Topic | Recent |
---|---|
Question on supplying fresh air to unoccupiable spacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Mohamed AbuShariah on May 8, 2024, 2:31 amhttps://leeduser.buildinggreen.com/forum/regularly-occupied-area-hotel-room). Log in or register to post comments ... Last reply: Andrey Kuznetsov, May 13, 2024, 4:25 pm |
|
Embodied Carbon BenchmarksLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Sarah Manuszak on May 13, 2024, 1:55 pm
I am pleased to see embodied carbon being addressed in LEED v5's Materials and Resources (MR) category. However, both the Assess Embodied Carbon prerequisite and the Reduce Embodied Carbon credit... |
|
Worksheet as helpful toolPilot-Credits IPpc93: Prevention through designposted by Greg Romanczyk on Feb 26, 2018, 10:55 am
We found the PtD worksheet to be a helpful tool during Design and Construction process reviews. Our project is a University project, where the Safety + Health Mission of the University aligned... Last reply: EST220910BF6 ESTIMPAC SAS DE CV, May 13, 2024, 1:23 pm |
|
Regularly occupied area of an hotel roomNC-v4 EQc7: Daylightposted by Ilse Dijkstra-Nugteren on Apr 5, 2016, 6:34 am
Should the entrance area of a hotel room (small area ( Last reply: Deborah Lucking, May 13, 2024, 11:38 am |
|
Natural vs mechanical ventilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Dina El-Sady on Sep 11, 2023, 11:42 pm
A project has a production building with a warehouse and is beinng naturally ventilated with exhaust air louvers and fresh air louvers .The machinery has direct exhaust fans to remove heat... Last reply: Andrey Kuznetsov, May 13, 2024, 3:49 am |
|
INpc155- Design for Indoor Air Quality and Infection ControlCS-v4 INc1: Innovationposted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm
Hi all, The Pilot Credit: Design for... Last reply: Maria Porter, May 13, 2024, 2:46 am |
|
Existing fixture with no data availableCI-v4 WEp1: Indoor water use reductionposted by Julie Hardy on Apr 23, 2024, 3:48 pm
Hello, We have a CI project within an existing building. We are replacing nearly half of the plumbing fixtures, but we still have old toilets and faucets with no available information.... Last reply: Andrey Kuznetsov, May 12, 2024, 9:12 am |
|
Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsmSchools-NC-v4 WEp2: Indoor water use reductionposted by Alexia Anastassiadis on Jan 4, 2024, 4:10 pm
Hi all! I am working in a High School project and have separated my Groups into Students and Staff, however, when I try to set the Uses per Day to zero for... Last reply: emily reese moody, May 11, 2024, 5:23 pm |
|
What if Question- Bathroom removed from scope, how to comply with WEp1?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Mar 21, 2024, 2:57 pm
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of... Last reply: emily reese moody, May 11, 2024, 5:18 pm |
|
SRI VALUE OF SOLAR ROOFNC-v4 SSc5: Heat Island Reductionposted by Shameen Dharmasena on Nov 4, 2021, 7:26 am
Hello, If a roof totally covered with Solar Panels, then how to calculate... Last reply: emily reese moody, May 11, 2024, 4:41 pm |