impact Reduction- Option 3 Design for FlexibilityCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Laura Riegle on Jul 13, 2022, 9:26 am
Hi, I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project. In the project, there are concrete floors (no systems to... Last reply: Brightworks Sustainability, May 7, 2024, 9:27 pm |
|
Timeline to join for project teamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Christoph Weindl on Sep 25, 2020, 11:27 am
We're pursuing "Social equity within the project team" with Option 2. Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years... Last reply: Robert Gomez, May 7, 2024, 7:52 pm |
|
SRI VALUE OF SOLAR ROOFNC-v4 SSc5: Heat Island Reductionposted by Shameen Dharmasena on Nov 4, 2021, 7:26 am
Hello, If a roof totally covered with Solar Panels, then how to calculate... Last reply: Talia Mamayek, May 7, 2024, 4:35 pm |
|
All Gender Restrooms- Conversations with Project TeamsPilot-Credits WEpc147: All-Gender Restroomsposted by Annalise Dum on Sep 29, 2022, 1:08 pm
What have teams found as successful ways to integrate all-gender restrooms into their projects? As a consultant, sometimes it is difficult to convince the client that individual occupant (and all... Last reply: Bethany Beers, May 7, 2024, 4:04 pm |